Public Version of Procedure Temporary Sheets to Emergency Plan Procedures PMP 2080 EPP.001 Re Emergency Plan Activation & Condition Classification & PMP 2080 EPP.020 Re Operation of Technical Support Ctr
ML17319B291
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/25/1982
From: Jerz C, West R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B289 List:
References
PROC-820325-02, NUDOCS 8204150129
Download: ML17319B291 (6)


Text

>>, ~ ) ..') .")>>>> e4. ~ .s>>,z s>>.

lAIAIIIA Er MICHIIAItj ECECTBIC CO%PAN V DONALD C. COO'K NUCLEAR PLANT Instruction or Procedure Temporary Sheet TEMPORARY This temporary sheet applies toE)regency Pl<n 8>>'<<fi<n and &)Id)>1'on Cl~scs'8:c<I~on SHEET NO.

Instruction or Procedure No. PmP goao ePPcel E'<hi'hl'53 Revision No. /

The following change (g ) new requirement ( ) shall be instituted effective (Date)

Ecc, -g Under "On~ava/ Eifcn t' j'fern Zh add:

/

k07E o 8e fere. aPP lyIIIq 4l's 4/'I ef'i oft en saf'c-7 )Via(

ccAHdouJ scleehf Is 5'ef Po, / an J

~<f'+~ nI<+e Yi I++) sclce.70r I5cf' /y DCR fr,')'<(( '>

5 19@

span'gp)))

Q 3~ <<Svo) &'n7 cf'I +flon )$ ynIy ag(:mme- wAen al a'cf 4

pg gay f >>Te/gc dot Sccll &Ae5 'fy ) g are /if I

This change should be made a permanent revision to the Instruction or Procedure:

OfYES clNO 0NOTKNOWNaddittonal review required Expirati'm Cate: Pro em'w.e- Pev isI'c n Standard Dist. List No.:

Originator. Distribution:

Maragemnt Staff.

Senior PNSRC AZ/vR Foaa No 4330 .. RRvtaxnvna WB1TE CANARY ORIGINAL ORIGINATOR COPY

) PINK WORKING COPY 8204150129 820406 PDR *DOCK 05000315 F

1

.0"'-'~~a>y'~ 8

~ ~ t

~ PMP EPP INDEX IiNOIANA Za HICHIGAN POSER COMPANY DONALD C. COOK NUCLEAR PLANT PLANT NNAGER PROCEDURE indev.

Identification Ti tie Revision No. Ccmments Number And Date PMP2080 EPP.OOI Emergency Plan Activation Revision 1 TP-1,1-23-82 Exp N/A and Condition Classification 10-27-81 TP-2,3-15-82 Exp N/A TP-3,3-15-82 Exp N/A EPP.002 Unusual Event CANCELLED P. 4,3-18-82 Exp, N/A 10-29-81 EPP.003 Alert CANCELLED 1Q~M1 EPP.004 Site Emergency CANCELLED .

M-.29 1

M.~

EPP.005 General Emergency CANCEL L'ED .

.10.-.29-8'L EPP.006 Initial Dose Assessments Revision

'-27.-81 TP-1,3-12-82 Exp N/A (Gaseous). TP-2,3-16-.82 Exp N/A EPP.007 Initial Release Assessments Revision 0 TP-1,2-23-82 Exp N/A (Liquid) 4-1-81 EPP.008 Calling Off-Duty Plant Revision 0 Personnel 4-1.-81 "

EPP.009 Fire Emergency Guidelines Revision 0 4-1-81 EPP.010 oxic Gas Release Revision 0 uidelines 4-1-81 EPP.,011 atural Emergency Guidelines Revision 0 4-1-81 EPP.012 nitial Off-Si te Revision 0 TP-1,2-1-82 Exp N/A otification 4-1-81 EPP.013 uties of the Individual. Mha Revision 0 iscovers an Emergency 4-1-81 ondition Pege Rev. Oet=-3-2f @

. -~ .. ><<.. ~ e, = ~ <<<<~ ...,, - -. ma* .. ~ <<.~, <<.<<<< ~ <<w..<< - ~ am~<<<<w<< *<<<<.. ~,' ~ ...*

INDIANA & NIICHI AN ECECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT lnstructton or Procedure Temporary Sheet TEMPORARY This temporary sheet applies to Activation & Operation of the SHEET NO.

or Procedure No. PHP 2081 EPP .020 TSC'nstruction TP-2 Revision No. 0 The following change (X ) new requirement ( ) shall be instituted effective (Date) MarCh 12, 1982 Add the following after section 4.6 4.7 Responsibilities of Initial People in TSC 4.7.1 Turn on CAM ( 1nstructions attached to top of machine).

