ML17324B198
Jump to navigation
Jump to search
| ML17324B198 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/08/1987 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17324B197 | List: |
| References | |
| NUDOCS 8701090432 | |
| Download: ML17324B198 (2) | |
Text
TABLE 3.3-1 Continued REACTOR TRIP SYSTEH INSTRUHENTATION FUNCTIONAL UNIT 20.
Reactor Coolant Penp Breaker Position Trip A.
Above P>>S B.
Above P-7 and Below P-8 TOTAL tP.
OF CHANNELS 1/breaker 1/breaker HININJH CKANNFLS CHANNELS APPLICABLE TO TRIP OPERABLE HOOES 1/breaker 1/breaker per oper-ating loop ACTION 10 11 21.
Reactor Trip Breakers 1,2 1,13 34 4* 5*
22.
Autanatic Trip Logic 1,
2 3*
4*
5*
1, 14 8701090432 870108 ADOCK QQQQQQig PDR
n 0
- 16. Undervoltage-Reactor Coolant Puxps
- 17. Underfrequency-Reactor Coolant Pusps
- 18. Turbine Trip TOTAL HO 4-1/bus i-1/bus CHAHHELS XKXR~I
. MINIMUM CHANNELS
~
QP@~Bg APPLICABLE
- h. Lov Fluid Oil Pressure B. Turbine Stop Valve Closure
- 19. Sais'nfection Input Croa ESF 1,
2 7I 6I O.
O 1/breaker 1/breaker
- 21. Reactor Trip Breakers
- 22. Autoxatic Trip Logic 2
- 20. Reactor Coolant Puxp Breaker Position Trip A Above P-8 Bo Above P 7 and below P-8 1/breaker 1
10 11 1/breaker 1
'er operat-ing loop J
lt ~o 1, 13, 3A 4* $*
14 3*
4*
5*