Advises That Info Provided in 821115 & 1214 Ltrs Re TMI Items II.F.1.1 & II.F.1.2 on Particulate Monitors Resolved Concerns.Info Acceptable
ML17320A529
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/10/1983
From: Varga S
Office of Nuclear Reactor Regulation
To: Dolan J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
TASK-2.F.1, TASK-TM NUDOCS 8305180838
Download: ML17320A529 (3)


Text

MAy 1019 Docket Nos. 50-315 and 50-316 ter. John Dolan, Vice President Indiana and fhichigan Electric Company Post Office Box 18 Bowling Green Station New York, New York 10004

Dear ter. Dolan:

> ~

DISTRIBUTION, Docket File ~

NRC PDR Local PDR ORB 1 File D. Eisenhut OELD E. Jordan D. Wigginton C. Parrish NSIC J. Taylor ACRS (10)

E.

Conner We have completed our review of the information provided by the Indiana and thichigan Electric Company (IHECo) letters dated November 5, 1982 and December 14, 1982, on the THI Action Items II.F.l,l and II.F.1.2 on partic-ulate monitors.

That information resolved our concerns on deviations and is acceptable.

Our Confirmatory Order on I1arch 14, 1983, listed II.F.1.2 schedule of completion as April 1982, however. in the IHECo letter dated April 29, 1983, the system described as in place to meet the intent of II.F.1.2 is a separate system from the one we reviewed and portions are listed as temporary.

While we may agree that the "separate" system is sufficient to satisfy II.F.1.2 requirements, we believe you should correct the problems with the moisture in sampling lines and establish your original system as the primary system.

The INECo letter dated April 29, 1983, also brought to our attention the error on II.F.1.3 schedule.

Since this item is also not complete and we do not have the current schedules for either II.F.1.2 or II.F.1.3, IHECo is requested to provide this information, along with sufficient details and justification, within two weeks of receipt of this letter.

Sincerely, Original Signed by:

8e A Var"a cc:

See next page 8305i80838 8305l0 PDR ADOCK 05000315 P

PDR Steven A, Varga, Chief Operating Reactors Branch No.

1 Division of Licensing OFFICE I SURNAME$

DATE 5 ORB 1

ORB k4 gg nI JFSgerma'nn 5/Q J'8'3"""""$'g"j""'/01-"

NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQPQ: 198) ~30 960

~

I

~ 4

~

~

Mr. John Dolan Indiana and Michigan Electric Company CC:

Mr. M. P. Alexich Assistant Vice President for Nuclear Engineering American Electric Power Service Corporation 2 Broadway New York, New York 10004 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D.

C.

20036 W. G. Smith Jr., Plant Manager Donald C.

Cook Nuclear Plant P. 0.

Box 458 Bridgman, 'Michigan 49106 U. S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103 The Honorable Tom Corcoran United States House of Representatives Washington, D. C.

20515 James G. Keppler Regional Administrator - Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen El lyn, Illinois 60137