Public Version of Rev 6 to App a of Emergency Plan Procedure, Telephone Numbers of Key Plant Personnel.
ML17320A341
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/24/1983
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A339 List:
References
PROC-830124-01, NUDOCS 8302070628
Download: ML17320A341 (27)


Text

EPP APPENDIX A LIST OF EFFECTIVE 'PAGES PAGE NUMBER REVISION NUMBER AND DATE Page 1 of 14 Revision 4, 01/21/83 Page 2 of 14 Revision 3, 09/23/82 Page 3 of 14 Revision 3, 09/23/82 Page 4 of'4- Revision 3, 09/23/82 Page 5 of 14 Revision 4, 10/18/82 Page 6 of 14 Revision 4, 10/18/82 Page 7 of Revision 5, 11/18/82 14'age 8 of 14 Revision 5, Ol/21/83 P.age 9' f 14 Revision 3, 09/23/82 Page 10 of 14 Revision 5, 01/21/83 Page ll of 14 . Revision 4, 01/21/83 Page 12 of 14 3, 09/23/82 'evision Page 13 of 14 Revision 4, Ol/21/83 Page 14 of 14 Revision 3, 09/23/82 DCR JAN 8 41983 O.

Page 1 of 1 8302070628 830201 Revision 6, 01/21/83 PDR ADOCK 05000315 F PDR

i' k

'I

~ EPP APPENDIX A TELEPHONE NUMBERS FOR KEY PLANT PERSONNEL MANAGERIAL HOME . OFFICE W.G. Smith, Jr.

B.A. Svensson E.L. Townley R.D. Begor OPERATIONS K.R. Baker H.M. Chadwell R.S. Lease C.E. Murphy

~ D.M. Draper D.F. Krause T.R. Stephens G.F. Northcutt L.K Smith A.S. Guzicki L.G. Boone H.F. Runser TECHNICAL E.A. Smarrella V.C. Vanderburg A.A. Blind D.E. Duncan T.A. Kriesel D.C. Palmer R. Simms J.T. Wojcik C.A. Ross K.S. Chapman W.F. Scott MAINTENANCE R.L. Dudding F.W. Wenman W.D. Cornell OUTAGE PLANNING E.A. Abshagen .

Page 1 of 14 Revision 4, 01/21/83

EPP APPENDIX A TELEPHONE NUMBERS FOR KEY PLANT PERSONNEL HOME OFFICE J. F. Stietzel E.A. Horse H. H. Bolinger T.P. Bielman R.L. Otte ADMINISTRATIVE L.J. Matthias D.A. Yount M.E. McAllister D.D. Nelson F.A. Arsenault Page 2 of 14 Revision 3, 09/23/82

~@ '

~~ k I "> '0 a " >> ') 'La'>>a S ~4 ' i a. ~ ws ~ 4 <<L) s 4 ~>><~Ars@VAQ'la<,

EPP APPENDIX A-I VR *f ~

t S H, S ~

e Ph '

)

p h

f t

,=- PLACE'PERATIONS STAGING AREA DIAGRAM HERE

~t +0 ~ '~

Page 3 of 14 Revision 3, 09/23/82 I

RAO>ATIO~ WHOLE BODY 5

PAFOTCCTIOtV COUNTER OIREC PCS 5TOR'AGE AREA WASHER WHOLE 8009 CO>lhlr

- ROOK o'S P4 'JPADl a

DECO>I

,08 8 8

/39> /074 PfR

!IPH 0 f 05 I MIIYAGER l59Z 0

1175 8

. OPER~A TIDES 5TAG>>VS AAPEA I'IORT H BASEh'IEIIT CLASS J2'OOA h4Z5 Crn>

Fc.FK 595'PER>>>TrozrS ~T~c i~'

~

4 =

4 41 Hl ~ '4 r 4~ > 9 4 t ~ g&\,. '44 4t 4 I EPP APPENDXX A

}4 4 ~

'1

  • HI 4- 4.

ill' 1

f 1

I 141441 p 4

4 Hf tlf 4

~,

1 4' I 'I

. I 4

," PLACE'.TECHNXCAL.SUPPORT CENTER DXAGRAM HERE

  • ~ *

~ 'H lt 1

tHI 4

4" 4 4 Page 4 of 14 Revision 3, 09/23/82

I~olev)(gp COPy oeg~

axeasEr. WWCm C4)

~t'EXTRA)

~SF'PUBLIC IIiIFO. '. XEROX.- LVPO JP/C

< PSSO SUPPLY: CRBfNETS gAOlG Qo I'~

'PET..DIR.

0

. TO'EOF QLT) PET/EOF QAEP5C IIFAO5ET Qo /ifRC.'- ..: JACKS(4) eem- .RED PhOHESt2>

AEPSC HEATER'/)

0" PSSD

~ W

'0 MAlZiP PLANT EVALUATION TEA~

P15PA SerxasmrnuS"'

4.w MADllO 028 Qcaai. BW.'-.

