Docket Nos.
50-315
,and 50-316 April 18, 1984 11 Mr. John Dolan, Vice President Indiana and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Dolan:
TRIBUTI oc et i
e L PDR ORB¹lRDG Gray File DEisenhut OELD EJordan JNGrace CParrish ACRS (10)
DWigginton TWambach VBenaroya RFerguson GLainas The staff has completed its review of the Indiana and Michigan Electric Company's (IMEC) submittals dated March 8,
- 1984, and March 16,
- 1984, regarding the schedule for completion of fire protection modifications at the D.
C.
Cook facility.
The staff finds that the detailed schedule presented in your March 8 submittal is acceptable, and that adequate compensatory fire protection measures as detailed in your March 16, 1984 letter will be taken to ensure the public health and safety pending completion of this work.
You will therefore be expected to meet this
- schedule, and to notify the NRC immediately if any slippage is expected.
A formal schedular exemption is not enclosed for the following reasons.
By the time of the D.
C.
Cook inspection in April 1982, which gave rise to your later submittals, the deadline for taking advantage of the "tolling provision" of 10 CFR 50.48(c)(6), i.e., within 30 days after the effective date of the fire protection rule, had passed.
Therefore, the schedules in Section 50.48(c) commenced for D.
C.
Cook on the effective date of the rule.
(While the alternative safe shutdown schedule does not commence until NRC approval, Section 50.48(c)(5) required that the design for such a system be submitted within 30 days after the effective date of the rule.)
In cases where the 50.48(c) deadlines have already expired for a facility, we believe a formal schedular exemption is inappropriate.
- However, NRC acceptance of your proposed schedule and interim actions constitutes our recongnition that IMEC is currently working toward meeting the intent of 10 CFR 50.48 and Appendix R.
We would expect that the NRC inspection of your facility to verify compliance with the requirements of 10 CFR 50.48 and Appendix R, would be scheduled for a date after expiration of your approved schedule.
This letter does not preclude any enforcement action the NRC may take regarding your compliance with 10 CFR 50.48 and Appendix R 10 CFR Part 50.
Sincerely,
, 84050200'P8 840418
~,
I.
I
$8XSXS~
PDR ADQCK050003i5
", F
'DR Il 11 1.
11 "I
. ~
gp I
Division of Licensing
~ZF~ f/q CC:
See,next page
- See other white for c u rences ORB¹1: DL*
ORB¹l: DL C-ORB¹l: DL*
CHEB*
CHEB*
D/OIE*,
CParrish DWi gint
- ps SVarga RFerguson VBenaroya DeYoung
'/3 /84 4/(
84 4/3 /84 4/3/84 4/3 /84 4/3/84 AD/MCET*, 'RB¹5*
WShields*
AD:OR:DL*
D:
R WJohnston TWambach OELD GLainas D
4/3 /84.
4/3/84 4/3 /84 4/4 /84 4(p/84
I l
l ih (
'L 4
~
N l'
1 f
4 Docket Nos.
50-315 and 50-316 Mr. John Dolan, Vice President Indiana and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Dolan:
D ISTR IBUTION oce re NRC PDR L PDR ORB¹1RDG Gray File DEisenhut OELD EJordan JNGrac CParr' ACR (10)
DWigg ton TWa ach V
naroya erguson GLainas The staff has completed its review of the Indiana d Michigan Electric Company's (IMEC) submittals dated March 8, 1984, nd March 16,
- 1984, regarding the schedule for completion of fire p otection modifications at the D.
C.
Cook facility.
The staff finds tha the detailed schedule presented in your March 8 submittal is accep
- ble, and that adequate compensatory fire protection measures as d
ailed in your March 16, 1984 letter will be taken to ensure the public ealth and safety pending completion of this work.
You will ther ore be expected to meet this
- schedule, and to notify the
.NRC. immedi ely if any slippage is expected.
l.
A formal schedular exemption is not nclosed for the following reasons.
By the time of the D.
C.
Cook inspect'on in April 1982, which gave rise to your later submittals, the deadl e for taking advantage of the "tolling provision" of 10 CFR 50.48(c)(6
, i.e., within 30 days after the effective date of the fire protection ru e, had passed.
Therefore, the schedules in Section 50.48(c) commenced f D.
C.
Cook on the effective date of the rule.
(While the alternati e safe shutdown schedule does not commence until NRC approval, Secti 50.48(c)(5) required that the design for such a system be submitted wi in 30 days after the effective date of the rule.)
In cases where the 50.4 (c) deadlines have already expired for a facility, we believe a formal s
edular exemption is inappropriate.
- However, NRC acceptance of your p posed schedule and interim 1actions constitutes our
,recognitjon
'..that I C is currently working toward meeting the intent of 10 CFR 50.48 and App dix R.
We would expect that the NRC inspection of your facilty to ver if compliance with the requirements of 10 CFR 50.48 and Appendix R, wo d be scheduled for a date after expiration of your approved schedule.
Sincerely, c
~
Dar rell G. Eisenhut, Director Division of Licensing ee next page OR841: OL CParrish 4/'O /84 A