ML17324B294
| ML17324B294 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/27/1987 |
| From: | Youngblood B Office of Nuclear Reactor Regulation |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17324B295 | List: |
| References | |
| GL-83-28, NUDOCS 8704020138 | |
| Download: ML17324B294 (2) | |
Text
4;
~
<<t Docket Nos.:
50-315 and 50-316 2~
MAR 1S87 Mr. John Dolan, Yice President
, Indiana and Michigan Electric Company c/o American Electric, Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
'ear Mr. Dolan:
By letters dated November 4, -1983, March 30, 1984, April 10, 1985 and December 19, 1985, the Indiana and Michigan Electric Company submitted information on, among other things, Item 2.1 (Part
- 1) of Generic Letter
, 83-28.
This Generic L'etter dated July 8, 1983 listed the required actions by licensees based on the generic implications of the Salem ATWS events.
Item 2. 1 (Part 1) requires a confirmation that all reactor trip system components are identified, classified, and treated as safety-related.
We find the program by IMEC meets the requirements of Item 2.1 (Part
- 1) and is therefore acceptable.
Our Safety Evaluation and our contractors Technical Evaluation are enclosed.
Part 2 of this item is still under review.
Sincerely,
Enclosures:
As stated cc:
See next page B.J.
Youngblood, Director PWR Project Directorate ¹4 Division of PWR Licensing-A QLSTR-IBUT.Ht oc et Loca PDR NRC PDR PWR¹4 Reading BJYoungblood Reading MDuncan DWigginton NThompson EJordan BGrimes JPartlow ACRS(10)
PWRg
/3PWR-A t4u%'307/87 PWR¹4/DPWR-A DWigginton/rad 03 87
)I
'8'7040i013a 8703>>
PDR ADOCN 05000315
, PDR',
1 PWR BJ u
os+/
7 ood
~
~ I f
II H
P PIII \\
C I 'I
~ I