Insp Repts 50-315/85-14 & 50-316/85-14 on 850423-0520. Violation Noted:Improper Storage of Flammable Liquids & Failure to Document Reactor Coolant Flow During Reactor Coolant Boron Reduction
ML17321A680
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/06/1985
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
50-315-85-14, 50-316-85-14, NUDOCS 8506240659
Download: ML17321A680 (18)


See also: IR 05000315/1985014

Text

U.

S.

NUCLEAR REGULATORY COMMISSION

REGION III

Reports

No. 50-315/85014(DRP);

50-316/85014(DRP)

Docket Nos.

50;315;

50-316

Licenses

No.

DPR-58;

DPR-74

Licensee:

American Electric Power Service Corporation

Indiana

and Michigan Electric Company

Columbus,

OH

43216

Facility Name:

Donald

C.

Cook Nuclear Power Plant, Units 1 and

2

Inspection At:

Donald

C.

Cook Site,

Bridgman,

MI

Inspection

Conducted:

April 23,

1985 through

May 20,

1985

Inspectors:

B.

L. Jorgensen

J.

K. Heller

C.

L. Wolfsen

JC.Ld

Approved By:

G.

C. Wrigh

Chief

Reactor Projects

Section

2A

c/c/Nf~

ate

Ins ection

Summar

Ins ection

on

A ril 23

1985 throu

h Ma

20

1985

Re orts

No. 50-315/85014

DRP

0-31

8 014

DRP

~A:

R

i

dt

p

i

tytd

id ti

p t

licensee

actions

on previous inspection findings; operational

safety; mainte-

nance;

surveillance;

and independent

inspection

areas.

The inspection involved

a total of 259 inspector-hours

by three

NRC inspectors

including 36 inspector-

hours off-shift.

Results:

Of the five areas

inspected,

no violations or deviations

were identi-

~fied

n three areas;

three violations were identified in the remaining two

areas

(improper storage of flammable liquids,

and failure to document reactor

coolant flow during reactor coolant boron reduction - Paragraph

3, failure to

follow battery surveillance

procedure - Paragraph

5).

850M40659 850606

PDR

ADOCK 050003%5

8

PDR

'

os

0

r

DETAILS

Persons

Contacted

"M. G. Smith, Jr., Plant Manager

"B. Svensson,

Assistant Plant Manager

T. Kriesel, Technical Superintendent-Physical

Science

A. Blind, Assistant Plant Manager

K. Baker, Operation's

Superintendent

"J. Stietzel, guality Control Superintendent

T. Beilman, guality Assurance

Superintendent

J. Allard, Maintenance

Superintendent

R. Tella, Maintenance

Engineer

T. Kossack,

Performance

Engineer

M. Tjader,

Maintenance

Foreman

A. Guzicki, Shift Supervisor

L. Boone, Shift Supervisor

L. Smith, Shift Supervisor

"L. Gibson,

Technical

Superintendent-Performance

"K. Murphy, Production Supervisor

The inspector also contacted

a number of licensee

and contract

employees

and informally interviewed operation,

technical

and maintenance

personnel

during this period.

"Denotes personnel

attending exit interview on May 23,

1985.

Licensee Actions on Previousl

Identified Items

(Closed)

Unresolved

Item (316/78-33-01):

The inspectors

were unable to

determine whether

each heat trace

channel for boron injection path

was

being energized at least

each

31 days

as required

by Unit 2 Technical

Specification 4. 5.4. 2. a.

The Unit 1 specification is the

same.

Review

in 1984 indicated that both requirements

are

implemented

by performance

of Procedure

12

OHP 4030 STP.023,

which specifies alternation of energized

channels

on the twelfth day of each month,

and includes appropriate

docu-

mentation

and review/signoff requirements.

(Closed)

Open Inspection

Items (315/80-20-05

and 316/80-16-03):

Policies

and procedures

on equipment return-to-service

needed

enhancement

to assure

appropriate

post-maintenance

testing

and verification of "operability".

This problem was identified in review of an

LER wherein

an

RHR pump was

not tested following maintenance

on an associated

heat exchanger

and .was

found airb'ound about three weeks later during routine surveillance testing.

Plant Manager's

Instructions

PMI-2110 "Clearance

Permit System"

now speci-

fies all Technical Specification

equipment shall

have operability verifi-

cation performed

by the Operation's

Department.

