Public Version of Rev 6 to App a of Emergency Plan Procedure, Telephone Numbers of Key Plant Personnel
ML17320A341
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/24/1983
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A339 List:
References
PROC-830124-01, NUDOCS 8302070628
Download: ML17320A341 (27)


Text

EPP APPENDIX A PAGE NUMBER Page 1 of 14 Page 2 of 14 Page 3 of 14 Page 4 of'4-Page 5 of 14 Page 6 of 14 Page 7 of 14'age 8 of 14 P.age 9' f 14 Page 10 of 14 Page ll of 14 Page 12 of 14 Page 13 of 14 Page 14 of 14 Revision Revision 4, 10/18/82 4, 10/18/82 Revision 5, 11/18/82 Revision 5, Ol/21/83 Revision 3, 09/23/82 Revision 5, 01/21/83 Revision 4, 01/21/83

'evision 3, 09/23/82 Revision 4, Ol/21/83 Revision 3, 09/23/82 LIST OF EFFECTIVE 'PAGES REVISION NUMBER AND DATE Revision 4, 01/21/83 Revision 3, 09/23/82 Revision 3, 09/23/82 Revision 3, 09/23/82 DCR JAN 8 41983 O.

8302070628 830201 PDR ADOCK 05000315 F

PDR Page 1 of 1

Revision 6, 01/21/83

i' k

'I

~

EPP APPENDIX A TELEPHONE NUMBERS FOR KEY PLANT PERSONNEL MANAGERIAL HOME.

OFFICE W.G.

B.A.

E.L.

R.D.

Smith, Jr.

Svensson Townley Begor OPERATIONS K.R. Baker H.M. Chadwell R.S.

Lease C.E. Murphy

~ D.M. Draper D.F. Krause T.R. Stephens G.F. Northcutt L.K Smith A.S. Guzicki L.G. Boone H.F. Runser TECHNICAL E.A.

V.C.

A.A.

D.E.

T.A.

D.C.

R.J.T.

C.A.

K.S.

W.F.

Smarrella Vanderburg Blind Duncan Kriesel Palmer Simms Wojcik Ross Chapman Scott MAINTENANCE R.L. Dudding F.W.

Wenman W.D. Cornell OUTAGE PLANNING E.A. Abshagen Page 1 of 14 Revision 4, 01/21/83

EPP APPENDIX A TELEPHONE NUMBERS FOR KEY PLANT PERSONNEL HOME OFFICE J. F.

E.A.

H. H.

T.P.

R.L.

Stietzel Horse Bolinger Bielman Otte ADMINISTRATIVE L.J. Matthias D.A. Yount M.E. McAllister D.D. Nelson F.A. Arsenault Page 2 of 14 Revision 3, 09/23/82

VR

  • t S

H, S ~

Ph

)

p h

f t

,=- PLACE'PERATIONS STAGING AREA DIAGRAM HERE

~@

~ ~

k I

"> '0 a

" >> ') 'La'>>a S ~4 '

i a. ~ ws

~ 4 <<L) s 4 ~>><~Ars@VAQ'la<,

EPP APPENDIX A-I

  • f

~

e

~t +0 ~'~

Page 3 of 14 Revision 3, 09/23/82 I

5 5TOR'AGE AREA RAO>ATIO~

PAFOTCCTIOtV OIREC PCS WASHER P4

'JPADl o'S a

WHOLE BODY COUNTER WHOLE 8009 CO>lhlr

- ROOK DECO>I l59Z

,08 8 8

. /39> /074 PfR

!IPH 05 I MIIYAGER 0 f 1175 0

8 I'IORTH BASEh'IEIIT CLASS J2'OOA

. OPER~A TIDES 5TAG>>VS AAPEA h4Z5 Crn>

Fc.FK595'PER>>>TrozrS

~T~c i~'

~

4 =

4 41 Hl

~

'4 4~

9 4 ~ g&\\,.

'44 4t 4

I r

t EPP APPENDXX A

'1

  • HI 4-4.

4 ~

}4 1

ill'

4 1

I 141441 Hf tlf f

p 4

4

~,

1

. I 4 4'

I

'I

," PLACE'.TECHNXCAL.SUPPORT CENTER DXAGRAM HERE

~ *

~'Hlt 1

44" tHI 4

4 Page 4 of 14 Revision 3, 09/23/82

I~olev)(gp COPy oeg~

axeasEr.

WWCm C4)

~SF'PUBLIC IIiIFO.'.

XEROX.-

JP/C LVPO

~t'EXTRA) gAOlG eem-AEPSC P15PA Qcaai.

".BC5D SUPPLY: CRBfNETS

~ W'0 4.w BW.'-.

Qo Qo I'~

0" MAlZiP HEATER'/)

0

/ifRC.'-..:

.RED PhOHESt2>

SerxasmrnuS MADllO"'

028

'PET..DIR.

