ML17321A542
| ML17321A542 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/08/1985 |
| From: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17321A543 | List: |
| References | |
| EA-84-105, NUDOCS 8504150713 | |
| Download: ML17321A542 (2) | |
Text
'
(
8 RCC(>
P0 O
C Y/
+a t
UNITED'sTATEs; UCLEAR"REGULATORY COMMISSlON>>
WASHINGTON, D. C 20555 ApR-'; Q"6 GiE Docket Nos 50-315/50-316-.
EA'4'-105'mer 1carr, EIectri'~ P'ower ServTce Corpor ation.
Indiana. and; Mi'chigarr ETectric. Company ATTN: Mr. Johrr. E DoTarr Vice. Chai rmarr Engineering, and: Construction=
1'. Riverside: Plaza.-
Columbus,,
OH-.
43Z16:.
Gentlemen:.
Thi's. acknowTedges. receipt. of your letter dated.'ecember Zl.',. 1984-in response-'o:,
the Notice of VioTatiorr and: Proposed; Impositiorr of Civil Penal'ty sent. to:
you w1th our letter dated November,. Z1,, 1984'he Notice-.of'io1atiorr contains vi'O'Tations. identi fi'ed during: a;. special'.
NRC safety inspectiorr conducted: at. your" facility during.'. the period; June.
Z1. through'ugust 30, 1984'.
The-. results: of this: inspectiorr-indicated the; need: for significant. improvement in. your ability to'ecognize and: implement: technical specification requirements Similar inadequacies: of surveiTlance procedures implementing. technical'pecification requirements.
and measures; ensuring-, equipment operability were discussed. in enforcement conferences'ith-you as early as August 4-, 1981.
Our inspection identified. that: problems. still'xisted in these areas..
We. have carefuTTy: consrdered: your response irr which you. admitted'. that the violations: did: occur ar se< forth irr. the Notice;. of Violation and.'roposed Impositiorr of-Civi1 Penalty;.
We have a1so given carefuT consideration to your.
request:, for mitigation of the. proposed. civil penalty and;, for the reasons; given 1Ir the Appendix; attached. to the enclosed: Order;, we" have. concluded; that mitigation of the. penalty ir not: warranted; in. this. case.
A'ccordingly, we. hereby serve: on American. ETectric. Power Service Corporation the encl'osed Order Imposing a
Civi7 Monetary Pena:Tty~ in the. amount of Fifty Thousand Oollars, ($50,000)..
We;-
wiTT review the. effectiveness: of your corrective-actions; during. a subsequent inspectiorr CERTIFIED'AIL RR~RNECEIP RE UESTEE 8504150?13 850408 PDR ADOCK 05000315 8
American. Electric. Power. Service; Corporation Indiana: and Michigan-Electric:
Company In accordance with Section 2..790 of the NRC's "Ruler. of'ractice,"'art 2;,
Title 10,. Code of. Federal Regulations, a copy of this letter and the enclosure.*
will be: pl'aced. in the: NRC.'s; Public. Document, Room.
Sincerely,.
ayl irecto fice. of In ection and Enforcement
Enclosure:
Order Imposing CiviT Monetary Penalty with Appendix;,
Evaluation and Conclusions cc w/encl:,
W.. G., Smith, Jr, Plant Manager DMB/Document'ontrol Desk (RIDS.)
Resident Inspector, RII'I Ronald. Callen,, Michigan Public Service Commission EIS Coordinator; USEPA.
Region 5 Office Nucl ear Facil ities. and'.
Environmental Monitoring Section