Documents 900125 Commitments Re Increased MSIV Closure Times.Licensee Will Develop Program to Monitor Steam Dump Valve Leakage Based on Either Quantitative or Qualitative Acceptance Criteria by 900208 & Evaluate Noted Alternatives
ML17325B376
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/31/1990
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1121, NUDOCS 9002070460
Download: ML17325B376 (5)


Text

ACCELERATED D UTION DEMON TION SYSTEM s

( ~

c REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS),

~

ACCESSION NBR:9002070460 DOC.DATE: 90/01/31 NOTARIZED: NO DOCKETS FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION

'LEXICH,M.P.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele

'ECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.

Document Control Branch (Document Control Desk)

SUBJECT:

Documents 900125 commitments re increased MSIV closure times.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL.

SIZE-TITLE: OR Submittal:

General Distribution NOTES:

R I

'.0 1

S RECIPIENT ID CODE/NAME PD3-1 LA GIITTER,J.

COPIES LTTR ENCL 1

5 RECIPIENT COPIES',

ID CODE/NAME LTTR ENCL PD3-1 PD INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: LPDR NSIC 1

1 1

1 1

1 NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E MB REG FIL 01 NRC PDR 1

1 1

1 1

'-R

I D

/

A NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIZI CONTACT THE.DOCUMENI'ONTROLDESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL ~;(3

'D

~

S

r 4

C gP QC g

Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 S

AEP:NRC:1121 Donald C.

Cook Nuclear Plant Unit 2 Docket No. 50-316 License No.

DPR-74 MAIN STEAM ISOLATION VALVES CONFIRMATION OF CORRECTIVE ACTION U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Attn:

T.

E. Murley January 31, 1990

Dear Dr. Murley:

This letter documents commitments made for the Donald C.

Cook Nuclear Plant during our January 25, 1990 conversation with NRR and Region III personnel regarding increased main steam isolation valve closure times.

The main steam isolation valves are activated by the steam dump valves which are connected to the main steam isolation valve steam chambers.

Venting of the upper portion of steam chamber moves a piston which closes the valve.

Leakage past the dump valves has been identified as a contributing factor to the slower main steam isolation valve closure times.

Therefore, the Indiana and Michigan Power Company will:

(1)

Develop a program to monitor steam dump valve leakage based on either quantitative or qualitative acceptance criteria by February 8,

1990, and (2)

Evaluate alternatives to repair or replace the steam dump valves to minimize leakage, and decide on a course of action by the end of the 1990 refueling outages for both units.

Implementation of the required action would occur prior to completion of the subsequent refueling outage.

This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, M. P. Alexich Vice President MPA/eh 9002070460 900131

'PDR-ADOCK 05000316 P

PDC

>0 lili

C

Dr. T. E. Murley AEP'NRC:1121 cc:

D. H. Williams, Jr.

A. A. Blind - Bridgman R.

C. Callen G. Charnoff NFEM Section Chief A. B. Davis - Region III NRC Resident Inspector

- Bridgman