REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:8505060068 DOC ~ DATE:'5/04/29 NOTARIZED:
., NO DOCKE~T' FACIL~50<<345,'onald 6",
Cook: Nuclear>> Powei Pl anti Unit" 1i Indiana 8
05000315 50 316 Donald C
Cooki Nucl ear>>, Power>> Pl anti Uni t 2i Indiana>>
~
05000316'UTH',NAME>
AUTHOR AFFILI'ATION ALEXICHiM,P, Indiana>>
8 Mich:,igan>>
E~l ectric Co.
RECIP,NAME~
RECIPIENT AFFILIATION DENTONiH.Re Office>> of Nuclear Reactor: Regulationi Director.
SUBJECT:
Responds to order" confirming li,censee commitments on emergency response>> capabili-ty per NRC 850612" 1-tr+SPDS'nticipated to be fully operational w/control room operators trained by end>> of Dec 1985.
DISTRIBUTION CODE!
A003D>>.
COPIES RECEIVED!LiTR'NCL<. 'IZE:
T'ITLE;: OR/Licensing Submittal:
Suppl 1 to NUREG 0737(Generic Ltr 82 33)
NOTES!.
OL', 10/25/T4 OL:e 12/23/72>>
- 05000315 05000316 RECIPIENT ID CODE/NAME~
NRR ORB1 BC INTERNAL! ADM/LFMB NRR PAULSONi'H NRR/DHFS/PSRB NRR/DL/ORBS NRR/DSI "/ICSB NR k
EXTERNAL: LPDR NSIC" COPIES LTTR ENCL<
1 1
1
~
5 1
1 1
RECIPIENT-ID CODE'/NAME>>
IE/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR/DS I'/C P B NRR/DS I/METB NRR/DSI/RSB RGN3'RC PDR'OPIES'VTR:
ENCL<
3
'5 1
1 1
,TOTAL NUMBER OF COPIES" REQUIRED!
L'~TTR 35 ENCL
'3
n e
1I II 1 1 E
1 l
t l.
~ 1 I
El
'I tt
\\
INDIANA8 NICHIGAN ELECTRIC CONPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 April 29 g 1985 AEP:NRC:0773K Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
RESPONSE
TO CONFIRMING ORDER ISSUED BY LETTER DATED JUNE 12, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
This letter responds to specific parts of the Order Confirming Licensee Commitments on Emergency
Response
Capability with Attachment issued by.your letter dated June 12, 1984.
In previous correspondence (February 10, 1984) we committed to provide by April 1985, a completion date for the following systems and facilities:
- 1) Safety Parameter Display System (SPDS) to be fully operational and operators trained,
- 2) Technical Support Center (TSC) fully functional,
- 3) Emergency Operations Facility (EOF) fully functional, and 4) Operational Support Center (OSC) fully functional.
Barring any further unforeseen
- delays, we anticipate having the SPDS fully operational, with the control room operators trained, by the end of December 1985.
The TSC and EOF (facilities) are established and have functioned without the SPDS during the past two D. C.
Cook Plant Emergency
Response
Exercises.
Appropriate specific information from the SPDS will
, also be available in these facilities by December 1985.
Please note that D. C. Cook has an Operations Staging Area (OSA) not an Operational Support Center (OSC).
Reference our April 15, 1983 letter AEP:NRC:0773 and the Donald C. Cook Nuclear Plant Emergency Plan, Rev.
1.
The OSA, located in the basement shelter area of the D. C.
Cook Office building, fulfillsthe requirements of the OSC as defined in NUREG-0737 Supplement 1.
The OSA is complete and has also been fully functional during the last two D. C. Cook Plant Emergency
Response
Exercises.
8QQGQbpp6 pgQQQSi5 8 85Q429 PDR ADOGK PDR F
~
~
, 'n I-II<<
~ '<<)
k n'gg e
~ )
I 'f)
I h)n
)p I
nrem,'f hl
'<<r rn'I I' I
')
~n
)
s n
n r)
~ ~
~
g
~ n.
)
I t
h n
) k.
(>>g II ~
~ '
~
n mr>>,
I It Ikt n)'>>
I P )
Pl nr
=
rlr I
p P
A I ~
k l
I I
>>in
~
~
~ fc
Mr. Harold R.
Den AEP:NRC:0773K This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, M. P. Al ich Vice President
~i <~
cm cc:
John E. Dolan W.
G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector Bridgman
j h
il' b
DOCKET NO(S) 50-315/316 April 26, 19S5 iSTRI BUTION:
~Dk i
/
ORB81 Rdg w/o encl CParrish w/encl DWigginton w/encl Nr.. John Dolan, Vice President Indiana and Nichigan Electric, Company c/o American Electric Company I RIversIde P1aza us, OhIo 43215 INDIANA AND NICNIGAN ELECTRIC COMPANY DONALD C.
COOK NUCLEAR PLANT, UNITS 1 AND 2 The following documents concerning.our review of the subject facility are transmitted for your information.
D Notice of Receipt of Application, dated CI Draft/Final Environmental Statment; dated D Notice of Availabilityof Draft/Final Environmental Statement, dated D Safety Evaluation Report, or Supplement No.
, dated CJ" Notice of Hearing on'Application'for Construction Permit, dated D Notice of Consideration of Issuance of Facility Operating License, dated C3 Monthly Notice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated D Application and Safety Analysts Report, Volume C3 Amendment No.
to Application/SA R dated D Construction Permit No. CPPR-C3 Facility Operating License No
, Amendment No.
, Amendment No.
dated
, dated Cl Order Extending Construction Completion Date, dated tg Other (Specify)
Enclosures:
As stated Division of Licensing, ORBil Office of Nuclear Reactor Regulation
'c: w/enclosure OFFICE+
SURNAME+
DATE+
ORBg1:DL NRC FORM 318 (1/84) NRCM 0240