Letter Sequence Supplement |
---|
EPID:L-2017-LLR-0099, Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency (Open) |
|
|
|
---|
Category:Letter type:ONS
MONTHYEARONS-2018-025, 2017 Annual Radiological Environmental Operating Report (AREOR)2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report (AREOR) ONS-2018-024, 2017 Annual Radioactive Effluent Release Report (ARERR)2018-04-30030 April 2018 2017 Annual Radioactive Effluent Release Report (ARERR) ONS-2018-032, Ufsar/Selected Licensee Commitment Changes2018-04-17017 April 2018 Ufsar/Selected Licensee Commitment Changes ONS-2018-029, Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 32018-04-0404 April 2018 Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 3 ONS-2018-027, Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-0022018-03-28028 March 2018 Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-002 ONS-2018-023, Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency2018-03-20020 March 2018 Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency ONS-2018-017, Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan2018-03-15015 March 2018 Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan ONS-2018-021, ISFSI - Submittal of 2017 Annual Effluent Release Report2018-03-0101 March 2018 ISFSI - Submittal of 2017 Annual Effluent Release Report ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-02-26026 February 2018 Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2018-015, Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cabl2018-02-19019 February 2018 Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cables i ONS-2018-014, License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-012018-02-12012 February 2018 License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-01 ONS-2018-019, Submittal of Emergency Plan, Section B2018-02-0505 February 2018 Submittal of Emergency Plan, Section B ONS-2018-011, Ufsar/Selected Licensee Commitment Changes2018-01-25025 January 2018 Ufsar/Selected Licensee Commitment Changes ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2017-12-0404 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ONS-2017-083, Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 02017-11-21021 November 2017 Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 0 ONS-2017-041, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments2017-11-15015 November 2017 Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments ONS-2017-085, Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR)2017-11-15015 November 2017 Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR) ONS-2017-079, Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-11-13013 November 2017 Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-078, Emergency Plan Revision 2017-0042017-11-0909 November 2017 Emergency Plan Revision 2017-004 ONS-2017-074, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-032017-10-20020 October 2017 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-03 ONS-2017-067, Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 22017-10-16016 October 2017 Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 2 ONS-2017-069, (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement2017-10-13013 October 2017 (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement ONS-2017-070, Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0022017-10-0505 October 2017 Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002 ONS-2017-072, Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-10-0303 October 2017 Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-066, Registration for Use of General License Spent Fuel Cask Numbers 147 and 1482017-09-20020 September 2017 Registration for Use of General License Spent Fuel Cask Numbers 147 and 148 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ONS-2017-060, Registration for Use of General License Spent Fuel Cask Numbers 145 and 1462017-08-0303 August 2017 Registration for Use of General License Spent Fuel Cask Numbers 145 and 146 ONS-2017-059, Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary2017-07-31031 July 2017 Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-047, Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 1442017-06-27027 June 2017 Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 144 ONS-2017-042, Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 22017-06-0101 June 2017 Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 2 ONS-2017-040, Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0032017-05-22022 May 2017 Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 ONS-2017-037, 2016 Annual Radiological Environmental Operating Report2017-05-15015 May 2017 2016 Annual Radiological Environmental Operating Report ONS-2017-026, Submittal of Ufsar/Selected Licensee Commitment Change2017-04-11011 April 2017 Submittal of Ufsar/Selected Licensee Commitment Change ONS-2017-024, Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program2017-03-16016 March 2017 Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program ONS-2017-001, Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 0452017-03-0202 March 2017 Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 045 ONS-2017-017, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-001 ONS-2017-018, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-001 ONS-2017-015, End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2017-02-24024 February 2017 End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2017-011, Emergency Plan Revised Evaluation2017-02-0202 February 2017 Emergency Plan Revised Evaluation ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.2017-02-0101 February 2017 Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. ONS-2017-004, Submittal of Core Operating Limits Report2017-01-12012 January 2017 Submittal of Core Operating Limits Report ONS-2017-006, Emergency Plan Revision 2016-0032017-01-12012 January 2017 Emergency Plan Revision 2016-003 ONS-2016-097, Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S)2016-11-17017 November 2016 Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S) ONS-2016-098, Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors2016-11-14014 November 2016 Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors ONS-2016-096, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations2016-11-10010 November 2016 Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations 2018-05-15
