NOTICE OF VIOLATION

. American Electric Power Service.Corporation Docket No. 50-315 As a result-of the inspection conducted on July 15 through 18,

1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions,

( 10 CFR Part 2, Appendix C), the following violation was identified:

Technical Specification 6.8. 1, requires that written procedures be established,

approved, implemented and maintained for refueling operations.

Contrary to the above, the licensee failed to ensure that Westinghouse Refueling Procedure FP-AEP-R8 was implemented in that certain required sign offs were not made for completed procedures and sign offs were made for other procedures not yet started.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:

( 1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

Con-sideration may be given to extending your response time for good cause shown.