An SRO license holder

determines

restoration

requirements,

and is instructed

by PMI-2110 to

consider

not just the valve's,

breakers

or switches originally tagged,

but

all those

necessary

to "re-establish

the operability of the system or

component".

Restoration

not involving clearance

permits

remains

open

under the item discussed

below.

(Open) -Unresolved Item (315/83-01-06

and 316/83-01-06;

315/83-01" 07 and

316/83-01-07):

The first pair of items involves weakness

in PMI-2290,

"Job Orders", with respect to the determination of how equipment is to be

restored

operable

and

how appropriate quality control functions (i.e.,

"hold points") are to be incorporated

when work is done without written

procedures;

the second pair of it'ems involves

a PMI-2290 weakness

in not

providing criteria and defining responsibility for determinin'g

when

written .procedures

are required.

The subject

PMI remains

unchanged.

Under the licensee's

Regulatory

Performance

Improvement

Program

(RPIP),

a revision is in progress,

but its completion is not anticipated until

September

1, 1985.

The specifics of the identified concerns relating to

PMI-2290 were discussed

with licensee

personnel

involved in the revision

process

(which is already overdue against the licensee's

original

RPIP

schedule)

who felt the concerns

were being addressed

in the revision being

considered.

The items remain

open pending

NRC review of the approved

revised procedure.

(Open) Noncompliance

(315/81-11-06A

and B, and 316/81-14-06A

and B):

Fire

resistance

ratings of certain doors could not be determined.

At the

request of a Region III Specialist the following were verified to be

UL

certified doors:

No.'s

323,

339,

325, 326,

324,

341,

373,

374, 385,

386,

388, 226, 227,

228,

and 229.

This information was provided to the Region

III Specialist with the expectation that this item will be closed in a

subsequent

inspection report.

(Closed)

Unresolved

Item (315/85009-02;

316/85009-01):

The weekly/quar-

terly surveillance

procedure for the 250 volt station batteries

did not

implement

a Technical Specification requirement that the electrolyte level

be maintained

between the minimum and maximum level marks

on the cells.

The current revision to the Surveillance

Procedure

requires

level

be .main-

tained between

these

marks.

From the time the problem was identified

until the appropriate

procedures

were revised,

the requirement to maintain

the electrolyte level between

the marks

was verified on the work orders

implementing these surveillances.

No

violat'ions or deviations

were identified.

0 erational Safet'erification

a 0

The inspector

observed control

room operation including manning,

shift turnover,

approved procedures

and

LCO adherence;

and reviewed

applicable

logs and conducted

discussions

with control

room operators

during the inspection period of April 23, through

May 20,

1985.

Observations

of the control

room monitors, indicators,

and recorders

were

made to verify the operability of emergency

systems,

radiation

monitoring systems,

and nuclear

and reactor protection

systems.

Reviews of surveillance,

equipment condition,

and tagout logs were

conducted.

Proper return to service of selected

components

was veri-

fied.

Tours of the auxiliary building, Unit 1 containment,

and

screenhouse

were

made to observe

accessible

equipment conditions,

including fluid leaks, potential fire hazards,

and control of activi-

ties in progress.

b.

C.

d.

e.

By observation

and direct interview it was verified that the physical

security plan was being implemented in accordance

with the station

security plan.

During a tour of the Unit 1 upper containment

(top and intermediate

catwalks) the inspector

found coating delamination

ranging in size

from approximately

one square

inch to six square feet.

When dis-

cussed with site management

the inspector

was informed that

a program

was planned to recoat selected

areas

in the containment.

The inspec-

tor reviewed the coating repair program and found these

areas

and

many more were identified.

During a tour of the Auxiliary Feedwater

pump

rooms the inspector

found the retracting mechanism for Fire Doors

Nos.

226, 227,

228,

and 229 were loose or some of the screws

securing the retracting

mechanism

were loose.

This was identified to the Fire Protection

Coordinator.

This was also discussed

at the exit interview at which

time plant management

identified a generic review was being performed.

During a tour of the Unit 1 upper containment prior to fuel transfer

the inspector

observed

some foreign material

on the overhead

crane

rails.

This was identified to the accountability inspector stationed

at the access

to the refueling area.

A subsequent

inspection verified

'hat

the material

was

removed.

