Requests Relief from 10CFR50.55a(g) Provisions to Allow Both Facilities to Begin Second 10-yr Insp Interval on Same Date. Same Start Date Would Allow More Efficient & Uniform Use of Personnel
ML17320A965
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/15/1984
From: Hering R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0730A, AEP:NRC:730A, NUDOCS 8403200202
Download: ML17320A965 (8)


Text

REGULATOR NFORMATION DISTRIBUTION TEN (RIDS)

ACCESSION NBR:8403200202 DOC ~ DATEt 84/03/1'5 NOTARIZED:

NO DOCKET 0'ACIL:50-315 Donald C,

Cook Nuclear Power Planti Unit lr Indiana L

05000315 50-316 Donald C ~

Cook Nuclear Power Planti Unit 2i Indiana 8

05000316 AUTH INANE AUTHOR AFFILIATION HERINGiR. F +

Indiana 8 Michigan Electric Co, RECIP ~ NAME

~

RECIPIENT AFFILIATION OENTONr H.RB Office of Nuclear Reactor Regulatiani Dir'ector

SUBJECT:

Requests rel-ief from 10CFRS0.55a(g) pr ovisions to allow both facilities to begin second 10>>yr insp interval on same date.

Same start date would allow more efficient 8 uniform use of per sonnel.

DI'STRIBUTION CODE:

A047S COPIES RECEIYED:LTR ENCL SIZE; l G:

3 TITLE:

OR Submittal: Inservice Inspection/Testing NOTES:

C RECIPIENT ID CODE/NAME NRR ORB1 BC 01 INTERNALS ELD/HDS3 NRR/OE/MTEB 14 RGN3 COPIES LTTR EN L 7

1 1

1 RECIPIENT ID CODE/NAYiE N

/ME8 15 REG FI E

04 COPIES LTTR ENCL EXTERNAL: ACRS 16 NRC PDR 02 NTIS 10 1

1 1

LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL

W4 Il'i W

"(JP! sf ~ WW((. <<(

'.W;r, r

((

r WII<< f)'<<WW f

>'q l f WWW((

<<(WWI, f

'4~9 "W'<<"If l

qf W'W f 'fi I 4 (i!i$

'll f'Wf

", (T f Wg WI If

'I(

Wlf, (F>>'$ '4.'I f W ~

W f (>>I'3 f

'I4 >at I!! <<

I <<!,',I it

,IAF,,W

~,((

(

((4(I f(WI(ill f4'l il

~

W ~

I~((y w4i e

I!

wi! 41!!'

FJ nl WW f ft'4 c<<WW if ~f (

<<F 'lW (W

'1Q 4 f I <<ltil fi"I'$F,(l ir If,(lfgW 4

'IW<<I('~'

}(

I I ((I )

l 1I(!

I' f

,I'!I,<<q.t <<<<(W(f,'

(

P<<<<f II)f "ff f "WWII

>>W((W"4 W

q f

n e= e<<esoneaw'~em~ ~ +

(,

~,(((

(W~ II';I<</1 g

4 I'( (J" t(I(,t(

PI!I)) $ (IWWIR f ((FWI'I, I

. (

FI,WW! )(

4 I,'I(I,,IW

~II (W f t

tg Fk [

i I,,I W

'l I(

e, W

, h (i(4(

4

  • I

0 INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 March 15, 1984 AEP:NRC:0730A Donald C. Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 INSERVICE XNSPECTION SCHEDULE Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

The American Electric Power Service Corporation and Xndiana s

Michigan Electric Company representatives met with members of the NRC Staff and the Staff's consultant on August 18 and 27, 1982 to discuss the inservice inspection (ISX) and inservice test (IST) programs for the Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2.

Among the topics discussed was the potential for using concurrent start dates for the second ten year inspection interval for both units of the Cook Plant.

At the present time the second inspection interval is scheduled to begin August 23, 1985 for Unit 1 and July 1, 1988 for Unit 2.

Indiana 6 Michigan Electric Company requests relief from the provisions of 10 CFR 50.55a(g) to allow the two units of the Cook Plant to begin the second ten year inspection interval on the same date, and thereby insure use of the same ASME Section XI Code edition.

Indiana 6

Michigan Electric Company believes that the use of a common start date for both units will facilitate the transition to the next ten year inspection interval by allowing more efficient and uniform use of personnel.

The ISI/IST programs based on the same ASME Section XI code edition will also significantly decrease review time by the NRC Staff.

If the two units are not placed on the same date for the start of the next ten year inspection interval, the three year difference presently existing may mean that the units will reference different code editions for the second ten year interval, since a change in the Federal Register may mandate a subsequent, code edition after Unit 1 has been updated.

Having the ISI and XST programs referencing different 8403200202 8403i5

'PDR

'ADOCK. 05000315

'8 PDR o4')

Mr. Harold R.

Den AEP:NRC:0730A code editions will lead to increased problems in administering the programs.

The date requested to simultaneously begin the second ten year interval is July 1, 1987.

Based on present scheduled

outages, this date will permit completion of the remaining ISI examinations with the least disruption of plant activities.

The major items of concern, are the reactor vessel beltline volumetric examinations which have to be completed prior to the end of the first interval.

This will be the first time these difficult and lengthy examinations will be performed at the Donald C. Cook Nuclear Plant.

The July 1, 1987 date willpermit the reactor vessel beltline examinations to be performed during outages presently scheduled to begin in January 1985, for Unit 1, and in March 1987, for Unit 2.

These two examinations will conform to the 1974 edition of the ASME BGPV Code,Section XI which is the code currently in effect.

The ISI/IST program for the second ten year interval for both Units will be submitted to the NRC six months prior to the start of the first ten year inspection of Unit No. 2, approximately in October 1986.

Selecting an earlier date than July 1, 1987 for the start of the second interval, would require that the Unit 2 reactor vessel beltline examination be moved up to the outage presently scheduled to begin September 1985.

This would result in having to perform these two extensive examinations within the same year, which would pose a

substantial hardship on the plant and nondestructive examination personnel.

Upon receiving the requested relief, we plan to submit a combined ISI program covering both units since they are basically of the same design with only minor differences in components.

There should be little effect on the pump and valve testing programs as these are on shorter cycles and will not be affected by a change in the interval "starting date.

Unit 1's valves and pumps would continue to be tested in accordance with the 1974 Code during the extension from

August, 1985 to July'987.

Timely review and approval of this request by the Staff will allow us the time necessary to re-schedule the remaining inspections for the first ten year interval.

We -would appreciate the expeditious handling of this request by your staff.

'I J

Mr. Harold R.

Den AEP: NRC: 073 0A This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, 4 js~

R. F. Hering

$ )~

Vice President RFH/om CC'ohn E. Dolan Columbus M. P. Alexich W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff E.