INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 April 24, 1986 AEP:NRC:0986 Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NRC INSPECTION REPORT NOS.
50-315/86004(DRS)
AND 50-316/86004(DRS)
Mr. James G. Keppler U.S. Nuclear Regulatory Commission' Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
This letter is in response to Mr.
W.
G. Guldemond's letter dated March 25, 1986, which forwarded the routine safety inspection conducted by members of your staff.
This inspection was conducted from January 21, 1986 through February 18, 1986 on activities at the D.
C.
Cook Nuclear Plant Units 1 and 2.
The notice of violation attached to Mr. Guldemond's letter identified two violations.
Per your letter, no reply is required for violation no.
1.
The response to violation no.
2 is addressed in the attachment to this letter.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by t'e undersigned.
Very truly your P.
lexich5 fgti~
Vice resident Attachment MPA/rjn cc:
John E. Dolan W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Bruchmann G. Charnoff NRC Resident Ins ector
- Bridgman
(
8605020066 8b0424 PDR ADOCK 050003l5 8
PDR APR 2 8 IQIN WA/
Attachment to AEP:NRC:0986 Page 1
NRC Violation No 2
"Unit 2 Technical Specification 3.3.3.10b requires, with less than the minimum number of radioactive gas ous effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-13.
The ACTION shown in Table 3.3-13 for no OPERABLE Unit auxiliary building ventilation system noble gas activity monitor is ACTION 28, which permits continued effluent releases provided grab samples are taken at least once per eight hours.
'I Contrary to the above, on December 27, 1985 with no OPERABLE Unit 2 auxiliary building ventilation noble gas activity monitor, ACTION 28 was not complied with in that consecutive samples were taken after an interval of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> and 22 minutes rather than at least once per eight hours.
This event appears repetitive of previous occurrences on June 3,
1985 and, on Unit 1, on November 8 and 12, 1984."
Res onse To NRC Violation No 2
Corrective Action Taken and Results Achieved The following c'orrective actions were taken upon discovery of the missed samples:
a)
Upon discovery of the December 27, 1985 extended sampling interval the samples were immediately obtained.
No abnormal activity levels were indicated and no operational activities occurred which could have been expected to cause elevated activity levels.
T A review of the Technical Specification requirements for sampling and the importance of performing these in the time frame defined was conducted with the technicians involved in the Jun'e 3,
- 1985, and December 27,
- 1985, events.
Disciplinary action was taken with these individuals.
b)
During the November 8 and 12, 1984 occurrences, it was determined that
~ the missed surveillances were the result of a communication failure between the departments involved.
Appropriate personnel were reinstructed on the importance of this work at the. time of the incidents.
Corrective Action To Be Taken To Avoid Further Violation To preclude this type of event from recurring, the following actions were taken upon Plant Management's instruction:
1.
A program has been established to keep cognizant personnel aware of inoperable Technical Specification required equipment.
Equipment that falls into this category is reviewed after the Plant's morning "Plan of the Day" meeting.
During this review a status report is given by the
Attachment to AEP:NRC:0986 Page 2
appropriate Department Heads to the Assistant Plant Manager of Maintenance on what actions are underway to ensure the expeditious return of this equipment to operable status, and the compensatory actions being taken until the equipment is returned to operable status.
2.
An independent audit was performed beginning March 10 through March 21, 1986 by Corporate QA on the programmatic controls in place for handling event initiated Technical Specification surveillances.
As a result of this audit, the following interim and long term measures'ave been or are being taken:
a.
A memo was sent to all departments on April 21, 1986 providing guidance for using the event initiated attachments of PMI-4030.
b.
The event initiated portion of PMI-4030 is currently under revision.
This revision will become PMI-4031, and will be strictly used for event initiated surveillances.
Changes include:
1.
Delineation of department responsibilities 2.
Reduction in the number and intricacy of forms associated with reporting and tracking.
3.
Development of a flow chart to aid in utilizing the paperwork to insure compliance.
c.
Upon completion of PMI-4031 and PMI-4030, training will be provided to all departments on these procedures.
d.
Procedure 12 THP 6020.LAB 100 was revised on April 17, 1986 to clearly indicate its interface with PMI-4030.
3.
The acting plant manager has given direction to appropriate plant management on the importance of properly implementing action initiated surveillances.
Date When Full Com liance Will Be Achieved Full compliance was achieved on December 27, 1985, at 0718 hours0.00831 days <br />0.199 hours <br />0.00119 weeks <br />2.73199e-4 months <br /> when the required grab sample was obtained.
PMI-4030 will be revised, and the new procedure, PMI-4031, will be completed by July 1, 1986.
These procedures will be effective August 15, 1986, after training of all appropriate personnel is complete.
In the interim, the memo sent out to all departments on April 21, 1986 reemphasizes the requirements of PMI-4030.
~
~
h