4.7.2 Turn on Tally's (Computer printers on east wall, instructions attached to machine.)

4.7.3 Unlock both cabinets in communicators room.

Note: Key can be obtained from SS key cabinet STA key cabinet, or from break glass station in TSC (after its installed.)

4.7.4 Distribute communicators ear pieces.

most locked 4.7.5 Turn on camera's. Key is on hook in the northern of counter cabinet. Insert key in keyhole at south end top and turn top of key towards the ~st wall.

Note: Key movement is very small and T.V. screens require a few seconds before images appear.

4.7.6 Turn on copier.

4.7.7 Turn on low intensity lighting.

4.7.8 Set out paper, pencils, questions sheets, etc.

Reason: First people to arrive in TSC may not know how to activate TSC, NSDRC Audi't Comment g]7, D) C!=<

l!t. ii,~ b inc. ~

This change should be made a permanent revision to the Instruction or Procedure: ~

cXYES a NO o NOT KNOlNN, additional review required Expration Date With Procedure Revision Standard Dist. List No.:

t)nynator Distribution:

Management 5 Sere or PNSRC Plant Manager Form No. 4330 'KVIaEDTIVS. WHITB ORIGINhI<<

ChNhRY ORIGINhTOR COPY PINK WORKING COPY S <<

i~14 'u'1r,r gibe& ".'I 1JUJ A h 4 I DIANA 8 MICHIGAN azcraIC COwwIIIV DONALD. C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet TEMPORARY This temporary sheet applies to Activation 5 Operation of the TSC SHEET NO.

Instruction or Procedure No. PMP 2081 EPP .020 TP-3 Revision No. O The following change ( X ) new requirement ( ) shall be Instituted effective (Date) March 12 1982 Add the Following after step 4.2.5 4.2.6 Realigns T.S.C. ventilation to the recirculation mode when either the CAM or area monitor start alarming.

NOTE: The switch for realining the ventilation is located on the north wall of the S.S. office. The switch should be turned from the Normal position'o the Emergency Position.

4.2.7 Resets (by pressing reset button) the area monitor or CAM (after changing filters (all instructions on machine).

Reason: To protect personnel in TSC, NSDRC Audit Covalent F17, DC:

~

This change should be made a permanent revision to the Instruction or Procedure: I 4~-'I~ '" ~

oNO ONOTKNOWN,-addittonai review required

'YES Expiraticn Date: With Procedure Revision Standard Dist. List No.:

Orllnator. Distribution:

Management Senior PNSRC Plant Manager Farm No.. 4330; RxvIazn vrra.

~ WHITE CANARY ORIGINAL ORIGINATOR COPY PINK .WORKING COPY',

PMP EPP INDEX IiNOIAiNA 5 MICHIGAN POWER COMPANY OONALO C. COOK NUCLA~ R PLAiNT

'I PLANT MANAGER PROCEDURE Index Identification Ti tie ReviSion No.i Comments Number And Date PMP 2881 EPP.014 Off-Site Dose Assessments Revision 0 TP-1,2-25-82 Exp N/A 4-1-81 EPP.015 Sampling and Analysis of Revision 0 Waterborne Releases. 4>>1-81 EPP. 016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EPP. 017 Interpretation of Liquid Revision 0 and Gaseous Samples 4-1-81 EPP.018 Transporta ti on Accidents Revision 0 Involving Radioactive 4-1-81

'ateri al EPP.019 AEP Emergency Response Revision 0 Organization Activation and 4-1-8 Management EPP.020 Activation and Operation of Revision 0 TP-1,11-16-81 Exp N/A the Technical Support Center ,

4-1-81 P-2,3-12-82 Exp N/A (TSC) TP-3,3-'12-82 Exp N/A EPP.021 Activation and Operatio'n of Revision 0 TP-1,11-16-81 Exp N/A the Operations Staging Area 4-1-81 (OSA) and Personnel Accountabi 1 i ty EPP.022 Activation and Operation of 'evision 0

the Recovery Center (RC) (An . 4>>1-81 Emergency Operations Facility)

EPP.023 Activation and Operation of Revi'sion 0 the Emergency Control Center 4-.1-81 (ECC) (An Emergency Operations Facility)

'I EPP.024 Activation and Operation of Revision 0.

the Joint Public Information 4-1-81 Center (JPIC) (An Emergency Operations Facility)- sc UI Ref. De-.e&~a, -8