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-24-0197, Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition2024-07-31031 July 2024 Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition RA-24-0103, Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval2024-04-19019 April 2024 Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities2023-03-0909 March 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations2022-10-0707 October 2022 Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2022-09-0202 September 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.62022-07-25025 July 2022 Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b2022-07-0808 July 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a2022-06-0808 June 2022 Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a RA-22-0159, Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-12022-05-27027 May 2022 Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1 RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a2022-05-20020 May 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L2022-05-11011 May 2022 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L RA-22-0124, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 42022-04-22022 April 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-32022-04-20020 April 2022 Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3 RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW2022-04-14014 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW RA-22-0111, Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates2022-03-31031 March 2022 Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 42022-03-22022 March 2022 Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4 ML22075A2032022-03-11011 March 2022 Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting ML22074A0022022-03-11011 March 2022 Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP RA-22-0040, Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 32022-02-21021 February 2022 Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3 RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 32022-01-21021 January 2022 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3 RA-22-0025, Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material2022-01-20020 January 2022 Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a ML22019A1182022-01-0707 January 2022 Enclosures 1,2 & 3: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E, Environmental Report - Index of Duke Energy'S Responses, Responses to NRC Requests for Confirmation of Information and NRC Reque ML22019A1232022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information and Request for Confirmation of Information ML22019A1202022-01-0707 January 2022 Appendix K ML22019A1242022-01-0707 January 2022 Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents ML22019A1192022-01-0707 January 2022 Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist ML22019A1212022-01-0707 January 2022 Appendix 13-B Peer Reviewer Communication Log ML22019A1222022-01-0707 January 2022 Calculation of Permeability by the Falling Head Method RA-22-0002, Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station2022-01-0707 January 2022 Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 RA-21-0269, Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-282021-11-0909 November 2021 Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-28 RA-21-0270, Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-8532021-10-28028 October 2021 Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853 RA-21-0242, Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection2021-08-31031 August 2021 Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection RA-21-0219, Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals2021-08-0505 August 2021 Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information2020-09-17017 September 2020 Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information RA-19-0281, Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093)2019-07-31031 July 2019 Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093) RA-19-0301, Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information2019-07-31031 July 2019 Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information RA-19-0134, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-052019-03-0707 March 2019 Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-05 2024-07-31
[Table view] |
Text
ENCLOSWRE 1 TO THIS LETTER CONTAINS PROPRIETARY l1NFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 H. Todd Grant
(_~ DUKE General Manager, Nuclear Engineering ENERGY Oconee Nuclear Station Duke Energy ON01 VP I 7800 Rochester Hwy Seneca, SC 29672 ONS-2017-079 0 . 864.873.6767 f: 864.873.5791 Todd. Grant@duke-energy.com November 13, 2017 10 CFR 50.55a ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Duke Energy Carolinas, LLC (Duke Energy)
Oconee Nuclear Station, Units 1 and 2.
Docket Numbers 50-269 and 50-270 Renewed License Numbers DPR-38 and DPR-47
Subject:
Supplemental information to support NRC review of Relief Request No. 17-0N-001 ;
Alternative to extend the Code Case N-770, Inspection Item B Examination Frequency
References:
- 1. Duke Energy Letter; "Fifth Ten Year lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to extend the Code Case N-770, Inspection Item B Examination Frequency" dated October 3, 2017.
- 2. NRC Letter; "Oconee Nuclear Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Relief Request No. 17-0N-001 " (Accession No. ML17292A142)
Ladies and Gentlemen, Duke Energy is submitting the attached supplemental information for Relief Request No. 17-0N-001 for Oconee Units 1 and 2. Duke Energy submitted the Relief Request (Reference 1) on October 3, 2017. However, the NRC has determined that an independent flaw analysis by the NRC staff is needed to support their technical evaluation of the Relief Request and accordingly submitted a request for the specific supplemental information needed (Reference 2).
