ML17325A722

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1987
ML17325A722
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1987
From: Michaelson
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17325A636 List:
References
NUDOCS 8803040158
Download: ML17325A722 (4)


Text

o

~ ~

Revised 2-8-88 N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 1/6/88 COMPLETED BY Michaelson TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period DEC87

,'notes 3.

Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133 5.

Design Electrical Rating (Net MWe) 1100 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9

~

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

744.0 8760.0 87648.0 744.0 6290.38 60879.6+

0.0 0.0 0 '

744.0 6251.6 59494.9 0.0 0.0 0.0 1995088 16464193<

182155397~

651390 5258580%

59476620K'23911 5026564%

572614004 100.0 71.4 69.8 100 '

71.4 69.8 79

~ 1 54.1+

63. 4W 76.2 52.24 61

~ 94 0.0

18. 5
15. 1 Months (Type, Date,and Duration):

in on A ril 23 1988 for an estimated 11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH) 18.

Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six

~~b duration of 225 d~a s.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved eeo304o Pgp

~

2 58,880 OOCg 0~

@~0 i'np

  • - Corrected Values

I r

'E

0

~ ' evised 2-8-88 AVERAGE DAILY POWER IEVEI (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 1/6/88 COMPLETED BY Michaelson TEI EPHONE 616-465-5901 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 859 857 857 860 857 859 860 860 863 860 862 857 866 856 861 860 DEC87 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER IEVEL 861 861 860 860 862 811

'275 829 863 4 859 +

860 862 860 860 861 Corrected Values