Monthly Operating Rept for Apr 1989 for DC Cook Nuclear Plant Unit 1.W/890504 Ltr
ML17325B206
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/30/1989
From: Giles H, Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906120244
Download: ML17325B206 (11)


Text

gc CPLERATED 1

l DISTRIBUT10N DEMO'CASTRATION t

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

II SYFI'EM ACCESSION NBR:8906120244 DOC.DATE: 89/04/30 NOTARIZED: NO DOCKET N FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana & 05000315 AUTH. NAME AUTHOR AFFILIATION GILES,H. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele SMITH,W.G. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPXENT AFFILIATION R

SUBJECT:

Monthly operating rept for Apr 1989 for DC Cook Nuclear Plant Unit 1.W/890504 ltr.

DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR r ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specks I "(

t' l (t f It l t4-NOTES RECXPIENT COPXES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 4 4 PD3-1 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP ' RPB 10 1 1 NUDOCS-ABSTRACT 1 1 1'

E ~03) 1 1 RGN3 1 EXTERNAL EG &G S IMPSON 1 F 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOZE K) ALL RIDS" RECXPIEHIS:

PIZASE HELP US TO REDUCE MAEVE!,t QMCLCT 'ISE DOCGMERZ CDÃGK)L DESK, RXN P1-37 (EXT. 20079) KO EKZMHRXB YMR MNE HKH DZSI%GBOTXGN LISTS KlR DOCUMENIS KRJ DON'T NEZDf TOTAL NUMBER OF COPIES REQUXRED: LTTR 20 ENCL 20

J I' > s>> '.a" > f fpfN I

.Jig~~: >g>> J'~ 3 Pp)g yt f47' tg'.

~ A 4

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 616 465 5901 I'.S.

Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 May 4, 1989 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9. 1.10, the attached Monthly Operating Report for the month of April 1989 is submitted.

Sincerely, PJ /-

Plant Manager WGS/jd CC: B. A. Svensson NRC Region III D. R. Hahn EPRI Nuclear Safety Analysis Center R. C. Callen S. L. Hall.

INPO Records Center ANI Nuclear Engineering Department D. H. Wi'lliams, Jr.

M. P. Alexich J. F. Kurgan J. J. Markowsky D. A. Timberlake D. W. Paul T. 0. Argenta S. H. Steinhart B. L. Jorgensen J. R. Sampson D. S. Climer E. A. Smarrel'la Dolly Krieger T. R. Stephens

$ 906i20244 $ 90430 PDR ADOCK 050003i5 R PDC

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 1-MAY-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period APR 89',notes
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1030 'i
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1020
8. If Changes Occur in Capacity Ratings (Items no. 3 thxough 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 719.0 2879 ' 125615.0
12. No. of Hrs. Reactor Was Critical 0.0 1809.6 92081.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 1804.5 90423.4
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 0 4133062 261339477
17. Gross Elect. Enexgy Gen. (MWH) 0 1300260 85218460 18.. Net'Elect. Energy Gen. (MWH) 0 1236191 81934980
19. Unit Service Factor 0.0 62.7 73.2
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net) 0.0 0.0 0.0 62.7
42. 1'5.0 41.7.

73.2 63.0

23. Unit Forced Outage Rate 0.0 1.4 7.9
24. Shutdowns'cheduled over Next Six Months (Type, Date,and Duration):
25. IfEstimated Shut Down At End of date for return Report Period, Estimated Date of Startup:

to s

26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

0 II i ~

~~

~

t AVERAGE DAILY POWER LEVEL t

(MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 1-May-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 MONTH APR 89 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 17 0 2 18 0 3 19 0 4 20 0 5 21 0 6 22 0 7 23 0 8 24 0 9 25 0 10 26 0 11 27 0 12 28 0 13 29 0 14 30 0 15 16

~ s UNIT'Sill)TI)lllVHSANllFANE'Elllll'TlONS e JLEII I.kcssrec l asssc 4 Cslsseellve I4s. Ible vg jj Event Aethas tss Repssl 4 Prevent lteensrcnee 279 890318 S 719.0 P&C 1 N/A .ZZ ZZZZZZ The unit was removed from service (cort t) on 890318 for cycle XI refueling maintenance outage. The unit is in Mode 6 with the core off loaded.

I

  • 4 I': I'osscd Melhsssl: Eahibtt Ci ~ hsstssset4sns S: Seheslsdesl A Fqsstpnsenl I'athne {Eaplalssl I-Mann al fist Preparatlssss of Ilasa II Malntcnanesl sir 1esl 2.Massssal Sef assr. Entry Sheets fsss 0 ensee Event Repel ll.l:R}I sfe I'tlOI'eason: C.Ref<<lh q I) Reyslatssry Restrklhsn I'.Operator 'Iralnlntt 8s Ocense I xassstnat4sss 3 Asstssssltle Swans.

4<Ither {Eaplalssl Olbl I IHItRI:4.

I'stnstnfsl sat Ive ll ttpesatlssna1 Esslst II:xplahsl Xxlssblt I - Sante Source II ()liver II!aplalssl L

DOCKET NO: 50-315 UNIT NAME: D. C. Cook Unit 1 COMPLETED BY: T. R. Stephens TELEPHONE: (616) 465-5901 DATE: May 4, 1989 PAGE: 1of1 MONTHLY OPERATING ACTIVITIES - APRIL 1989 HIGHLIGHTS:

The unit entered the reporting period with the reactor coolant system in Mode 6 and preparations underway to off-load the core. On 4-9-89 the fuel had been removed from the reactor vessel and placed in the spent fuel pit in preparation for maintenance on the reactor coolant pumps and other maintenance requiring reduced inventory in the RCS. The reporting period ended with preparations underway to refill the RCS and reload the core.

DETAILS 4-1-89 1041 Received load shed on Train 'B'afeguards bus.

1308 Made 4 hour report to NRC on loss of power to Train B safeguards.

4-4-89 1830 Lifted head and set on stand.

1901 Started flooding of reactor cavity.

1915 Cavity flooded up.

4-6-89 0237 Started lowering level in refueling cavity in preparation to lift upper internals.

1034 Upper internals are lifted and placed on storage rack.

4-9-89 0943 Core off loaded.

4-10-89 1742 Tripped CD D/G due to overspeed condition - frequency meter pegged high.

4-20-89 1445 Started draining reactor cavity to RWST.

1600 Upper internals set back in place.

4-21-89 0925 Reactor head set back in place. No studs installed.

1057 Began draining the RCS.

2235 The RCS at half loop level.

I 4

It

DOCKET NO. 50-315 UNIT NAME D. C. Cook - Unit No. 1 DATE Ma 4, 1989 COMPLETED BY . R. Ste hens TELEPHONE 616 465-5901 PAGE 1o 1 MAJOR SAFETY-RELATED MAINTENANCE APRIL 1989 1-18C-I Replaced the signal cable for the electronic overspeed device on the 1-CD diesel generator as a result of the 1-CD diesel generator overspeed.

~ 0 0

~