0

g.

During a tour of the 633 foot level of auxiliary building on May 15,

1985, at approximately

1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />,

the inspector

found three

UL/FM

approved

Flammable Liquid Storage

cabinets

located

near the Unit 1

auxiliary building control panel.

Stored in one cabinet were paint

cans with the lids removed.

Stored in another cabinet were

a couple

of small buckets of solidified paint.

Stored in the third cabinet

was

an uncovered pail (approximately

one gallon in size) with about

one inch of fresh paint.

Plant Manager',s Instruction 2271, "Control

of Combustible Material", at Paragraph

4.6.2 requires that all paint

shall

be stored in containers with tight fitting lids in either

a

UL/FM approved cabinet or the oil storage

room located

on 595 foot

elevation.

In addition, the empty containers will be stored in the

the approved paint storage

location or disposed of immediately.

The

inspector discussed

the violation of PMI-2271 with the Fire Protection

Coordinator

who issued

a Condition Report and took steps to resolve

the problem.

Unit 1 and

2 Technical Specification 6.8.l.f requires

that written procedures

shall

be implemented for the Fire Protection

Program.

Failure to comply with PMI-2271,

as described

above, is a

violation of Technical Specification 6.8.1.f. (Violation 315/85014"Ol;

316/85014-01) .

While observing the licensee fill the Unit 1 refueling cavity on

April 30, 1985, the inspector

asked the operators if the reactor

coolant boron concentration

was being reduced

and if it was,

how the

minimum flow requirement of Technical Specification 4. 1. 1.3 was

verified.

The Reactor

Coolant System boron concentration

was being

1

El

reduced

as evidenced

by earlier boron samples

of 2084 and 2295

ppm

and the last boron

samp'le of the refueling cavity makeup water which

was 2069

ppm.

A verification was

made to assure

the minimum boron

concentration of Technical Specification 3.9. 1 was met and would not

have

been violated.

After discussion with the licensee

the flow

requirement of Technical Specification 4. 1. 1.3 was verified, and

documented

in the Control

Room Logs.

Technical Specification 4. 1. 1.3 requires

the flow rate of the reactor

coolant to the reactor pressure

vessel

shall

be determined to be

greater

than 3000

GPM within one hour prior to the start of and at

least

once per hour during a reduction in Reactor Coolant System

boron

concentration.

Failure to determine

the Reactor Coolant System flow

rate prior to and at least hourly during a b'oron reduction is a viola-

tion of Technical Specification 4.1.1.3.

(Yiolation 315/85014-02)

Unit 2 Control

Room Log (Book No. 37,

Page 88) for April 16, 1985,

at 0138 hours0.0016 days <br />0.0383 hours <br />2.281746e-4 weeks <br />5.2509e-5 months <br />,

documented that the Turbine Driven Auxiliary Feedwater

Pump

(TDAFP) throttle and trip (T/T) was verified closed.

The

TDAFP

T/T valve is normally closed;

however,

Procedure

1-OHP 4030.001.001

"Routine Plant Inspection Outside the Control

Room", requires verifi-

cation that the

TDAFP T/T valve was latched.

The log entries

from

the previous

and subsequent

shifts properly documented that the

TDAFP T/T was latched.

This inconsistency

in the log was discussed

with Operations.

On April 26,

1985, the licensee notified NRC of an apparent

Technical

Specification violation.

D.

C.

Cook Technical Specification 3.3.3. 1

requires radiation monitors

OPERABLE per Tab'1e 3.3-6.

That Table con-

tains

no requirements

applicable in Mode 5,

During Mode 6, however,

two of three specified monitors in each of Train A and Train

B are

required

OPERABLE.

ACTION 22 states

the

ACTION requirements

ofMech-

nical Specification

3. 9. 9 are to be complied with.

Specification

3.9.9,

which is identified as

APPLICABLE only during core alterations

or irradiated fuel movement in containment,

requires

the containment

purge

and exhaust isolation system to be

OPERABLE; if it is not, the

ACTION is to close purge and,exhaust

penetration to atmosphere.

When the licensee

changed

from Mode 5 (radiation monitors not

required - and they were "blocked" ) to Mode

6 at 1827 hours0.0211 days <br />0.508 hours <br />0.00302 weeks <br />6.951735e-4 months <br />

on

April 23,

1985, the radiation monitors were not restored

"OPERABLE".

