ML17325B395
| ML17325B395 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/09/1990 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| NUDOCS 9003150320 | |
| Download: ML17325B395 (2) | |
Text
Docket No. 50-315 Docket No. 50-316 Indiana Michigan Power Company ATTN:
Yir. Milton P. Alexich Vice President Nuclear Operations Division 1 Riverside Plaza
- Columbus, OH 43216 Gentlemen:
This confirms the discussion between Mr. B. Jorgensen and Mr. S. Brewer of our respective staffs to have a management meeting at 9:00 a.m.
(EST) on March 15, 1990, at the D. C.
Cook plant site at Bridgman, Michigan.
The purpose of this meeting is to discuss plant maintenance, material condition, and other items of mutual interest.
We will gladly discuss any questions you may haveconcerning this matter.
Sincerely, Or3.gi.rn1 s'I'pneum by "., ~'-. <"';...~::
cc:
A. A. Blind, Plant Manager DCD/DCB {RIDS)
Licensing Fee Management Branch Resident Inspector, RIII James R. Padgett, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Michigan Depart tment of Public Health Edward G. Greenman, Director Division of Reactor Projects PL)
Jofgensen/kjc RIII au@ac>
)(~()7 Greenman
~IIAK00, 40+
fp0
~E
~**+~
UNITED STATES CLEAR REGULATORY COMMISSION REGION III 799 ROOSEVELT ROAO GLEN CLLYN, ILLINOIS 60I37 NOTICE OF SIGNIFICANT LICENSEE MEFTTNG Name of Licensee:
Indiana Michigan Power Company Name of Facility:
Donald C.
Cook Docket Nos.:
50-315; 50-316 Date and Time of Meeting:
March 15, 1990 at 9:00 a.m.
(EST)
Location of Meeting:
D. C.
Cook Site 1 Cook Place
- Bridgman, MI Purpose of Meeting:
Management meeting to discuss maintenance, material condition and other items of mutual interest.
NRC Attendees:
A. B. Davis, Regional Administrator, RIII H. J. Miller, Director, Division of Reactor Safety, RIII J.
A. Zwolinski, Assistant Director for Region III Reactors, NRR B. L. Burgess, Chief, Projects Section 2A, RIII Others as designated by Region III Licensee Attendees:
M. P. Alexich, Vice President, Nuclear Operations A. A. Blind, Plant Manager, Donald C.
Cook Others as designated by the licensee NOTE:
Attendance at this meeting by NRC personnel should be made known to B. L. Burgess via telephone call (FTS 388-5689) by COB March 9, 1990.
Distribution:
J.
M. Taylor, Executive Director for Operations F. J. Miraglia, Associate Director for Inspection and Technical Assessment, NRR B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J.
G. Partlow, Associate Director for Projects, NRR G.
M. Holahan, Acting Director, Division of Reactor Projects III/IV/V,NRR J.
W. Clifford, RIIT Coordinator, EDO T. 0. Martin, Deputy Director, Division of Reactor Safety, RIII C.
E. Norelius, Director, Division of Radiation Safety and Safeguards, RIII G.
C. Wright, Chief, Operations
- Branch, DRS, RIII R.
W. Cooper, Chief, Engineering
- Branch, DRS, PIII L. R. Greger, Chief, Reactor Programs
- Branch, PRSS, RIII B. S. Mallett, Chief, Nuclear Materials Safety Branch, DRSS, RIII J. 0. Thoma, Acting Director, Directorate III-1, NPR
~
J.
- 6. Giitter, Licensing Project Manager, NRR