. TO'EOF QLT)PET/EOF

~ EXTRA PLANT EVALUATION TEA~

< PSSO QAEP5C PSSD IIFAO5ET JACKS(4) arne

. FXTRA

<H HI5TOR'V c90ARD PSSD STATUS

.BOARD HISTORY 230ARD

~...HEADSET JACKS (4)'

Z:CH'hllCAL SD'PPOA'7 CENTER

hr

~ w<<<<k <<d 4h Mth ~ 44 4<<:4 EPP APPENDIX A r

<<P 1

j r

f. h't

<<V tr f

K d

I

)

<<r*

t r

r d,

d +'t f

CI "

4 ~

PLACE'MERGENCY OFFSITE FACILITY'LOOR PLAN DIAGRAM HERE h

t, th h

Il F<<

I d 4

'W

%~

<<h r

I ht, r

d

~

<<" 1 t

r S

page 5 of 14 Revision 4, 10/18/82

I I

TEST SlATUS S4AAD CIRRO.

IIIOIOAV ooaho LLttl.

ctostT

<< Raulo LOU IPL AOOIt 0UD~

RECOVFRr /

CONT II 02 IIGIt 57 TECII. SMPl, ITAD IPASTE 6CN fFWI rt 6 It AI5R.

AtAIIlOEIt

~2O AII A>

S0 XS Llama. DLS3OAL CONST. Itolt SCRI&C CPH DATA DISPLAV o3AIA33ItottCT I0IJ LIICllottA FLN3A STATE PORC L HllC e

JPIC COJJITU3IILATIOIJK DIRLSOL Atrsc

'TSC SPARL (ItarN) ltAD.ASStSSHL NT D3IILCTOO btRRILJI CltlI SNLSIFF Dtrt HRC SPAht hR Phoht OPS'XTINSIONS oFI ol DCCI3IP PDg NRC CohhUNICATIONS DIRE TOR DCSD/NSP IlAPS Itr STATIIS DOaltD EHS SO ff Io t's0 rIItrz lttro IO

~ll ls

~lo

[IISIJ j

~is

~

<<HCADSCT COIIIILC'!log OH TtLtplORt tWrttTII rttro IIIoH ~ff

~+I

<<gcv

$5 OATh DISPLAYS ITIC OFFICE LI8RARY DIAL UP OUT IN LOS LIht FIIOII HONOR

~SO'RSS hIOAS IIITCIItNLTTC ENT LADltS ROOrt LOUI3Gt F OOR PLA RE% 3 II IT'Ot R. g<<ill

EPP APPENDIX A EMERGENCY OPERATIONS FACILITY TELEPHONE EXTENSIONS LOCATION NO.

POSITION

\\

TELEPHONE EXTENSION 1

2 3'

5 6

7 8

9

,10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Engineering Director Mechanical Engineer Electrical Engineer Civil Engineer Purchasing Director Purchasing Support Construction Director Construction Support Construction Support Design Coordinator Construction Support QA Director NSSS Support NSSS Support Engineer Engineer Engineer Engineer Engineer Reactor Physics Analyst NSL Support Coordinator Procedures Coordinator (TSM Spare)

Scheduler Scheduler RCM Staff RCM Staff Planner Planner RCM Staff RCM Staff Rad Waste Systems Coordinator (RCWHM Spare)

(RCWHM Spare)

Meteorological Data Coordinator NRC 37 38 39 40 41 42 43 44 FEMA JP IC TSC NRC Michigan Dept. Public Health

. State Police AEPSC (Engineering EOF)

Scribe Page 6 of 1,4 Revision 4, 10/18/82

0

~ ~

EPP APPENDIX A EMERGENCY OPERATIONS FACIL'ITY TELEPHONE EXTENSIONS LOCATION NO.

POSITION TELEPHONE EXTENSION 45 46 47 5Q 51 52 53 54 55 JPIC

- Berrien.County Crisis Management Table Communications Coordinator.

NRC HPN Communicator Radiation Protection Manager Radiological Assessment Director Security Guard Typing (4 positions)

AEP Office Rad Waste Manager Sched 6 Plan.

Manager Tech. Support Manager Recovery Manager Eng. Design

& Const.

Manager NRC Office Spare Page 7 of 14 Revision 5, 11/18/82

~

r ~

~

~

~

EPP APPENDIX A OFF-SITE NOTIFICATION LIST (PMP-2080-EPP-012)

M.P.

H..

Warnock (Radiological Suppoit Section Manager)

Alexich (Assistant Vice-President and Chief Engineer)

Emerg.

Soebel (Assistant Division Nuclear Engineer)

Emerg.

HOME OFFICE R.W. Jurgensen (Consulting Nuclear Engineer)

Emerg.

S.J. Milioti (Assistant Chief Nuclear Engineer)

. R.S. Hunter (Executive Vice-President Construction and N Y.

Emerg.

~

Engineering)

G.E. LeMasters (Executive Assistant to the I&M President)

W.A. Black (I&ME Co. President)

R.C.

Menge (I&ME Co. Vice-President)

J.E. Hills (Energy Information Center Manager)

C.W. Hasty (Public Affairs Director)

V.P. LaBarbera (Information Services Manager)

E.R.

