. ])1.
BUTION
DEMONSTR ATION
SYSTEM
REGULAT
INFORMATION DISTRIBUTION
ISTEM (RIDE)
ACCESSION NBR:8812200108
DOC.DATE: 88/12/09
NOTARIZED:
NO
DOCKET
FACIL:50-316 Donald C.
Cook Nuclear
Power Plant, Unit 2, Indiana
a
05000316
AUTH.NAME
.
AUTHOR AFFILIATION
HARRISON,J.J.
Region 3, Ofc of the Director
RECIP;NAME
RECIPIENT AFFILIATION
ALEXICH,M.P.
Co. (formerly Indiana
6 Michigan Ele
SUBJECT:
Forwards
Safety Insp Rept 50-316/88-26
on 880907-1129
a
safety evaluation.No violations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
I ENCL Q
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
R
I
RECIPIENT
ID CODE/NAME
PD3-1
INTERNAL: AEOD
NRR SHANKMANFS
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RGN3
FILE
01
TERNAL: LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
STANGFJ
DEDRO
NRR/DLPQ/PEB
11
NRR/DOEA DIR ll
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
0
EBS
N J
REG FILE
,
02
NRC
RESL MARTIN,D
COPIES
LTTR ENCL
1
1
1
'
1
1
1
1
2
-
2
1
1
1
1
1
1
1
1
1
1
h
R
I
NOZE ZQ ALL "RIDS" RECIPZEPIS:
PLEASE HELP US T0 REDUCE HASTE!
CONI'ACT 'IHE DOCUMENZ CXNHKL DESK
RXN Pl-37
(EXT. 20079) K) ELDGNREE YOUR NAME FBCH DISTRIBUTION
LISTS KK DOCUMEMIG YOU DON'T
NEED.'OTAL
NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL'2
Docket No. 50-316
c} }988
Company
ATTN:
Mr. Milton P. Alexich
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the special
safety inspection
conducted
by Mr. J.
Jacobson
and
-others of this office and
NRC Headquarters
on September
7 through
November 29,
1988, of activities at the
D.
C.
Cook Nuclear Plant, Unit 2, authorized
by
NRC Operating License
No.
DPR-74 and to the discussion of our findings with
Mr. J. White at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
No violations of NRC requirements
were identified during the course of this
inspection.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
8812200108
8500031b
8120~
Avoca 0
G
Enclosures:
l.
Inspection
Report
No. 50-316/88026(DRS)
2.
NRR memo dtd 11/9/88
3.
SER, "Evaluation of the Cracking
of the
Nozzle
to Reactor
Coolant Piping Welds"
See At.ached Distribution
J. J. Harrison, Chief
Engineering
Branch
II
RII
~a obson/jk
West'be'rg
12/08/88
12/~ /88
y,<
RIII
CiP-'iu
Burgess
12/g /88
12/g /88
RIII
Danielson
12/I /88
~II/
Harrison
12/+ /88,.
Company
Distribution
cc w/enclosures:
W.'. Smith, Jr., Plant Manager
DCD/DCB (RIDS)
Licensing
Fee
Management
Branch.
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Nichigan Department of
Public Health