ML17321A599
| ML17321A599 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/07/1985 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| IEB-80-24, NUDOCS 8505100139 | |
| Download: ML17321A599 (2) | |
See also: IR 05000315/1985010
Text
Docket No: 50-315
50-316
MAY 7
'l985
American Electric Power Service
Corporation
and Michigan Electric Company
ATTN:
Mr. John
E.
Dolan
Vice Chairman
Engineering
and Construction
1 Riverside Plaza
Columbus,
43216
Gentlemen:
This is in response
to your letter AEP:NRC:0499A dated
March 25,
1985,
concerning your verbal
commitment to perform a periodic visua1 inspection
of the containment
pape tunnel
sump in regard to IE Bulletin 80-24.
I
. Followup verification of your actions to implement IE Bulletin 80-24 was
performed by the Senior Resident Inspector at the D.C.
Cook plant site and
documented in Inspection
Reports
85010/85010(DRP) for Units 1 and 2,
respectively.
Based
upon verification of the availability and reliability
of installed equipment,
termination of the visual inspections
is considered
acceptable.
This letter confirms, approval to discontinue the referenced
inspections,
notification of which was previously provided to you verbally through the
Senior Resident
Inspector
on May 3, 1985.
Sincerely,
cc:
M.
G. Smith, Jr., Plant Manager
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission.
EIS Coordinator,
USEPA
Region
5 Office
Nuclear Facilities and
Environmental Monitoring
Section
J. J. Harrison, Jr.
(DRS)
RIII
RIII
Suermann/kja
p'r1ght~
05/03/85
~/~F+<
8505100139
850507
ADOCK 050003i5,
G
C.
E. Norelius, Director
Division of Reactor Projects
Sae
dp
V
d
,1