ML17325A918
| ML17325A918 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1988 |
| From: | Gausden M, Will Smith INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8809010184 | |
| Download: ML17325A918 (7) | |
Text
ACCEIZRATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DXSTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:8809010184 DOC.DATE: 8~~
NOTARIZED: NO DOCKET N FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 05000316
).
AUTH.NAME AUTHOR AFFILIATION r, Pr GAUSDEN,M.
Xndiana Michigan Power Co.
(formerly Indiana
& Michigan Ele,>
SMITH,W.G.
(formerly Indiana
& Michigan Ele>>,.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jul 1988 for Donald C Cook Unit 2.
8080 tr.
DXSTRIBUTION CODE:
XE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
R I
S RECIPIENT
'D CODE/NAME PD3-1 LA STANG,J COPIES LTTR ENCL 1
0 1
0
'RECIPIENT)
COPIES' ID CODE/NAME LTTR ENCL PD3-1 PD 5
5 INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN3 1
1 AEOD/DSP/TPAB 2
2 NRR/DLPQ/PEB ll 1
1
~~E2/RPB 10 1
1
~G FILE 01 1
1 1
1 1
1 1
1 1
1 Ig g>>,
EXTERNAL EG&G WILLIAMSi S NRC PDR 1
1 1
1 LPDR NSIC 1
1 1
1 hl R,
(I I
D
>>)
S
'A D
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 M. Gausden (616) 465-5901 August 5, 1988 1of1 HIGHLIGHTS MONTHLY OPERATING ACTIVITIES - JULY 1988 The Unit remained in Mode 6 with the reactor core unloaded.
The containment was turned over to the Steam Generator Repair Project on June 26, 1988.
Removal of the old steam generators is essentially complete.
Gt'oss electrical generation for the month of July was 0 MWH.
SUMMARY
There were no significant operating events during the month besides the on going steam generator repair project, SS090101S4 SS0731 PDR ADOCK 05000316 R
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.DDook-Unit No.
2 Au ust 5
1988 M. Gausden 616 465-5901 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE JULY 1988 VCR-205 containment upper compartment purge supply air train B
containment isolation valve, inoperable due to excessive stroke time.
An ASCO solenoid valve was found to be defective.
The defective solenoid valve was replaced and valve VCR-205 tested within the ISI closing time limits.
N.R.C.
OPERATING DATA REPORT DOCKET NO ~
50-316 DATE 8/1/88 COMPLETED BYH. B.
GILES TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period JULY 1988
',notes
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1100 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14 'ours Generator on Line 15'nit Reserve Shutdown Hours
- 16. Gross Therm. Energy Gen.
(MWH) 17.
Gross Elect.. Energy Gen.
(MWH)
- 18. Net Elect. Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net) 23'nit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six This Mo.
Yr. to Date 744.0 5111.0 0.0 2715.5 0.0 0.0 0.0 2715.'1 0.0 0.0 0
7410980 0
2419600 0
2323265 0.0 53.1 0.0 53.1 0.0 42.9 0.0 41.3 ERR 0.0 Months (Type, Date,and Cumm.
92759.0 63595.1 0.0 82210.0 0.0 189566377 61896220 59584665 68.9 68.9
- 62. 2 60.7 14.5 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Februar 1989
- 26. Units in Test Status (Prior to Commercial Operation)-
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
llNITSIIIITII(IWNSANDtIIIYEIIREI)lll110NS IIEPORTuPanl
~UL~
IOIXETNO 50-316 IjNITNAIIE IIATE 8-3-88 TELEIIIONE 616 Ihlc ri n ss>>
I.lccuscc Evclll Relent 4 C elise EE Cntleclivc hesitant tu Plcvcnl ItccllttenLc 189 cont'80423 S
720.0 BIm C N/g ZZ ZZZZZZ The unit was removed from service on 880423 for cycle 6-7 Refueling and the steam generator repair project.
The reactor core is currently unloaded; The expected date for return to service is February 1989.
I". I ntced S: Seltedtded I'>IVIII Rearms:
h IiquIptncnt Eailutc(Explain)
II Ilabitcuance ni Tesl C-Rcfnclfua I)Reydatnty Rest tktbut I'.Qwtatiu Ttalnlnttk Uceusc I:xattlnal4tu I'.Adntbthttatlvc (I Iiletathntal Ettnt IExplaiul IIlttbct IExpbinl Metbnd:
I Manual 2 ManlQI Sctalu.
3 huh>>uallc S:rant.
- 44) tltet IExpbini l.xldbll Ci btstttLliixts lnt ptepatatiuu iaaf I4ta I!atty Sheets lut Ilecttscc Eve@i kepwt II.IRI I'il>>IHI)kl!G.
OI6I I 5
1:xbtbll I - Sattte Souic<<
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-316 UNIT TWO DATE 8/1/88 COMPLETED BY H.B. GILES TELEPHONE 616-465-5901 DAY 1
2 3
5 6
7 8
9 10 11 12 13 14 15 16 MONTH AVERAGE DAlLY POWER LEVEL JULY 1988 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVEMGE DAILY POWER LEVEL
<:,Indiana Michigan Power Company Cook Nuclear Plant P.O. Box 458 Bridgman, Ml 49106 616 465 5901 INOIAIM NICHIGAItI POWER U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 August 5, 1988 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1988 is submitted.
Sincerely, W.
G. Smith, Jr.
Plant Manager WGS/jd cc:
D. H. Williams, Jr.
M. P. Alexich R.
W. Jurgensen R.
C. Callen C. A. Erikson D.
W. Paul D. R.
Hahn J. J.
Markowsky J.
R.
Sampson PNSRC File INPO Records Center ANI Nuclear Engineering Department T.
R. Stephens NRC Region III B. L. Jorgensen S. L. Hall D. A. Timberlake EPRI--Nuclear Safety Analysis Center