REGULAtY INFORMATION DISTRIBUTISYSTEM (RIBS)
ACCESSION NBR;8308080<11 DOC ~ DATE: 83/08/02 NOTARIZED:
NO DOCKET ¹ FACIL;50-3i5 Donald C<
Cook Nuclear Power PlantR Unit lr Indiana 8
05000315 "50-316 Donald C ~
Cook Nuclear Power Planti Unit 2~ Indiana 8
050003i6 AUTH,NAME AUTHOR Al FILIATION ALEXICH~M~ P ~
Indiana 8 Michigan Electr ic Co, RECIPiNAME RECIPIENT AFFILIATION DENTONrH ~ RE Office of Nuclear Reactor Regulationr Director SUBJECT; Forwards list of commitment 8 target dates for emergency response activitiesrsupplementing 8 superceding 830415 ltrr per Generic Ltr 82-33rSuppl 1 to NUREG~0737.
Ol'STRIBUTION CODE:
A003S COPIES RECEIVED!LTR ENCL SIZEg TITLE: OR/Licensing Submittal:
Suppl 1 to NUREG"0737(Generic Ltr. 82'33)'"
NOTES:
REC IP IENT ID CODE/NAME NRR ORB1 BC INTERNALG IE/DEPER/EPB NRR/Dl./DRAB NRR/DSI/CPB NRR/DSI/METB NRA/OS I/R8 8 OR85 PAUI SONgN RGN3 EXTERNAL: LPOR NSiC COPIES LTTR ENCL 7
3 3
-1 1
ii 1
1 1
1
.1 1
1 RECIPIENT ID CODE/NAME NRR/DHFS/PSRB NRR/Ol./ORBS NRR/DSI/ICSB NRR/DSI/RAB
~
APSONrN NRC PDR NTIS COPIES LTTR ENCL 1
1 5
5 1
1 1
1 3
-3 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 33 ENCL 33
V
~
3 3 4
4 3 ll 4,3 4
Ir] ~3, I 4
'll $ I
]I
'I I" I '$43 IVV 3433)
I t>>>>
4 1
~
~
4
~
~
'4 fj mI I tc I ll'I ) I 33I)I,
'P
'Pl f Vl l
"I I rI>>l 3 II f'1' 4
4 l4"4
$ f '34
$ >>3 f I I'l 3t
.3
~
44 7
<<1 I
I'I 4
4 II llV 'INC I
IV g
4 I
4 I
~
II I4,~,4
'>>I 4
I I' 4,4 V
34 3
I>>4 I
INDIANA L MICHIGAN ELECTRIC COMPANY P. O.
BOX 18 BOWLING GR E EN STATION NEW YORK, N. Y. 10004 August 2, 1983 AEP: NRC: 773A Donald C.
Cook Nuclear Plant Unit No.
1 and 2
Docket No. 50-315 and 50-316 License No. DPR-58 and DPR-74 Generic Letter No. 82-33 Supplement to NUREG-0737 Requirements for Emergency
Response
Capability Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
This letter supplements and supercedes our letter of April 15,
- 1983, from Mr. R. F. Hering to Mr. H. R. Denton on Requirements for Emergency
Response
Capability (AEP:NRC:773).
The purpose of this letter is to identify target dates and commitment dates for the Safety Parameter Display System, Emergency Operating Facility, Technical Support Center, Detailed Control Room Design Review, Regulatory Guide 1.97 Instrumentation and Emergency Operating Procedures activity identified in that letter.
Since final implementation dates are contingent upon all other NRC required Emergency Response Facility activities, many of those dates can only be considered targets (i.e.
a goal to be achieved, but not necessarily fixed commitments).
Specific commitment dates are therefore limited to status reports on these activities.
We have listed in Attachment 1 the commitments as well as key target dates for each of the activities discussed above.
When we transmit the status reports to you, we will appraise you of any changes to the target dates and the reasons such changes are necessary.
The information contained in this letter has been discussed and agreed to by members of your staff during discussions following receipt of our letter AEP:NRC:773.
83080804ii 830802 PDR ADOCK 050003i5 F
PDR py9 i
YMA"1YiO..
'.llFiT33 l3 I/iABIHDIYl 8 AMAIGNl r
v w
Qi XVE>
~O r l l10i7A'fP, l>9;>kid e~><? 'O'Qd
~'i'QOf
~ Y H,'.~SOY
'A/3'H
Mr. H. R. Denton AEP:NRC:773A This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours,
. P. Ale ich.
ice Pre ident MPA:las Attachment cc:
John E. Dolan R.
W. Jurgensen W. G. Smith, Jr.
Bridgman R.
C. Callen G. Charnoff E. R.
- Swanson, NRC Resident Inspector Bridgman
S v'w ly
ATTACHMENT 1 TO AEP:NRC:773A COMMITMENT'AND TARGET DATES FOR EMERGENCY RESPONSE ACTIVITIES I.
Safet Parameter Dis la S stem Emer enc 0 eratin Facilit and Technical Su ort Center A.
Status Report Commitment:
April 1985 B.
Target:
September 1985 II.
Detailed Control Room Desi n Review A.
Program Plan Report B.
Status Report C.
Final Summary Report Commitment:
.'December,'.1983 Commitment:
September 1984 Target:
December 1985 IIX.
Re ulator Guide '1.97 Post-'Accident Instrumentation A.
Status Report on how we intend to meet Regulatory Guide 1.97 requirements Commitment:
February 1985 B.
Complete implementation phase of Regulatory Guide 1.97 work Target:
November 1985 IV.
Emer enc 0 eratin
'Procedures (u
rade)
A.
Status Report B.
Procedures Package C.
EOP's Complete and Implemented Commitment:
January 1984 Target:
April 1984 Target:
July 1985
4 1
July 28, 1983 DOCKET NO(SI 50-316/316 Mr. John Dolan, Yice President Indiana and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216 DISTRIBUTION:
Docket Files tU Q /pc,(
ORB 81 C. Parrish D. Wigginton
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT (Unit Nos.
1 and 2)
The following documents concerning our review of the subject facilityare transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availabilityof Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
, dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.
to Application/SAR dated Construction Permit No. CPPR-
, Amendment No.
, dated Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated
[Q other (Q ec/f )
Monthly RePor t dated July 1 2, 1 983.
, dated Division of Licensing Office of Nuclear Reactor Regulation
Enclosures:
As stated cc:
See next page OFFICEI SURNAME)
OATE P
.OR8..11...,..
CParrish/
7/28/83
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ I ~ ~ ~
~
~ ~
~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~