ML17324B035

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page 3 to Insp Repts 50-315/86-06 & 50-316/86-06,inadvertently Omitted from Original Rept
ML17324B035
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/27/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17324B036 List:
References
NUDOCS 8609030020
Download: ML17324B035 (2)


See also: IR 05000315/1986006

Text

Docket No.'50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Electric Company

ATTN:

Mr. John

E. Dolan

Vice Chairman

Engineering

and Construction

1 Riverside Plaza

Columbus,

OH

43216

Gentlemen:

SUBJECT:

INSPECTION

REPORTS

NO. 50-315/86006;

NO. 50-316/86006

It has

come to our attention that

a line of text was inadvertently

omitted from Page

3 of Inspection

Reports

No. 50-315/86006

and

No. 50-316/86006.

Please

replace

Page

3 in the original inspection report

~

~

with the revised

page enclosed

with this letter.

Sincerely,

Original signed

by Mark A. Ring for:

Enclosure:

As stated

Charles

1l. Hehl, Chief

Operations

Branch

cc w/enclosure:

W. G. Smith, Jr., Plant Manager

DCS/RSB

(RIDS)

Licensing

Fee

Management

Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Nuclear Facilities

and

Environmental

Monitoring

i 8

pDR

ADOCK 05000315

Section

RIII

~~+ y!P

McCormick-Barger/mab

08/27/86

RIII

Ring

RIII

Hehl.

II