Swanson (NRC Resident Inspector)

N.

DuBry (Assistant NRC Resident Inspector)

Michigan State Police Benton Harbor Post Page 8 of 14 Revision 5, 01/21/83

gl

~

~

EPP APPENDIX A OFF-SITE NOTIFICATION LIST (Cont'd)

(PMP-2080-EPP-012)

HOME OFFICE Michigan State Police Emergency Planning Berrien County Sheriff's Department Admini~+rative Emeraency Page 9 of 14 Revision 3, 09/23/82

~

~

~

V

~ '

EPP APPENDIX A TELEPHONE NUMBERS FOR OFF-SITE GROUPS NAME OF OFF-SITE GROUP OR AGENCY:

TELEPHONE The American Electric Power Support Organization (AEPSO)

'American Nuclear Insurers Berrien County Sheriff's Department Chemical Manufacturers Assoc-.

(Chemtrel)

City of Bridgman Fire Department Department of Energy (Argonne Nati:onal Labs)

Duty Hours:

Off-Duty Hours:

Fort Wayne Dispatcher Emerg.

or Microwaveor or or INPO Lake Township Ambulance Lake Township Fire Department Memorial Hospital, St. Joseph, Michigan Mercy Hospital, Benton Harbor, Michigan The Michigan Department of Public Health The Michigan Department of State Police (Benton Harbor Post 57)

National Oceanic and Atmospheric Administration Radiation Managment Corp.

Regional Director, UNSRC, Region III, Office of Inspection and Enforcement United States Coast Guard

/

Westinghouse General Emerg.

(See page 12)

Page 10 of 14 Revision 5, 01/21/83

~

~

EPP APPENDIX A EMERGENCY TELEPHONE NUMBERS FOR NRC NOTIFICATION 2;

3.

4 5.

TELEPHONE SYSTEM Emergency Nofitication Ssytem to NRC Operations Center Commercial Telephone System to NRC Operations Center (via Bethesda Central Office)

Commercial Telephone System to NRC Operations Center (via Silver Spring Central Office)

Health Physics Network to NRC Operations Center Commercial Telephone System to NRC Operator (via Bethesda General Office)

TELEPHONE NUMBER (Lift Receiver from Cradle)

Page 11 of 14 Revision 4, 01/21/83

EPP APPENDIX A WESTINGHOUSE EASTERN SERVICE AREA EMERGENCY COMMUNICATION NETWORK Please inform one.Westinghouse

contact, using this list in the order shown, to ensure 'early notification to Westinghouse of an emergency occurring at your plant.

Please be prepaied to discuss as many facts as are available at the time of the call and identify a cognizant individual in your organization to provide continuing communications and updates to Westinghouse.

I Title Name Office Home HHL Operating Plant Regional Manager 1st Alternate 2nd Alternate Gil Kubancsek Tony Suda Chay Montemayor 2.

Service

Response

Manager 1st Alternate 2nd Alternate 4.

Emergency

Response

Deputy Director 3

Emergency

Response

Director Bob Stokes Zohn Miller Dave Campbell e

Tom Anderson Ron Lehr 5.

Emergency News Mike Mangan NOTE:

Unless indicated otherwise, all phone numbers are area code Where an area cope other than is shown, it applies to the office, home, and HHL numbers.

Page 12 of 14 Revision 3, 09/23/82

Qh

EPP APPENDIX A

- CANTON CENTRAL COMPUTER COMPLEX TSO Dial Up Console Room-Console Operator Shift Supervisor Communications Room Alternate:

OFFICE HOME Joe Hubbard

Head, Computer Operations Tom Marney Asst.
Head, Computer Operations Dick Bezek
Head, Computer Systems Division I

Todd Dixon Deputy Director, ISD Charles Falcone

Director, ISD Page 13 of 14 Revision 4, 01/21/83

EPP APPENDIX A MIDAS COMPUTER PROGRAM TSO Dial Up OFFICE HOME Data General Tom Celi Mike Pine Off-Hours Status Telecopy:

Pickard, Lowe

& Garrick Mark Abrams Page.

14 of 14 Revision 3, 09/23/82

PMP EPP INDEX INDIAiNA 5, MICHIGAN POklER COMPANY DONALD C.

COOK NUCLEAR PLANT PLANT MANAGER PROCEDURES Index Identification Number

-' Title Revision No.

And Dat Comments PMP 2080 EPP.013 Duties of the: Individual Who Discovers an Emergency Condition Rev.1.'-24-82 EPP.014 EPP.015 EPP Appendix A Personnel Injury Responsibility of the On-Site Emergency Coordinator Telephone Numbers for Key Plant Personnel Rev.l 6-15-82 Rev.

2 10-12-82 P-1,11-30-82 Exp NA EPP Appendix B

Hospital Assistance Plan Rev.4 12-15-82 EPP Appendix C

Radiological Supplement Rev.O 4-1-81 Pace IA

1 V~