".BC5D

~ EXTRA PSSD

<H arne HI5 TOR'V c90ARD

. FXTRA STATUS HISTORY"

.BOARD 230ARD Z:CH'hllCAL SD'PPOA'7 CENTER

~...HEADSET JACKS (4)'

<< ~ w<<<<k <<d hr 4h Mth ~ 44

  • 4<<:4 EPP APPENDIX A 1 j r

<<P

f. h't <<V tr K

r f

d I

) <<r*

t r r

d +'t d,

f CI "

PLACE'MERGENCY OFFSITE FACILITY'LOOR PLAN 4 ~ DIAGRAM HERE h

t, th h

Il F<<

I ht, d 4 'W % ~ <<h r I r

d ~ <<" 1

<<<< t r S page 5 of 14 Revision 4, 10/18/82

I I LLttl.

ctostT

<< Raulo LOU IPL 0UD~ RECOVFRr CONT II 02 / TECII. SMPl, ITAD IPASTE 6CN fFWI Llama. DLS3OAL SCRI&C CPH DATA DISPLAV o3AIA 33 Itot tCT I0IJ LIICllottA FLN3A STATE PORC L AOO It rt 6 It AI5R. At AIIlOEIt CONST. Itolt HllC IIGIt e JPIC COJJITU3IILATIOIJK Atrsc

'TSC DIRLSOL SPARL (ItarN) ltAD.AS StSSHL NT D3IILCTOO I

btRRILJI Cltl SNLSIFF Dtrt TEST HRC

~2O SPAht hR Phoht SlATUS 57 S4AAD OPS'XTINSIONS oFI ol AII A> DCCI3IP PDg CIRRO.

IIIOIOAV NRC ooaho CohhUNICATIONS DIRE TOR S0 XS DCSD/NSP IlAPS EHS IO ~ll ls ~lo

~ <<HCADSCT COIIIILC'!log Itr STAT IIS OH T tLtplORt DOaltD SO ff [IISI J j ~is Io t's0 rII trz lttro tWrttTII rttro IIIoH ~ff ~+I <<gcv

$5 OATh DISPLAYS ITIC OFFICE LI8RARY DIAL UP OUT IN LOS LIht hIOAS FII OII HONOR

~SO'RSS IIITCIItNLTTC ENT LADltS ROOrt LOUI3Gt F OOR PLA RE% 3 II IT'Ot R. g<<ill

EPP APPENDIX A EMERGENCY OPERATIONS FACILITY TELEPHONE EXTENSIONS

\

LOCATION NO. POSITION TELEPHONE EXTENSION 1 Engineering Director 2 Mechanical Engineer 3' Electrical Engineer Civil Engineer 5 Purchasing Director 6 Purchasing Support 7 Construction Director 8 Construction Support 9 Construction Support

,10 Design Coordinator 11 Construction Support 12 QA Director 13 NSSS Support 14 NSSS Support 15 Engineer 16 Engineer 17 Engineer 18 Engineer 19 Engineer 20 Reactor Physics Analyst 21 NSL Support Coordinator 22 Procedures Coordinator 23 (TSM Spare) 24 Scheduler 25 Scheduler 26 RCM Staff 27 RCM Staff 28 Planner 29 Planner 30 RCM Staff 31 RCM Staff 32 Rad Waste Systems Coordinator 33 (RCWHM Spare) 34 (RCWHM Spare) 35 Meteorological Data Coordinator 36 NRC 37 FEMA 38 JP IC 39 TSC 40 NRC 41 Michigan Dept. Public Health 42 . State Police 43 AEPSC (Engineering EOF) 44 Scribe Page 6 of 1,4 Revision 4, 10/18/82

0

~ ~

EPP APPENDIX A EMERGENCY OPERATIONS FACIL'ITY TELEPHONE EXTENSIONS LOCATION NO. POSITION TELEPHONE EXTENSION 45 JPIC 46 - Berrien .County 47 Crisis Management Table 5Q Communications Coordinator.

51 NRC HPN Communicator 52 Radiation Protection Manager 53 Radiological Assessment Director 54 Security Guard 55 Typing (4 positions)

AEP Office Rad Waste Manager Sched 6 Plan. Manager Tech. Support Manager Recovery Manager Eng. Design & Const. Manager NRC Office Spare Page 7 of 14 Revision 5, 11/18/82

~ r ~ ~

~ ~

EPP APPENDIX A OFF-SITE NOTIFICATION LIST (PMP-2080-EPP-012)

HOME OFFICE Warnock (Radiological Suppoit Section Manager)

M. P. Alexich (Assistant Vice-President and Chief Engineer) Emerg.

H.. Soebel (Assistant Division Nuclear Engineer) Emerg.

R.W. Jurgensen (Consulting Nuclear Engineer) Emerg.