The purge

system

was in continuous service thereafter with the radia-

tion monitor purge isolation inputs

BLOCKED until April 26,

1985 when

the distinction in APPLICABILITYbetween

Table 3.3-6

(Mode 6) and

Specification 3.9.0

(CORE ALTERATIONS) was noted.

At 2241 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.527005e-4 months <br />

on

April 26, 1985, the radiation monitors were

UNBLOCKED and compliance

to both specifications

restored.

No core alterations

occurred at

any tHe during this period,

and the alarm functions of the monitors

were always available.

Operator

response

to the alarm,

by procedure,

would have

been to isolate purging.

No alarm occurred.

On April 29, 1985,

licensee

management

determined

the above

was

neither reportable

nor noncompliance,

as the Review Committee

had

evaluated this in 1984 as

an acceptable

condition.

At 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br />

on April 29,

1985, the licensee

declared

an "Unusual

Event" per its emergency classification

when

a maintenance

worker

fell inside containment.

The individual was taken to Memorial

Hospital in St.

Joseph,

Michigan, with a

broken arm, broken leg

and possible

back injury.

The worker's anti-contamination clothing was not removed

due to

the suspected

back injury.

A radiation technician

accompanied

the

worker to the hospital in the Cook-site ambulance,

and subsequently

returned potentially contaminated

materials to the

D.

C.

Cook site.

k.

The licensee

declared

an Emergency

Plan "Unusual

Event" at 1021 on

April 27,

1985 when gaseous

hydrazine

was vented from feedwater

piping (in the

No.

1 steam generator

feedwater gallery) which had

been cut open for maintenance.

A precautionary

evacuation

in parts

of the auxiliary building was conducted.

A temporary patch

was

installed

and the area ventilated.

When subsequent

sampling

showed

airborne levels

had been

reduced

below hazardous

levels,

the

"Unusual

Event" was secured at 1125.

A similar event occurred

May

14,

1985 at.1338

when 'the patch

began

leaking after auxiliary

feedwater

was aligned upstream of the cut and Condensate

Storage

Tank (CST) hydrostatic pressure refilled the line back past

a

1'caking check valve, flushing out contaminants.

Containment ventila-

tion was secured

to avoid drawing gases

into the building, and no

containment

evacuation

was necessary,

though access

was restricted in

the feedwater gallery area.

This event

was secured

based

on satis-

factory air sampling results at 1850.

Two violations and

no deviations

were identified.

4.

Monthl

Maintenance

Observation

Station maintenance activities of safety related

systems

and components

listed below were observed

and/or reviewed to ascertain that they were

conducted

in accordance

with approved procedures,

regulatory guides

and industry codes or standards

and in conformance with Technical

Specifications.

The following items were considered

during this review: the limiting

conditions for operation

were met while components

or systems

were

removed from service;

approvals

were obtained prior to initiating the

work; activities were accomplished

using approved procedures.

.The following maintenance activities were:

a.

Observed

JO No.

94221

Remove

and machine

1CD

EDG main bearing

caps

per

RFC 2753 and 12

MHP 5021.001.H.

4

N

JO No.

97417

JO No.

76596

b.

Reviewed

JO No. 82723

Modify piping for cooling water to of] cooler

on

governor valve to TDAFP.

Repair to valve DO-121

18 month

1CD

EDG inspection

using

Procedures

12

MHP 5021.032.001L,

MHP 5021.

032.001M,

12

MHP 5021.032.001B,

MHP, 5021. 032. 001C,

MHP 5021. 032. 001H.

JO No.(s) 97016,

95080,

82734,

82731,

84877,

84876,

84858,

84857,

68200:

JO No. (s) 16793,

82412,

36296:

JO No.(s) 16768,

17732,

33972,

18006,

97758,

34363:

JO No. (s) 41851,

34488,

36300,

36291,

36288,

17900,

27967,

17965:

quarter]y inspection of the Unit 250 Volt

D.

C. Batteries

using 12

MHP 4030 STP.013.

quarter]y inspection of the Unit 2 AB

Battery using

2

MHP 4030 STP.035.

quarter]y inspection of the Unit 1 and

2

"N" Train Batteries

using 12

MHP 4030

STP. 023.

