ML17325A473

From kanterella
Jump to navigation Jump to search
Advises That 870929 Rev 6 to Emergency Plan Consistent W/Provisions of 10CFR50.54(q) & Acceptable
ML17325A473
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/24/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 8712010111
Download: ML17325A473 (4)


Text

A(ACES'ON NBR FAC IL: 50-3i 5 50-3i6 AUTH. NAME SHAFERi W. D.

RECIP. NAME DOLANIJ. E.

REGULAT INFORMATION DISTRIBUTIO STEM (RIDS) 87i20iQiii DOC. DATE: 87/ii/24 NOTARIZED:

NO DOCKET Donald C.

Cook Nuclear Poeer Planti Unit iI Indiana 5

050003iS Donald C.

Cook Nuclear Poeer Planti Unit 2I Indiana 5

05000316;.

AUTHOR AFFILIATION Region 3I Ofc of the Director RECIPIENT AFFILIATION Indiana Mi'chigan Poujer Co.

(formerly Indiana h Michigan Ele

SUBJECT:

Advices that 870929 Rev 6 to emergency plan consistent e/provisions of iOCFR50. 54(q)

Kz acceptable.

DISTRIBUTION CDDE:

IE3BD COPIES RECEIVED: LTR

~

ENCL Q SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: ARM/DAF/LFMB NRR/PMAS/ILRB RGN3 F ILE 0 i EXTERNAL: LPDR.

NSI C COPIES LTTR ENCL RECIPIENT ID CODE/NAME WIGGINGTONI D NlgJ=DR EP B REC FIL 02 CA2/DRSS/EPRPB NRC PDR COPIES LTTR ENCL i

i i

a TOTAL NUMBER OF COPIES REQUIRED:

LTTR ii ENCL 4Q

NOV 2 4 )ggy Docket No. 50-315 Docket No. 50-316 Indiana Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza

Columbus, OH 43216 Gentlemen:

This is to acknowledge receipt of Revision 6 to the Donald C.

Cook Emergency Plan dated September 29, 1987.

This revision was received in our office on October 8, 1987.

We have reviewed the changes to the Donald C.

Cook Emergency Plan and determined that they are consistent with the requirements of 10 CFR 50.54(q) and do not decrease the effectiveness of the emergency plan.

These changes are, therefore, acceptable.

Please be reminded that 10 CFR 50.54(q) requires NRC approval of any. changes to your emergency plans which may decrease their effectiveness.

However, if your safety review assures no decrease in emergency preparedness effectiveness, then such changes may be made w'ithout prior NRC approval.

In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter wil,l be placed in the NRC's Public Document Room.

Should you have any questions regarding this letter, please contact Mr. James E. Foster of my staff at (312) 790-5655.

Sincerely, 87i20ioiii 87ii24

,PDR ADOCK 050003i5 F

PDR

>priggnal signel bZ W.D. Shafer" W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch See Attached Distribution

~

R RIII RII Foster/m j nell ur ess e

/g0 ~~

~+~~

lll

Indiana Michigan Power Company NOV 24 )987, Distribution cc:

W.

G. Smith, Jr., Plant Manager DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Michigan Department of Public Health D. Matthews,

NRR, EPB W. Weaver, FEMA Region V

R. LaFreniere, RIII

'9 t