ML17325B229
| ML17325B229 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/31/1989 |
| From: | Giles H, Will Smith, Stephens T INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8906140348 | |
| Download: ML17325B229 (9) | |
Text
gc IiZLEP>TED D1AklB1'T1ON DE}dON STFOI1 ON SY>~EH REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8906140348 DOC.DATE: 89/01/31 NOTARIZED: NO DOCKET g FACIL:50-316 Donald C.
Cook Nuclear Power, Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION GILES,H.
Indiana Michigan Power Co. (formerly Indiana
& Michigan. Ele STEPHENS,T.R.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele SMITH,W.G.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION J
SUBJECT:
Monthly'operating rept for Jan 1989 for DC Cook Nuclear Plant Unit 2.W/890206 ltr.
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:
R RECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: AEOD/DOA
'RM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN3 EXTERNAL: EG&G SIMPSON,F NRC PDR COPIES LTTR ENCL 4
1 1
1 1
2 2
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 10 N
-R PB 10 EG F LE 01 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 NCTE 'IO ALL "RODS" RZCZPrWrS PLEASE HELP US K) iKDUCE WASTE!
CXNZACT 'IHE DOCUMVr CONZROL DESK ROCM Pl-37 (EXI'. 20079)
TO ELIMINATE YMR NAME FRY DISTRIBVZIQN LISTS FOR DOCUMENTS YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 20
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 6I6 465 5901 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 February 6, 1989 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1989 is submitted.
Sincerely, W.
G. Smith, Jr.
Plant Manager WGS/jd cc:
B. A. Svensson NRC Region III D.
R.
Hahn EPRI Nuclear Safety Analysis Center R.
C. Callen S. L. Hall INPO Records Center ANI Nuclear Engineering Department D.
H. Will.iams, Jr.
N. P. Alexich J.
F.
Kurgan J. J.
Markowsky D. A. Timberlake D.
W. Paul T. 0. Argenta S.
H. Steinhart B. L. Jorgensen J.
R.
Sampson D. S. Climer E. A. Smarr ella Dolly Krieger T. R. Stephens 85'06l40348 890231 PDR ADOCK 050003i6 PDC
N.R.Q.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 01-Feb-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period JAN 89
',notes
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1 133
- 5. Design Electrical Rating (Net MWe) 1100 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11 'ours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH) 18.
Net Elect.
Energy Qen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six This Mo.
Yr. to Date 744 '
744.0 0
~ 0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0
0 0
0 0
0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Months (Type, Date,and Cumm..
97176.0 63595.1 0.0 62210.0 0.0 189566377 61896220 59584665 65.6 65.6 59.2 57.8 14.5 Duration):
Achieved
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Estimated date f g~
eh~
3.9&9
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
~ ~
ljerSIIitnWIVNSANn Inly IIFOIitWONS MOOR'I 1fPHIII lhlc C
v g)
Ic~
I.iccnscc I:venl Netunl 4 C'ause k Glneellvc Aeliun I>>
Plcvenl Iteeu<rcncw 189 880423
{cont' S
744
.8&C N/A zz zzzzzz The unit was removed from 'service on 880423 for cycle 6-7 refueling and steam generator repair project.
The reactor core reloading was completed January 20, 1989.
The expected date for return to service is Harch 1, 1989.
I': I'>>la:d S: Selledldeal I'l177I 1
Reas>>n:
A I'aiuipmenl I'ailusc IExplaln) ll MalnlcnallAIns Test C'cfuelina I) Regulxlwy Reslsk1hul I!4pcwl>>s I'lainlnsh Incense I'.xalnlnalkus I'-hdndnlsllallva 4 Oielali>>nai lillns II!xplab)I II I)lhcl II'.xplainI Mclhlxt:
I-Manual 2.Manual Scfanl.
3.Aulo>uallc 5:lain.
44hhcl Illxplain) 4 L'xhibil6. tuslsucli>>ns f>>l I'lellasatiiw nf I>ala Fnlly Shecls'fiu I3L~nscc Ilvcnl Returns It.t!RII:ileIHINI:G.
OI6II lixhlbilI - Salne Suuce
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-316 UNIT TWO DATE 01-Feb-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 JAN 89 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 T. R. Stephens (616) 465-5901 February 6, 1989 10f1 HIGHLIGHTS MONTHLY OPERATING ACTIVITIES - JANUARY 1989 The major work items of the steam generator repair project/refueling outage have been completed.
The core reloading was completed on January 20, 1989 and the reactor coolant system enter Mode 5 at 1704 hours0.0197 days <br />0.473 hours <br />0.00282 weeks <br />6.48372e-4 months <br /> on January 26.
Startup and surveillance testing is in progress.
Ir 1
'I P
I N
l
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook-Unit No.
2 Februar 6,
1989 T.
R. Ste hens 616 465-5901 lof1 MAJOR SAFETY-RELATED MAINTENANCE JANUARY 1989 There were no major safety-related maintenance problems during the month of January.
g v
~,r, J,
'P H
I'I II I