S.J. Milioti (Assistant Chief Nuclear Engineer)

. R.S. Hunter (Executive Vice-President Construction and N Y. Emerg. ~

Engineering)

G.E. LeMasters (Executive Assistant to the I&M President)

W.A. Black (I&ME Co. President)

R.C. Menge (I&ME Co. Vice-President)

J.E. Hills (Energy Information Center Manager)

C.W. Hasty (Public Affairs Director)

V.P. LaBarbera (Information Services Manager)

E.R. Swanson (NRC Resident Inspector)

N. DuBry (Assistant NRC Resident Inspector)

Michigan State Police Benton Harbor Post Page 8 of 14 Revision 5, 01/21/83

~ ~

gl EPP APPENDIX A OFF-SITE NOTIFICATION LIST (Cont'd)

(PMP-2080-EPP-012)

HOME OFFICE Michigan State Police Emergency Planning Admini~+rative Emeraency Berrien County Sheriff's Department Page 9 of 14 Revision 3, 09/23/82

  • ~ ~ ~ V

~ '

EPP APPENDIX A TELEPHONE NUMBERS FOR OFF-SITE GROUPS NAME OF OFF-SITE GROUP OR AGENCY: TELEPHONE The American Electric Power Support Organization (AEPSO)

'American Nuclear Insurers Berrien County Sheriff's Department Emerg.

Chemical Manuf acturers Assoc-. (Chemtrel)

City of Bridgman Fire Department Department of Energy (Argonne Nati:onal Labs)

Duty Hours:

Off-Duty Hours:

Fort Wayne Dispatcher or Microwave or or or INPO Lake Township Ambulance Lake Township Fire Department Memorial Hospital, St. Joseph, Michigan General Emerg.

Mercy Hospital, Benton Harbor, Michigan The Michigan Department of Public Health The Michigan Department of State Police (Benton Harbor Post 57)

National Oceanic and Atmospheric Administration Radiation Managment Corp.

Regional Director, Office of Inspection UNSRC, Region III, and Enforcement United States Coast Guard

/

Westinghouse (See page 12)

Page 10 of 14 Revision 5, 01/21/83

~ ~

EPP APPENDIX A EMERGENCY TELEPHONE NUMBERS FOR NRC NOTIFICATION TELEPHONE SYSTEM TELEPHONE NUMBER Emergency Nofitication Ssytem to NRC (Lift Receiver from Operations Center Cradle) 2; Commercial Telephone System to NRC Operations Center (via Bethesda Central Office)

3. Commercial Telephone System to NRC Operations Center (via Silver Spring Central Office) 4 Health Physics Network to NRC Operations Center
5. Commercial Telephone System to NRC Operator (via Bethesda General Office)

Page 11 of 14 Revision 4, 01/21/83

EPP APPENDIX A WESTINGHOUSE EASTERN SERVICE AREA EMERGENCY COMMUNICATION NETWORK Please inform one .Westinghouse contact, using this list in the order shown, to ensure 'early notification to Westinghouse of an emergency occurring at your plant. Please be prepaied to discuss as many facts as are available at the time of the call and identify a cognizant individual in your organization to provide continuing communications and updates to Westinghouse. I Title Name Office Home HHL Operating Plant Regional Gil Kubancsek Manager 1st Alternate Tony Suda 2nd Alternate Chay Montemayor

2. Service Response Manager Bob Stokes 1st Alternate Zohn Miller 2nd Alternate Dave Campbell e

3 Emergency Response Director Tom Anderson

4. Emergency Response Deputy Ron Lehr Director
5. Emergency News Mike Mangan NOTE: Unless indicated otherwise, all phone numbers are area code Where an area cope other than office, home, and HHL numbers.

is shown, it applies to the Page 12 of 14 Revision 3, 09/23/82

Qh EPP APPENDIX A

- CANTON CENTRAL COMPUTER COMPLEX TSO Dial Up Console Room-Console Operator Shift Supervisor Communications Room Alternate:

OFFICE HOME Joe Hubbard Head, Computer Operations Tom Marney Asst. Head, Computer Operations Dick Bezek Head, Computer Systems Division I

Todd Dixon Deputy Director, ISD Charles Falcone Director, ISD Page 13 of 14 Revision 4, 01/21/83

EPP APPENDIX A MIDAS COMPUTER PROGRAM TSO Dial Up OFFICE HOME Data General Tom Celi Mike Pine Off-Hours Status Telecopy:

Pickard, Lowe & Garrick Mark Abrams Page. 14 of 14 Revision 3, 09/23/82

PMP EPP INDEX INDIAiNA 5, MICHIGAN POklER COMPANY DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURES Index Identification -'

Title Revision No. Comments Number And Dat PMP 2080 EPP.013 Duties of the: Individual Who Rev.1.'-24-82 Discovers an Emergency Condition EPP.014 Personnel Injury Rev.l . P-1,11-30-82 Exp NA 6-15-82 EPP.015 Responsibility of the On-Site Rev. 2 Emergency Coordinator 10-12-82 EPP Appendix A Telephone Numbers for Key Plant Personnel EPP Appendix B Hospital Assistance Plan Rev.4 12-15-82 EPP Appendix C Radiological Supplement Rev.O 4-1-81 Pace IA

1 V~