The requested information is being submitted as an enclosure to this letter and includes proprietary information. As such, a Proprietary and Non-Proprietary version of the enclosure is provided, along with AREVA's supporting affidavit for withholding the proprietary information in accordance to 10 CFR 2.390, paragraph (a)(4). In light of this , it is requested that the information marked as proprietary be withheld from public disclosure in accordance with 10 CFR 2.390.
Enclosure 1 contains proprietary information .
Upon removal of Enclosure 1, this document is uncontrolled .
ENCLOSURE 1 TO THIS LETTER CONTAINS PROPRIETARY INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 ONS-2017-079 November 13, 2017 Page 2 If there are any questions or further information is needed you may contact David Haile of Oconee Regulatory Affairs at (864) 873-4742.
s~ ,d-H. Todd Grant General Manager, Nuclear Engineering Oconee Nuclear Station
Enclosures:
- 1. Supplemental Information Needed for NRC Review of Relief Request No . 17-0N-001 (Proprietary Version with Affidavit attached)
- 2. Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001 (Non-Proprietary Version)
Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this document is uncontrolled .
ONS-2017-079 November 13, 2017 Page 3 cc:
Ms. Catherine Haney, Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave ., NE, Suite 1200 Atlanta , GA 30303-1257 Ms. Audrey L. Klett, Project Manager (by electronic mail only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-08B1A Rockville, MD 20852-2738 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station
AFFIDAVIT COMMONWEALTH OF VIRGINIA )
) ss.
CITY OF LYNCHBURG )
- 1. My name is Gayle Elliott. I am Deputy Director, Licensing & Regulatory Affairs, for AREVA Inc. (AREVA) and as such I am authorized to execute this Affidavit.
- 2. I am famil iar with the criteria applied by AREVA to determine whether certain AREVA information is proprietary. I am familiar with the policies established by AREVA to ensure the proper application of these criteria.
- 3. I am familiar with the AREVA information contained in an attachment to a letter from Duke Energy Carolinas , LLC (Duke Energy) to Document Control Desk (NRG) , with subject, "Supplemental information to support NRG review of Relief Request No. 17-0N-001 ; Alternative to extend the Code Case N-770, Inspection Item B Examination Frequency," ONS-2017-079, dated November 9, 2017, and referred to herein as "Document. " Information contained in th is Document has been classified by AREVA as proprietary in accordance with the policies established by AREVA for the control and protection of proprietary and confidential information.
- 4. This Document contains information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in this Document as proprietary and confidential.
- 5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document be withheld from public disclosure . The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is
requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financial information ."
- 6. The following criteria are customarily applied by AREVA to determine whether information should be classified as proprietary:
(a) The information reveals details of AREVA's research and development plans and programs or their results.
(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources , to design , produce, or market a similar product or service.
(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA.
(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
(e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.
The information in this Document is considered proprietary for the reasons set forth in paragraphs 6(c) , 6(d) and 6(e) above.
- 7. In accordance with AREVA's policies governing the protection and control of information, proprietary information contained in this Document has been made available, on a limited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information .
- 8. AREVA policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis.
- 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief.
SUBSCRIBED before me this - - - -
day of ~ OY lW'--,,~ , 2017.
Sherry L. McFaden NOTARY PUBLIC, COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES: 10/31/18 Reg.# 7079129 SHERRY L. MCFADEN Notary Public Commonwealth of Virginia 7079129 My Qomml11lon Expires Oct 31, 2018
I Non-Proprietary Enclosure 2 to ONS-2017-079 Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1 and 2 Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001
Non-Proprietary 1 Oconee Nuclear Station, Units 1 and 2 Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001 The 4 requests contained in the NRC's submittal had subparts imbedded in each request. Duke Energy's responses address each subpart of each of the 4 NRC requests.
NRC Request:
- 1. a) The staff requests the licensee to provide detailed drawings of the welds in question. The drawings, or additional supplemental data, should include the pipe outside diameter size, the weld thickness and the weld width as defined by slide 6 of the NRC presentation identified above (ADAMS Accession No. ML17138A002).