Weekly inspection of the Unit 2 "AB" and

"CD" Batteries

using 12

MHP 4030 STP.013.

No violations or deviations

were identified.

Month]

Surveillance Observation

The inspector

reviewed Technical Specifications

required surveillance

testing

on the systems listed below and verified that testing

was per-

formed in accordance

with adequate

procedures,

that,test instrumentation

was calibrated,

that .limiting conditions for operation

were met, that

removal

and restoration of the affected

components

were accomplished,

that test resu]ts

conformed with Technical Specifications

and procedure

requirements

and were reviewed by personnel

other than the individual

directing the test,

and that deficiencies identified during the testing

were properly .reviewed

and resolVed by appropriate

management

personnel.

"*12 THP 4030

PER.001

"S" Safety Injection

Pump

Fu]1 Flow Test.

""12 THP 4030 STP.211

Unit 1 Ice Condenser

Basket Weighing.

The inspector

reviewed selected

surveillance

and maintenance

pr'ocedures

for the 250 volt station batt'e'ries

to verify that the: Technical Specifi-

cations

are

imp]emented;

requirements/recommendations

of the "Exide" and

"C 8

D" battery vendor manuals

were implemented;

and,

recommendations

of

IEEE Standard

450 were implemented

as applicable.

The procedures

reviewed

were:

a.

12

MHP 4030 STP.013

Maintenance

Surveillance Test Procedure

For

Inspection of 250 Volt, 1CD,

and

2CD,

Batteries.

b.

12

MHP 4030 STP.014

Maintenance

Surveillance Test Procedure for

Plant Batteries

Emergency

Load Discharge

Test.

c.

2 MHP 4030 STP.023

d.

2

MHP 4030 STP.035

e.

2

MHP 4030 STP.036

250 Volt "N" Train Batteries.

quarterly Surveillance Test Procedure

For

Plant

2AB Battery.

Weekly Surveillance Test Procedures

For

Plant

2AB Battery.

The vendor for the

1AB, 1CD,

and

2CD 250 volt batteries

is "Exide", and

the vendor for the

2AB 250 volt and "N" Train batteries

is "C & D".

The

2AB batteries

were originally Exide batteries

but were replaced

in 1984

with C&D batteries.

The

C&D vendor manual specifies that minimum

applicable volts per cell is 2. 13 when the nominal cell specific gravity

is 1.210.

Unit 2 Technical Specification 4.8.2,3.2.b.1

and

2

MHP 4030

STP.035 at Step 7.33. 1 requires that each

connected cell shall

be greater

than 2. 10 volts.

The inspector questions if this value should

be changed

from 2. 10 volts to 2. 13 volts.

The lic'ensee

was requested

to review this

item and verify that the appropriate limit for minimum volt per cell is

specified.

(Open Item 316/85014-02).

Unit j. and 2 Technical Specification 4.8. 2. 3. 2. b.j. (250 volt D.

C. battery

banks)

and 4.8.2.5.2.6.1

("N" Train battery banks) requires verification

every 92 days that the voltage of each

connected cell has not decreased

more than 0.05 volts from the valve observed

during the original accept-

ance'est.

The inspector

reviewed

12

MHP 4030

STP. 013,

. 023,

and

. 025

and found that this requirement is restated

but the original acceptance

test results

are not in the procedure.

The inspector

was able to obtain

a copy of the original acceptance

test results

from a Maintenance

Engineer

but noted that the results did not appear to be controlled such that when

a cell is replaced the

new cell acceptance

c'riteria is available for

review.

The inspector

reviewed Condition Reports

and found that cell 108

for battery

1CD was replaced

on January

25,

1985.

The quarterly inspec-

tion (12

MHP 4030 STP.013)

was performed

on April 13,

1985.

The original

acceptance

test results that the inspector

was given had not been modified

to reflect acceptance

test results for the replacement

to cell 108.

This

item was discussed

with the Maintenance

Superintendent

with a request that

a review be performed to assure that the requirements

of Technical

Speci-

fication 4.8.2.3.2.6. 1 were performed during the quarterly surveillance

test.

(Unresolved

Item 315/85014-03).

The inspector

reviewed

random selections

of completed surveillance proce-

dures

and found three

examples (listed below) of failure to comply with

surveillance

procedures

of safety related

equipment.

