05000315/LER-1980-001-03, /03L-0:on 800123,while Performing Airlock Seal Leak Rate Testing,Inner Airlock Declared Inoperable.Caused by Broken Adjustment Bolt.Bolt Will Be Replaced During Next Unit Refueling Outage

From kanterella
(Redirected from ML17326A530)
Jump to navigation Jump to search
/03L-0:on 800123,while Performing Airlock Seal Leak Rate Testing,Inner Airlock Declared Inoperable.Caused by Broken Adjustment Bolt.Bolt Will Be Replaced During Next Unit Refueling Outage
ML17326A530
Person / Time
Site: Cook 
Issue date: 02/22/1980
From: Michael Brown
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17326A529 List:
References
LER-80-001-03L-01, LER-80-1-3L-1, NUDOCS 8002290436
Download: ML17326A530 (2)


LER-1980-001, /03L-0:on 800123,while Performing Airlock Seal Leak Rate Testing,Inner Airlock Declared Inoperable.Caused by Broken Adjustment Bolt.Bolt Will Be Replaced During Next Unit Refueling Outage
Event date:
Report date:
3151980001R03 - NRC Website

text

QB 0

2 2

2 8

0 QB 74 75 REPORT DATE 80 NRC FORM9366 U. S. NUCLEAR REGULATORY COMMISSION (7-77)

LtCENSEE EVENT REPORT 7

)

4 CONTROL BLOCK:

QI tPLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

I 6

0 C

'C 1Q2 0

0

0 0

0 0

0

0 0

Qs 1

1 OR~OR 7

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T

~oi

" ~L~

0 3

0 0

0 3

1 3

QP 0

1 2

3 8

SOURCE 7

8 60 61 DOCKET NUMBER 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES QIO WHILE PERFORMING AIRLOCK SEAL LEAK RATE TESTING PER STP.204 THE INNER AIRLOCK LEAKAGE RATE EXCEEDED THE ACCEPTANCE CRITERIA OF THE TEST.

THE AIRLOCK WAS DECLARED INOPERABLE PER TECH.

SPEC. 3.6.1.3.B.

ACTION ITEMS

~O3

~O

~OS WERE FOLLOWED.

NO PREVIOUS FAILURES HAVE BEEN EXPERIENCED WITH THIS PORTION OF THE AIRLOCK SEAL.

PUBLIC HEALTH AND SAFETY WERE NOT AFFECTED BY THIS EVENT.

THE OUTER AIRLOCK DOOR SEAL REMAINED OPERABLE DURING THIS EVENT.

~O7

~OB 80 7

8 7

8 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE CQMPONENTCODE SUBCODE SUBCODE

~BA Q)1 E

Q)2

~8Q)3 P

E N

E

'4

~O)s ~ O)s 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LFRIRP EVENT YEAR REPORT NO.

CODE TYPE NO.

Q)7 RRPRRT

~80

~

~00 1

~W

~03

~L

~

0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDP PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER

~EO)8 ~Q19

~ZQ20

~ZO2) 0 0

0 0

+N Q23

~NQ24

~NO28 W

3 0

0 Q28 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o

THE SEAL FAILURE WAS TRACED TO A BROKEN ADJUSTMENT BOLT.

ADJUSTING OTHER ADJUSTING BOLTS RESULTED IN A SEAL WHICH MET THE ACCEPTANCE CRITERIA OF STP.204.

THE BROKEN BOLT WILL BE REPLACED DURING THE NEXT 3

UNIT REFUELING OUTAGE.

CAUSE OF BROKEN BOLT COULD NOT BE DETERMINED.

4 THE SAME TEST PERFORMED 3 DAYS EARLIER WAS SUCCESSFUL.

CZ3 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ 6

~Z Q33 Z

Q3 NA 7

8 9

10 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION 39

~00 0

Q37 Q38 7

8 9

11 12 13 PERSONNEL INJURIES 7

8 9

11 12 LOSS OF OR DAMAGE.TOFACILITYQ43 TYPE

DESCRIPTION

g Z

Q42 NA 7

8 9

10 PUBLICITY ISSUED DESCRIPTIONQ O

~NQ44 NA 7

8 9

10 I-OCATION OF RELEASE Q36 4S NRC USE ONLY 7

8 9

FACILITY

~30 METHOD OF STATUS 38 POWER OTHER STATUS ~

DISCOVERY DISCOVERY DESCRIPTION Q32 1

8

~~

Q28 ~~~

Q29 NA"

~BQ31 SURVE ILLANCE TESTING 8

9 10 12 13 44 45 46 80 80 80 80 80 80 M. S.

BROWN NAME OF PREPARER 68 69 80 o PHPNEI 616-465-5901 EXT.

3

l.

I