Duke Energy Response to 1(a):
~ - 'Sketch 1._ _ _ _ _ _ _ _ _ _ __
Sketch 1 is provided to give perspective of the general configuration of the pipe, nozzle and welds . The supporting data for the response is provided below.
Core Flood Nozzle, Pipe, & DMBW Dimensions: Value 14" Sch140 SS Pipe Wall Thickness : 1.25" Note: DMBW = Dissimilar Metal Butt Weld NRC Request:
b) The drawings, or additional supplemental data , should also include details of any safe end weld , as well as the length from centerline of the dissimilar metal butt weld to the safe end weld .
(__ _____________
Duke Energy Response to 1(b):
Page 1 of 5 ONS 2017 Enclosure 2
Non-Proprietary 1
- Oconee Nuclear Station, Units 1 and 2 Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001 NRC Request:
c) Further, any pipe bends or branch connections should be identified with distances from any and all such items to the centerline of the weld.
Duke Energy Response to 1(c):
There are no pipe bends or branches in the vicinity of the CF Nozzle or Safe End and the closest piping elbow in the Core Flood line has a centerline that is 9'-3" from the DMBW.
NRC Request:
d) The staff also requests the licensee to specify whether these components (i.e., pipe bends, branch connections , and safe end welds) have been evaluated as part of the licensee's weld residual stress profile for the dissimilar metal butt welds .
Duke Energy Response to 1(d):
The safe end and the stainless steel safe end weld adjacent to the DMBW were included in the finite element models.
NRC Request:
- 2. The staff requests the licensee to:
(a) provide the weld residual stress inputs used for the licensee's flaw evaluation ;
Duke Energy Response to 2(a):
Residual stresses for the Circumferential Flaw: Table 1 provides the axial residual stresses and includes a conservative assumption of a 50% Through Wall Weld Repair even though there is no record that any weld repair was performed for the DMBWs.
Residual stresses for the Axial Flaw: Table 2 provides the residual hoop stresses at the DMBW Centerline (Does not include an assumed weld repair).
NRC Request:
(b) include a description of the methodology used to generate the weld residual stresses; Duke Energy Response to 2(b ):
Circumferential Flaw Methodology:
The weld 's fabrication and operating sequence was modeled as follows :
- 1. The low alloy steel nozzle was buttered with lnconel Alloy 82 material.
- 2. Post weld heat treatment (PWHT) of the buttered nozzle was performed.
(Note: creep was not accounted for in the simulation of the PWHT.)
- 3. lnconel Alloy 82/182 filler was used for the nozzle-to-safe end dissimilar metal weld .
- 4. An assumed inner diameter repair of the DMW was imposed as having a repair depth of 50% of the weld thickness over 100% of the circumference (360°).
Followed by:
- 5. A shop hydrostatic test.
- 6. A field weld of the stainless steel safe end-to-pipe weld .
- 7. A field hydrostatic test.
- 8. Three operating cycles to simulate shakedown.
Page 2 of 5 ONS 2017 Enclosure 2
Non-Proprietary Oconee Nuclear Station, Units 1 and 2 Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001 Axial Flaw Methodology:
The weld residual stress analyses utilized thermal analysis to determine the temperature distribution followed by a stress analysis to determine the resulting stresses.
The analytical sequence described below is used in the finite element analysis.
- 1. Deposit nozzle-to-safe end weld (dissimilar metal weld )
- 2. Deposit safe end-to-pipe weld (stainless steel weld) .
- 3. Perform hydrostatic test.
- 4. Impose five cycles of "shake down" with normal operating temperature and pressure to stabilize the residual stress fluctuations and redistribute peak residual stresses .
The mechanical boundary conditions for the stress analyses (thermal and pressure) are symmetric boundary conditions applied to the free end of the vessel/clad material. In addition , the nodes at the free end of the attached pipe are coupled in the axial direction to simulate continuity.