These

were discussed

with the Maintenance

Superintendent.

a.

Procedure

12

MHP 4030

STP. 023, performed

on September

17, 1984, for

the Unit 2 "N" Train batteries

requires verification that the

voltage of each connected cell has not decreased

more than 0.05

volts from the values

recorded during the acceptance

test.

Com-

parison of the acceptance

test values obtained

from the Maintenance

Engineer

shows cell

6 had decreased

0. 06 volts from the value

recorded during the acceptance

test.

This is a failure to comply

with 12

MHP 4030 STP.023.

b.

Procedure

12

MHP 4030 STP.013,

performed

on December,

26,

1984, for

the U~it 1 AB batteries,

requires

the specific gravity be corrected

to 77 F. This is accomplished

in Step 7.4 by averaging the tempera-

ture of the selected cell and using this temperature

to determine

the specific gravity temperature

correction.

The data

documented

in

Attachment

2 contains

a math error which resulted in the use of the

wrong average

temperature

and the wrong correction factor.

This is

failure to comply with 12

MHP 4030 STP.013.

C.

Procedure

2

MHP 4030 STP,025,

performed

on April 10, j.985, for the

Unit 2 AB batteries,

requires

the -average cell temperature

be deter-

mined by averaging

the cell temperature

of every 6th cell (19 cell

total).

Table

1 shows the reading for cell 24 was not recorded

resulting in the total temperature for 18 cells being divided by 19

to obtain the cell average.

This is failure to comply with 12

MHP

4030

STP. 025

Unit 1 and

2 Technical Specification 6.8.2.c requires that written pro-

cedures

shall

be implemented covering surveillance

and test activities

of safety related

equipment.

Failure to comply with 12

MHP 4030 STP.013,

. 023,

and 025,

as described

above is a violation of Technical Specifica-

tion 6.8. 1. c.

(Violation 315/84014-04;

316/84014-03).

One violation,

and

no deviations

were identified.

6.

Inde endent Ins ection Areas

a e

In response

to a regional

request

regarding the

use of temporary

door restraints

on Ice Condenser

Lower Inlet Doors, the inspector

found that 24 temporary door restraints (in the form of tape)

were

used in Procedure

12

THP 4030 STP.207

Rev.

9, "Ice Condenser

Lower

Inlet Doors".

The temporary door restraints

were used to ensure that

the lower inlet doors were opened

one at a time, until the initial

door opening torque

was measured for each door.

The procedure

contained

steps to remove the 24 lower inlet door restraints after

the surveillance

was complete

and verification of removal

was

required

on a sign-off sheet.

In reviewing the procedure,

no

inadequacies

were found regarding the use of temporary door

restraints.

k

The inspector did identify minor inconsistencies

while reviewing

STP.207.

During a discussion with a Performance

Engineer, it was

determined that these

inconsistencies

had already

been identified

and changes

made.

b.

The inspector

was asked to review the licensees

action

on selected

safety issued

as defined in the Institute 'of Nuclear Power Operations

(INPO), Significant Operating Experience

Reports

(SOER),

and deter-

mine if the recommendations

of the

SOER were implemented.

The

selected

safety issues

reviewed were:

Steam Binding of Auxiliary

Feedwater

Pumps

(SOER 84-03),

and Mispositioned Control

Rod

(SOER 85-03).

The results of th'e review were sent to-Region III.on April

30,

1985 and

May 14, 1985.

No violations or deviations

were identified.

7.

~0ee

Items

Open Items are matters

which have

been discussed

with the license,

which

will be reviewed further, by the inspector,

and which involve some action

on the part of the

NRC or licensee

or both.

Open, Items disclosed during

this inspection are discussed

in Paragraph

5 above.

8.

Unresolved

Items

Unresolved

Items are matters

about which more information is required in

order to ascertain

whether they are acceptable,

violations, or deviations.

Unresolved

Items are discussed

in Paragraph

5.

9.

Mana ement Meetin

The inspector

met with the licensee

representatives

(denoted in Paragraph

1) at the conclusion of the inspection

on May 23,

1985 and summarized

the

scope

and findings of.'the inspection.

The inspectors

asked

those in attendance

at the meeting whether they con-

sidered

any of the matters

discussed

to contain proprietary information

or other 'information exempt, from disclosure.

No such information was

identified.

10

~