WASHINGTON, D. C. 20555 JAN 1 5 l986 Docket Nos.:
50-315 and 50-316 Mr. John Dolan, Vice President Indiana and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43716
Dear Mr. Dolan:
Subject:
Indiana and Michigan Electric Company Request for Approval to Use ASME Code Section XI, 1983 Edition with Summer 1983 Addenda for the ISI/IST Program for the Donald C.
Cook Nuclear Plant, Units 1 and 2
By letter dated December 10, 1985, the Indiana and Michigan Electric Company (IMEC) requested approval to use the provisions of ASME Code Section XI, 1983 Edition with Summer 1983 Addenda for the ISI/IST program for the Donald C.
Cook Nuclear Plant.
The use of this edition, and addenda would begin with the second 10 year program consistent with the schedule approved by the Exemption dated November 29, 1984, as transmitted to you by letter dated December 18, 1984.
The conditions of the Exemption are unchanged; the IMEC request is for an inter-pretation of the provisions of 10 CFR 50.55a(g).
The common start date for Units 1 and 2 for the second ten year ISI/IST program is July 1, 1986; According to the requirements, in part, of 10 CFR 50.55a(g)(4)(ii), the ISI/IST programs...
"conducted during successive 120-month inspection intervals shall comply with the requirements of the latest edition and addenda of the Code incorporated by reference in paragraph (b) of this section 12 months prior to the start of the 120-month inspection interval...."
This would mean that, as a minimum, your new program should comply with the 1980 Edition of the Code.
However, while the regulations clearly require that successive programs be updated to approved edition and addenda of the
- Code, a
12 month grace period is also allowed so that the licensees can begin to update their programs sufficiently in advance of submittal without having to make last minute changes should a new edition or addenda be approved by the NRC.
Accordingly, we see no inconsistency with the 10 CFR 50.55a(g) requirements if a licensee elects on its own to forego a portion of the 12 month grace period and to upgrade a 120-month program to later editions and addenda that have been approved by the NRC.
The IMEC request to update the second 10 year program for D.
C.
Cook to the provision of the 1983 Edition with Summer 1983 Addenda of the ASME Code Section XI meets the requirements of the regulations.
We will review ssosaao45>
shoi>>
PDR ADOCN, 05000315 8
', "fp/q) fl 0,
~
'> I. ', g W K f ) ~', I '<,,
(, p J
I 0'
Mr. John Dolan Indiana and Michigan Electric Company Donald C.
Cook Nuclear Plant CC '.
Mr. M. P. Alexich Vice President Nuclear Operations American Electric Power Service Corporation I Riverside Plaza
- Columbus, Ohio 43215 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgman, Michigan 49106 W. G. Smith, Jr., Plant Manager Don'aid C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, DC 20036 Mayor, City of Bridgeman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room I - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 The Honorable John E. Grotberg United States House of Representatives Washington, DC 20515 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 J. Feinstein American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Mr. John Dolan JAN 1 5 1986 your new program against these provisions
- and, having elected to revise your program to these later editions and addenda, you will be required to comply with them in accordance with the Technical Specifications Section 4.0.5.
If there are any further questions on this matter, please bring them to our attention.
Sincerely, B. J.
Youngblood, Director PWR Project Directorate ¹4 Division of PWR Licensing-A cc:
See next page DISTRIBUTION:
NRC PDR Local PDR PRC System PWR¹4 Rdg MDuncan DWigginton OELD ACRS (10)
JPartlow EJordan BGrimes SEE PREY OUS CONCURRENCES b.
PWR¹4/DPWR-A
- DWigginton/mac 01/08/86 PWR¹4/DPWR-A
- MDuncan 01/08/86 OELD
- WShields 01/13/86 PWR¹4/DPWR-A 4BJYoungblood 01/i5 /86
'S h
4
'4 ih h
A' f
JAI gg ),8 DOCKET NO(S).5O 315/316 NR. John Dolan, Vice President Indian and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43215
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT, UNITS 1/2 DIS ON ket File
/o encl.
PAD-3 g w/o encl.
C. Vogan w/encl.
D. Wigginton w/encl.
The following documents concerning our review of the subject facility are transmitted for your information.
C3 Notice of Receipt of Application, dated O Draft/Final Environmental Statment, dated D Notice of Availabilityof Draft/Final Environmental Statement, dated C) Safety Evaluation Report, or Supplement No.
, dated E3 Notice of Hearing"on Application for Construction Permit, dated C3 Notice of Consideration of Issuance of Facility Operating License, dated O Monthly Notice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated D Application and Safety Analysi's Report, Volume C3 Amendment No.
to Application/SAR dated C) Construction Permit No. CPPR-C3 Facility Operating License No.
, Amendment No.
, Amendment No.
dated
, dated O Order Extending Construction Completion Date, dated Other ($pecify) Bi weekly covering per iod December 18, 1985.
Expiration date for hearing requests and coments January 17, 1986.
Enclosures:
As stated
)yision of PHR Licensina-A tfice of Nuclear Reactor Regu ation CC:
OFFICE~
SURNAME~
DATE+
PAD-3 C. Vogan; 1/]$86..........
NRC FORM 318 (1/84) NRCM 0240
p W
C
'I
~
l I ~
,4 I
C 0
'lr p
a 0