50-315 and 50-316 April 4, 1984 LICENSEE:
Indiana and Michigan Electric Company FACILITY:
Donald C.
Cook Nuclear Plant, Unit Nos.
1 and 2
SUMMARY
OF MEETING HELD ON MARCH 27 AND 28, 1984 WITH INDIANA AND MICHIGAN ELECTRIC COMPANY TO DISCUSS INSERVICE TESTING OF PUMPS AND VALVES The NRC staff met with the Indiana and Michigan Electric Company (IMEC), the
- licensee, on March 27 and 28, 1984 at the plant site to discuss the inservice testing program for pumps and valves for the Donald C.
Cook Nuclear Plant, Unit Nos.
1 and 2.
Enclosed is a list of attendees.
By letter dated March 15, 1984, the licensee requested that the inspection interval for both Units 1 and 2 be changed so that a
common start date and same ASME Section XI Code edition would apply.
On the current schedule, Unit 1 could be required to follow the 1980 edition of the code beginning in August 1985 and Unit 2 could be required to follow a later edition beginning in July 1988.
There are advantages and disadvantages to having a
common start date but all agreed that the possible safety problems and confusion with two units with different code requirements was sufficient incentive for establishing a
common inspection cycle start date.
The staff will further consider the licensee's proposal with the understanding that the reactor vessel beltline examinations and system hydros are the limiting inspections.
It was made clear that a change in start date affects the code inspection criteria only and that the frequency and systems to be tested are expected to be continued at a
regular pace.
The inservice testing of pumps and valves program was reviewed by EGKG under contract with the NRC.
The results of that review were transmitted to the licensee by letter dated March 5, 1984.
The licensee was well prepared to discuss the deficiencies noted by EG8G and to point out the existing program for testing and additional information to support relief requests.
Based on discussions with the licensee, a supplemental submittal will be made to document the additional information to support the IST review for D.
C. Cook.
This submittal is expected in 45 to 60 days.
Enclosure:
As stated Dave Wigginton, Project Manager Operating Reactors Branch No.
1 Division of Licensing ORBgl:D B
DWi gin on/dn V
4/
/84 4
- DL a
84 S404200064 840404 PDR ADOCK 050003i5 P
I F
t pF A
t H
I' I
il
,F li tV J
Indiana and Michigan Electric Company; Donald C.
Cook Nuclear
- Plant, Units.
1 and 2
cc:
Mr.
M. P. Alexich Vice President Nuclear Engineering American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43215 Mr. William R.
Rustem (2)
Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Mr.
Wade Schuler, Supervisor Lake Township
- Baroda, Michigan 49101 W.
G. Smith, Jr., Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, DC 20036 Honorable Jim Catania, Mayor City of Bridgman, Michigan 49106 U.S.
Environmental Protection Agency Region V Office ATTN:
EIS COORDINATOR 230 South Dearborn Street
- Chicago, IL 60604 Maurice S. Reizen, M.D.
Director Department of Public Health Post Office Box 30035
- Lansing, Michigan 48109 The Honorable Tom Corcoran United States House of Representatives Washington, DC 20515 James G. Keppler Regional Administrator - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road-Glen.Ellyn, IL 60137 J.. Feinstein American Electric Power Service 1 Riverside Plaza
- Columbus, Ohio 43216
ENCLOSURE Name J.
D.
Page P.
L.
Eng J.
A. Kobyra M. Marrocco
- J.
C. Nogrady T. Satzan Sharma H.
H. Bolinger T.
R. Stephens A. A. Blind M.
W.
Kennedy
- R. L. Dudding B. J.
Sweeney
- J. F.
Kurgan F. S. VanPelt, Jr.
P.
A. Barrett
- W. G. Smith, Jr.
- M. P. Alexich
- B. A. Svensson D. L. Wigginton
- C. S.
Swenson
- John J.
Ripak
- J. K. Heller
- Daniel Patience
- F. W.
Wenman ATTENDANCE LIST 9 ~994 Re resentin
- USNRC, DE, R: III AEPSC, Mechanical Engineering AEPSC, Mechanical Engineering AEPSC, Mechanical Engineering AEPSC, Safety/Licensing
- I8M, QC Department I&M, Operations Department I8M, Technical Engineering I8M, Quality Insurance ISN, Maintenance
- AEPSC, QA Engineering AEPSC, Nuclear Operations Support AEPSC, Nuclear Operations Support AEPSC, Nuclear Safety 8 Licensing I8M, Plant Manager
- AEPSC, VP Nuclear Engineering I8M, Asst. Plant Manager
- AEPSC, Heat Exchangers 8
- Pumps, MED
- AEPSC, Heat Exchangers 8
- Pumps, MED NRC, Resident Inspector AEPSC, Mechanical Engineering I&M, Maintenance
- 3/27/84 only
- 3/28/84 only
D ket File NRC Local PDR ORB¹l Reading S.
Varga D. Iligginton OELD E. Jordan J.
N. Grace ACRS (10)
NSIC J.
Page P.
L.
Eng lteetin Summar Distribution