ML17319B583

From kanterella
Jump to navigation Jump to search
Confirms 820922 Telcon Re Masonry Walls.Addl Info Required within 45 Days to Complete Review
ML17319B583
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/04/1982
From: Varga S
Office of Nuclear Reactor Regulation
To: Dolan J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 8210150491
Download: ML17319B583 (5)


Text

Ot;1'

]982 Docket Nos.

50-315 and 50-316 I1r. John Dolan, Vice President Indiana and Hichigan Electric Company Post Office Box 18'owling Green Station New York, New York 10004

Dear ter. Dolan:

DISTRIBUTION Docket File NRC PDR Local PDR ORB 1 File D. Eisenhut OELD E. L. Jordan, DE(A:IE (1)

J.

N. Taylor, DRP: IE (1)

D. Wigginton C. Parrish NSIC ACRS (10)

J.

Heltemes In our review of the masonry walls at the D. C. Cook Nuclear Plant Unit Nos.

1 and 2, we have identified additional information which we will need in order to complete our review.

The questions identifying the information were discussed with your staff by telephone on September 22, 1982 and are enclosed for your attention.

It is requested that you respond within 45 days upon receipt of this letter.

Sincerely, priginal signed bTt

p. A. Varga

Enclosure:

As stated Steven A. Varga, Chief Operating Reactors Branch No.

1 Division of Licensing cc w/enclosure:

See next page 821015049i 82i004 PDR ADQCK 050003i5 P

PDR ORB 1

OFFICE/

SURNAME/

DWig inton/r 82 10/

DATE Q NRC FORM 318 (10-80) NRCM 0240 0

arg

~

~ ~ ~ 0 10

~

o)4 ~ 0 0 ~

OFFICIAL RECORD COPY USGPO: 1981~39 990

A v <4

-A I

4 t

II ~, ll r~

4 4

~

~,

k 4

4 I

fi f

V

Mr. John Dolan Indiana and Michigan Electric Company cc:

Mr. Robert W. Jurgensen Chief Nuclear Engineer American Electric Power Service Corporation 2 Broadway New York, New York 10004 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 Maude Preston Palenske Memorial Library 500 Market Street St. Joseph, Michigan 49085

.W.

G.- Smith, Jr., Plant Manager Donald C. Cook Nuclear Plant P. 0.

Box 458 Bridgman, Michigan 49106 U. S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103 The Honorable Tom Corcoran United States House of Representatives Washington, D. C.

20515 James G. Keppler Regional Administrator - Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen El lyn, Illinois 60137

ENCLOSURE D. C.

COOK NUCLEAR PLANT UNITS 1

5 2 Based on the conference call on September 22, 1982, the following questions need further clarification:

(1)

Provide relevant quality assurance/quality control records to ascertain the existence of Dur-0-Wall in the walls as specified.in the design.

If no record is available, the licensee is requested to develop some means to confirm its existence.

(2)

Provide verification to assure proper anchorage of Dur-0-Wall at the boundary and proper bonding between Dur-0-Wall and mortar.

(3)

Justify the use of Dur-0-Wall as reinforcing element in masonry walls in view of the fact that this is normally not considered a reinforcing element.

In your justification include relevant test data with discussion on applicability of these test data to D.

C.

Cook masonry walls.

(4)

Indicate the number of walls which were qualified relying on the strength of Dur-O-Wall, and the calculated stress leve'1 in the rebar.

0 rN P