ML17324A588
| ML17324A588 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/06/1986 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17324A589 | List: |
| References | |
| NUDOCS 8602110192 | |
| Download: ML17324A588 (4) | |
See also: IR 05000315/1985036
Text
Oocket No. 50-315/g5~4
Docket No. 50-316
American Electric Power Service
Corporation
and Michigan Electric Company
ATTN: Mr. John
E. Dolan
Vice Chairman
1 Riverside Plaza
Columbus,
OH- 43216
Gentlemen:
This refers to the routine safety inspection
conducted
by B. L. Jorgensen,
J.
K. Heller,
C. L. Wolfsen and
R. L. Hague of this office on November
5
through
December
9,
1985, of'ctivities at the Donald C.
Cook Nuclear Plant,
Units
1 and 2, authorized
by
NRC Operating Licenses
No.
DPR-58 and
No.
and to the discussion
of our findings with W.
G. Smith, Jr.,
and others of
your staff during the course of and at the conclusion of the inspection.
The enclosed
copy of'ur inspection report identifies areas
examined during
~
~
~
~
the inspection.
Within these
areas,
the inspection consisted of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
During this inspection
no violations of NRC requirements
were. identified,
however,
we noted problems in your conduct of testing
and maintenance
which
led to unnecessary
challenges
to reactor safety systems.
We believe these
occurrences
demonstrate
a need to strengthen
the authorization
and coordination
processes
for these activities.
We request that you provide
a written
response
to this letter within 30 days in which -you discuss
your plans for
addressing
this concern.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter, the enclosures,
and your response
to this letter will be placed
in the
NRC Public Document
Room.
The responses
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office oi Management
and Budget
as required
by the Paperwork
Reduction Act of~1980,
PL 96-511.
~
'
I, I~
=
'I 4
4
~
I ~ H~
4
4
V )
II
I
4
'I
~ 44
I
'
'
4
~
"~ 4
I
'I I
IHV
II
p, It,l
4
4
"0
'VV
4
4'V.
I
t
v
4
I
f
V~V
I VI
>>
I
~
'
t4 f
I
I'
4
4
4
V
American Electric Power
Ser vice
Corporation
@if
6 t986
V
Me will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
"0r>gIna> >tgned by C.
K. NoreiiuÃ
Enclosure:
Inspection
Report
No. 50-315/85036(DRP);
No. 50-316/85036(DRP)
cc w/encl osure:
M.
G. Smith, Jr., Plant Manager
DCS/RSB (RIDS)
Licensing
Fee
Management
Branch
Resident Inspector,
RIII
Ronald Callen, Michigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Nuclear Facilities
and
Environmental Monitoring
Section
Charles
E. Norelius, Director
Division of Reactor Projects
RIII
RII
SiFenmann/jp
Heh1
i/z p
RIII
RIII
Chr
otimos
re ius
1
666$ 8
g~'-j
CQl$ 9:cJh
~
.4 g>>~"8
4
r
I>