REGVLATO
'FORMATIQN DISTRIBUTION TEM (RIDS)
'C
- CCESS ION NBR: 8710270247 DOC. DATE 87/10/21 NOTARIZED:
NO 'OCKET 0 FACIL: 50-315 Donald C.
Cook Nuclear Power Plant'nit ii Indiana 5
05000315 50-316 Donald C.
Cook Nuclear Power Plant'nit 2i Indiana 8c 05000316 AUTH. NAME AUTHOR AFFILIATION ALEX ICHOR M. P.
RECIP. NAME RECIPIENT *FFILIATION COOKi D. C.
Document Control Branch (Document Control Desk)
SUBJECT:
Advises that response to Generic Ltr 87-12 re loss of-RHR while RCS partiallg fillediwill be delaged until 871121.
Addi time needed for internal review.
DISTRIBUTION CODE:
A061D COPIES RECEIVED: LTR I ENCL 0 SIZE:
TITLE: OR/Licensing Submittal:
Loss of Residual Heat Removal (RHR) GL-87-12 NOTES:
REC IP IENT ID CODE/NAME PD3-3 LA WIGGINGTONi D INTERNAL: ARM/DAF/LFMB NRR/DEST/ADE NRR/DOE*/TSB OGC/HDS1 RES SPANOi
- EXTERNAL'GhG BRUSKEi 8 NRC PDR COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD3-3 PD NRR LYONS W NRR/DEST/*DS NR
/ILRB ILE 01 RES/DE/EIB LPDR NSIC COPIES LTTR ENCL
. TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL
l l li t
Indiana Michigan Power Company One Summit Square P.O. Box 60 Fort Wayne, IN 46801 219 425 2111 lMEMBNSl MCMGQN PQUFM AEP:NRC:1033A Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 GENERIC LETTER 87-12:
LOSS OF RESIDUAL HEAT REMOVAL (RHR) WHILE THE REACTOR COOLANT SYSTEM (RCS)
IS PARTIALLY FILLED.
U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley October 21, 1987
Dear Dr. Murley:
CA hD Q
ch Cfl
,Ld OO Pursuant to discussions. with Mr. D. L. Wigginton of your staff, please be advised that our response to Generic Letter 87-12, "Loss of Residual Heat Removal (RHR) while the Reactor Coolant System (RCS) Is Partially Filled" will be delayed until November 21, 1987.
In preparing our response we found it to be more complex than originally anticipated, and this additional time is needed for internal review.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M.
. Ale ich Vice President cm cc:
John E
~ Dolan WE G. Smith, Jr.
- Bridgman R.
C. Callen G.
Bruchmann G. Charnoff NRC Resident Inspector
- Bridgman A. B. Davis
- Region III
,,EI7>0270247 87i022
PDR 'DQC< p50003i5 P
PDR g (og(
(/o
.0 0
Jj lt p
t II
'J gmp
Distribution:
c tl" s
PDIII-3 PKreutzer IX<igginton October 16, 1987 DOCKET NO(S),. 50-315/316 Ih. John Doke, Vice President Indiana and 1b.chigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza Columbus, OI6o 43216
SUBJECT:
DWARF C. CXK NUCIZAR PLItNIS The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of'pplication, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 ity Oper ating License, dated X Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No
)i)i)i d
C id ),d d~))
)
)))
Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Faci 1 ity Operating License No.
, Amendment No.
dated Order Extending Construction Completion Date, dated Non thly Opera tin g Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated
Enclosures:
As stated Office of Nuclear Reactor Regulation cc:
See next page OFFICE)
SURNAME)
DATEP PPJ,I -g..
P 10..(187 NRC FORM 318 IIOISOI NRCM 0240 OFFIClAL RECORD COPY
4
Mr. John Dolan Indiana and Michigan Electric Company Donald C.
Cook Nuclear Plant CC:
Mr. M. P. Alexich Vice President Nuclear Operations American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43215 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall
.Post Office Box 818 Bridgeman, Michigan 49106 W.
G. Smith, Jr., Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mayor, City of Bridgeman Post Office Box 366 Bridgeman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Regional Administrator," Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. J. Feinstein American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216