ML17325B227

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1989 for DC Cook Unit 1
ML17325B227
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/31/1989
From: Giles H, Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906140284
Download: ML17325B227 (10)


Text

At"CELE PATED D1~Bt'T]ON Ppgaq ~~ay REGULATORY INFORMATION DISTRIBUTION SYSTEM "(RIDS)

ACCESSION NBR:8906140284 DOC.DATE: 89/05/31 NOTARXZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana 6

05000315 AUTH.NAME AUTHOR AFFILIATION GILES,H.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele SMITH,W.G.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECXPIENT AFFILIATXON

SUBJECT:

Monthly operating rept for May 1989 for DC Cook Unit 1.

W/890602 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SXZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:

I

(

D RECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN3 EXTERNAL EGGG SIMPSON I F NRC PDR COPIES LTTR ENCL 4

4 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECXPXENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 10 RPB 10 EG F E

01 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

=

1 1

'1 R

MrE IO ALL iiRXDSii RECIPIENTS:

PIEASE HELP US TO REMKZ WASTE ~Cr IHE DOCUK>7 CORBEL DESKI ROOM Pl-37 (EXI'. 20079) R) EZJPGZATE YOUR NAME PKK DIPHKK7ZZQN LISTS FOR DOCUMENTS YOU DON'T NEZDt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, MI 49106 656 465 5901 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 June 2, 1989 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1989 is submitted.

Sincerely, W.

G. Smith, Jr.

Plant Manager WGS/jd cc:

B. A. Svensson NRC Region III D. R.

Hahn EPRI Nuclear Safety Analysis Center R. C. Callen S. L. Hall INPO Records Center ANI Nuclear Engineering Department D. H. Williams, Jr.

M. P. Alexich J.

F. Kurgan J. J.

Markowsky D. A. Timberlake D.

W. Paul T. 0. Argenta S.

H. Steinhart B. L. Jorgensen J.

R. Sampson D. S. Climer E. A. Smarrella Dolly Krieger T. R. Stephens 8906i40284 89053i PDR ADOCK 05000315 R

PDC

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 01-Jun-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit

2. Reporting Period NAY 89',notes
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net NWe) 1030 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1020

8. If Changes Occur in Capacity Ratings (It'ems no.

3 through 7) Since Last Report Give Reasons 9.

Pow'er Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions.

If. Any-

11. Hours in Reporting Period 12 No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours 14.

Houxs Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect..

Energy Gen.

(MWH) 18.

Net Elect. Energy Gen.

(MWH)

19. Unit. Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit. Forced Outage Rate 24.

Shutdowns Scheduled over Next Six f

This Mo.

Yr.

744.0 0 '0.0 0.0 0.0 0

0 0

0.0 0.0 0.0 0.0 0.0 Months (Type, to Date 3623.0 1809 '0.0 1804 '

0 '

4133062 1300260 1236191 49.8 49.8 33.5

33. 1 1 '

Date,and Cumm.

126359.0 92081.3 463.0

. 90423.4 321.0 261339477 85218460 81934980

72. 7 72-,7 64.6
62. 6

7.9 Duration)

25. If Shut Down At End of Report. Period, Estimated Date of Startup-E d

e for return to service June 19 1989.

26. Units in Test Status (Prior to Commercial Operation)

~

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 01-Jun-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 DAY.

1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 MAY 89 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

UNITSill)I>>01VNSANllFiliVEQ RK>>ll{llONS RfPgg~.giIINIII MAY 1989

>>0{:I{nNo

>>Am uturaamiltV mi.miONF.

16 465-

~

~

Nr.

l4lc I cnj I3<<en5ce I!vent lie{un{4 g~

zU K~

{<<uac k {.>>r res,tive Aeliorr lo Prevent liccurrcnee 279

{cont 890318 S

744 BLC N/A-22 222222 The unit was removed from service on 890318 for cycle XI refueling and maintenance outage.

The unit is in Node 5 with the core loaded.

RCS is filled to a pressurizer level of 30K (cold cal.) waiting completion of post refueling surveillances and performance testing.

I': I'Iu<<ed S: Sihcdrded Rc<<5>>n:

A.I:lilllpnlcntI'allure II:x)dain)

Ii 14lutcnartcc rrr leal

{.Rcfucltuw It Reydahny Rcalrlcllrut I'.Qietat>>r 'Iralnln{ikI3eenac I aarrtinatkur I'.Adnrlniatralive 4 {iierallruralbror II:aplainl II {)ther IIixphirrl NcthrrLI:

I-ihau<<I 24LNual Scf<<in.

3 An{run<<tie %5<<nr.

44hlrcr II:ap4lnl Ilainblt Ci ~ I>>art>>etio>>a for Prep<<rail>>n of I)ata Irntry Qrecta f>>r I3ccnace Ilvcnt Rcpcul {I.I:R I I'ik{Nit((i{r.

OI6I) txllrbrt I Sante Scullee

'L

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-315 D. C. Cook Unit 1 T. R. Stephens (616) 465-5901 June 2, 1989 lof1 HIGHLIGHTS:

MONTHLY OPERATING ACTIYITIES - MAY 1989 The unit entered the reporting period with the Reactor Coolant System in Mode 6 with the fuel off-loaded.

Core load was completed on 5/19/89.

The reporting period ended with the RCS in Mode 5 with a pressurizer level of 30K (cold cal.).

The unit is currently completing post refueling surveillances and performance testing prior to entry into Mode 4.

DETAILS 5-8-89 0228 0605 5-9-89 2157 5-10-89 0310 5-13-89 1245 5-19-89 0937 5-21-89 0830 5-24-89 1920 5-27-89 2345 5-28-89 0215 Commenced RCS fill.

The RCS at half loop.

Reactor head lifted.

Upper internals set.

Commenced core reload.

I Core load complete.

Reactor head set.

Entered Mode 5 (First 3 reactor stud retensioned to the first pass).

Commenced filling RCS.

Stopped filling RCS Pressurizer level 40% cold cal.

n I WV

~

I t

U tg I

H

~ ~

-t Hh Ui U

UWI It U

H W

ill I')

~

gt I

HHU I:

Ih

)1

~

H

" r U VW

~

IIHI Hil Wr H

~

~

I H>>P Ihtrr Ji

~

4 IIW'r tr hr H

~

W N t HU "I i 1

DOCKET NO 50-315 UNIT NAME D. C.

Cook - Unit No.

1 DATE June 2

1989 COMPLETED BY T. R. Ste ens TELEPHONE 616 465-5901

'PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE MAY 1989 AB emergency diesel generator governor linkage adjusted to match Worthington drawings.

Replaced the low voltage signal processor power supply to N23 source range indicators.

I I

4 N

a S

j,,

e 84gi, ~wag>

Jt l~

4

't' W

I Pj~ 8

~" gal) ta,,

Ti'I'= <<.'t 'i. tr4+i

~t4 V'<

~>.

v

,Ig r

M l

iz k,ll

~LPsasllr I h

'L I

g l y

~ ".~

s< li 1,'4 ll g>l ill llu'

<<tg "I f P '4

~

~

3 r~

ah 4 "'~.P o

P.

"i'~ 'Pea s

P c.