Requests Addl Info Re Licensee 890830 Amend Application Under Generic Ltr 87-09 for Exceptions to Tech Spec 3.0.4, Including Affirmation That Remedial Measures Prescribed for Affected Action Statements Consistent W/Updated SAR
ML17325B424
Person / Time
Site: Cook  
Issue date: 03/13/1990
From: Giitter J
Office of Nuclear Reactor Regulation
To: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
GL-87-09, GL-87-9, TAC-74827, TAC-74828, NUDOCS 9003200279
Download: ML17325B424 (6)


Text

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 13, 1990 DOCKET NOS.

50-315 and 50-316 Mr. Milton P. Alexich, Yice President Indiana Viichigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Mr. Alexich:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THE LICENSEE AMENDMENT APPLICATIOH UNDER GENERIC LETTER 87-09 FOR D.C.

COOK (TAC NOS.

74827 AHD 74828)

The basis for accepting Technical Specification (TS) 3.0.4-related amendments under Generic Letter 87-09 is predicated on two assumptions, namely: (I) that tIie remedial measures prescribed by the Technical Specification ACTION STATEt~iEHTS for which the exception will be granted provide a sufficient level of protection to permit operational II'ode changes and safe long-tern operation consistent with the licensing basis described in the Updated Safety Analysis Report for D. C. Cook; and (2) that it will be the exception when plant startup commences with importarit safety features inoperable, irrespective of the exceptions granted in response to applications urider Generic Letter 87-09.

The staff has reviewed your license amendment application under Generic Letter.

87-09, submitted by your letter dated August 30, 1989.

In order, for the I'lRC staff to conclude that the safety basis relative to the above stated assumiptions is satisfied, the staff requests that for the proposed TS exception tc be granted under Gen'eric Letter 87-09, you affirm that remedial measures prescribed for the affected ACTION STATEIIENTS are consistent with the Updated Safety Analysis Report and its supportirg safety analyses.

In addition, we request

.hat you identify and affirm those administrative controls (e.g.,

maintenance program provisions, plant operatirig procedures, management directives, onsite safety reviews, etc.) that have been established to limit the use of the TS 3.0.4 exceptions granted.

Your affirmation should address trainiing necessary for ensuring that plant operators are made aware of and are instructed to excercise the controls promulgated in limiting the use of such exceptions.

9003200279 900313 PDR ADOCK 050003i5 P

PDC t'o

t I

Please advise, within five days after receipt of this letter, when the staff may expect to receive your response.

Should there be any questions concerning this request, please let me know.

The request in this letter affects fewer than ten respondents; therefore, ORB clearance is not required under P.L.96-511.

S incerely, Ortginal Signed by Joseph Giitter, Project tianager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation DISTRIBUTION

'DOCKET GG.~

RF JTHONA JGIITTER 0 @er g/eP/~

0 /le-/90

( A@IRI31:0Rs P JHOHA 03/Q/90 I

t

~ ~

h h

't Ij fh h

~

~

I h

~

I g

I

-~

thj!

,h

~

$ ht f\\1 S

Please advise, within five days after receipt of this letter, when the staff may expect to receive your response.

Should there be any questions concerning this request, please let me know.

The request in this letter affects fewer than ten.respondents; therefore, ONB clearance is not required under P.L.96-511.'incerely, oseph Giitter, Project Manager Project Directorate III-1 Division of Reactor Projects

-. III, IY, V 5 Special Projects Office of Nuclear Reactor Regulation

,tir,. Milton Alexich

'-Indiana Michigan Power

Company, Donald C.

Cook Nuclear Plant CC:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgman, Michigan 49106 Al Blind, Plant Manager Donald C. Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensvi lie, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.H.

Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49I06 Special Assistant to the Governor Room I - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 h1r. S.

Brewer American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216