NRC Request:
(c) provide any references used to develop the through-weld th ickness residual stresses, as well as all stress profiles used Duke Energy Response to 2(c):
Inputs used in the Residual Stress and Fracture Mechanics Crack Growth Evaluations Circumferential Flaw:
- 1. Enveloped the ONS Units 1, 2 & 3 external piping moments,
- 2. Used MRP-287 guidance and MRP-115 PWSCC crack growth rates ,
- 3. Temperature: 557 °F, I ----~--
- 5. Used an initial 10% through wall flaw,
- 6. Used residual stresses from a 50% ID through wall repair.(see Table 1)
Axial Flaw:
- 1. Used MRP-115 PWSCC crack growth rates,
- 2. Temperature: 557 °F,
- 3. Used Flaw aspect ratios of 1: 1, 2: 1 & "Variable" ('natural' crack growth due to hoop stress and stress intensities).
- 4. Used an initial 10% through wall flaw,
- 5. Used residual stresses from the no weld repair case . (see Table 2)
NRC Request:
(d) document for each profile if it included effects of pressure, temperature, shakedown and hydro pressure testing, and the value used for pressure, temperature and hydro, including the number of shakedown evolutions evaluated .
Page 3 of 5 ONS 2017 Enclosure 2
1
- Non-Proprietary Oconee Nuclear Station, Units 1 and 2 Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001 Duke Energy Response to 2(d):
Circumferential Flaw Evaluation Inputs: Value Axial Flaw Evaluation Inputs: Value
- Initial 10% Wall Flaw Depth: 0.16875"
- 1: 1 Aspect Ratio, with Handbook Methods: 0.16875" (Initial Flaw Length)
- 2: 1 Aspect Ratio, with Handbook Methods: 0.3375" (Initial Flaw Length)
- 1: 1 Aspect Ratio* see note: 0.16875" (Initial Flaw Length)
- Operating Temperature : 557 Of
- Operating Pressure: 2155 psig
- Hydro Pressure: 3125 psig
- Imposed five operating cycles to simulate shakedown .
- Note: The initial aspect ratio is shown. The residual Hoop Stresses and Stress Intensities (Ks) were used to grow the axial flaw without dictating a single value for the aspect ratio during flaw growth.
NRC Request:
- 3. a) The staff requests the loadings used to perform the licensee's flaw analysis . In terms of forces, the staff requests the licensee to provide forces from deadweight, thermal ,
operational basis earthquake, safe shutdown earthquake , and loss of coolant accident.
Duke Enerqv Response to 3(a :
Axial (Fx) Shear Torsion (Mx) Bending Envelope Piping Loads (Kips) (Kips) (Ft-Kips) (Ft-Kips)
Gravity: 0.50 3.00 1.00 13.00 Thermal Range: 6.00 15.00 65 .00 130.0 OBE: 2.50 3.00 17.00 16.00 SSE: 5.00 6.00 37.00 34.00 No LOCA Loads Calculated:
NRC Request:
b) If stresses are provided , the staff requests the licensee to document the axial membrane stress and global bending stress used for analysis.
Duke Energy Response to 3(b):
Not applicable, Individual loads were provided in 3(a) above.
Page 4 of 5 ONS 2017 Enclosure 2
Non-Proprietary Oconee Nuclear Station, Units 1 and 2 Supplemental Information Needed for NRC Review of Relief Request No. 17-0N-001 Table 1 Table 2 Circumferential Flaw Axial Stress in psi Axial Flaw Residual Hoop Stress in psi Distance from alt(%) Stress (psi)
ID Surface 0.00" 0.00 15458 0.07" 4.17 17164 0.14" 8.33 21782 0.21 " 12.50 29788 0.28" 16.67 37784 0.35" 20.83 39379 0.42" 25.00 40814 0.49" 29.17 44005 0.56" 33.33 42178 0.63" 37 .50 42529 0.70" 41.67 46932
- 0. 77" 45.83 49892 0.84" 50.00 52415 0.91 " 54.17 54745 0.98" 58.33 53819 1.05" 62.50 55975 1.13" 66.67 55997 1.20" 70.83 57276 1.27" 75.00 58454 1.34" 79.17 58467 1.41 " 83.33 62398 1.48" 87.50 63721 1.55" 91.67 62162 1.62" 95.83 64885 1.69" 100.00 65991 Page 5 of 5 ONS 2017 Enclosure 2