ML17319B619

From kanterella
Jump to navigation Jump to search
Request for Temporary Relief from Requirements of Tech Specs 3.9.9 & 3.3.3.1 While in Mode 6 & Tech Spec 3.0.4 to Allow Crossing from Modes 5 to 6 While in Action Statement,In Order to Install Isolation Valves
Date released: 05/31/2018 Download: ML17319B619


Tech Spec Page 3/4 9-9 Re Containment Purge & Exhaust Isolation Sys
ML17319B620
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/29/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17319B620 (2)
Request for Temporary Relief from Requirements of Tech Specs 3.9.9 & 3.3.3.1 While in Mode 6 & Tech Spec 3.0.4 to Allow Crossing from Modes 5 to 6 While in Action Statement,In Order to Install Isolation Valves
ML17319B618
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/29/1982
From: Hering R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML17319B618 (10)