ML17319B271
| ML17319B271 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/07/1982 |
| From: | Hering R INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0578, RTR-NUREG-0737, RTR-NUREG-578, RTR-NUREG-730, RTR-NUREG-737, TASK-2.D.1, TASK-TM AEP:NRC:0585B, AEP:NRC:585B, NUDOCS 8204130278 | |
| Download: ML17319B271 (8) | |
Text
"AOCESSION NBR FACIL;50~3l>5
.50-.31.6 AUTH~ NAPE HER ING E 8 ~ F ~
<<RE}CIP. NAME.
DENTONrHGR ~
REGULATORY +FORMATION DISTRIBUTION"'SYM,DRIBS) c 8204 i30278, DOC bATE: "'82/*04/07, NQTARI'ZEO: NO...DOCKET ¹ Donald C, :-Cook Nuclear Power
'Pl=anti Unft lr =Indiana L
0500031'5 Donald O. -CookNuclear Power Planti 'Unf;t 2E Indiana I 05000316 AUTHOR AF F ILIATgON Indiana L Michfgan <<Electr ic Co ~
RECIPIENT AFFILIATION, Office of Nuclear >Reactor 'Regulationr
<<0$>nector>
SUBJECT:
"Responds
.>to NRC 810921 l}tr r e nequi-r ements of -'NUREG>>0737r I48Al 1 1 8 D ~ 1 r <<PAR Re 1 i e f,8 Sa fe ty.Va 1 ve ><<T>est IP<<r ogr am,.'<
<<Conditions, tested enveloee, range <<to >ekpec}ted operating 5
accident conditions for.facilities, DI'STRIBUTION >CODE>
AOASS
>COPIES >RECEIVED:LTR. }. >ENCL D 'SIZE;.'$
TI'TLK: Response to NUREG '737/NUREG 0660 tTMI 'Action '.Pl an <<Rgmts'.(OL's)
NGTES!
RECIPIENT.
ID,CODE/NAME
'01 IN7>ERNAL8
.'ELAD If/DEP DIR
'33 IE/DEP/FPLB, NRR/DE/ADCSE 22 NRR/DE/ADSA 17 NRR/DHFS/OEPY29 NRR/DL/AOL 16 NRR/OL/ORAB 18 NRR/OSI OIR
'2'RR/DS I/ADPS '?5 NRR/DS I/AES NRR/OSI/RA 8
-NRR/DST/ADT
<<32 RGN3 E>XTERNAL'. "ACRS T3g
=-INPO E J;STARNES NRC POR 02 NTIS
<<COPIES
,LTTR 'ENC
,7 s
10 1
1 RECIPIENT IO.CODE/NAME IE 1'2'f/DEP/f PDB NRR/DE
. DIR
'21 NRR/OE/ADNQE '23 NRR/DHFS DIR 28 NRR/OL 'DIR 14 NRR/DL/ADOR 1'5 NRR/OSI AORS "27 NRR/OSI/AOGP 31 NRR/DSZ/AORP a6 NRR/DSZ/ElTSB I:R
>30 REG F ILE
'04 FEHA<<REP OIV LPDR 03 NSIC Q5 COPIES L'PTR ENCL 1
1 1l 1
1
~l 1
.1l 1
1
~ 1 0
TOTAL NUMBER OF >COP IES REQUIRED j UT'TR
'55 ENCL
q I 1~$ r
~ i'I I r
<<1 I':4 I.'I
'I(l>'I
'1'>nr 'I y >fn li, I! yw
<<Wn I i',i )
~, 1
,,wi,I;if' hl I
ig 1
llI '1 II,)
>>II la( 'fiwn
'a4 1'
nI I
n> "1 ln I
1 II'II
'1 l
n Wj W'I Q fin>IQ gf I+i)
II'I " I'1
~ >'gr1I r f r lN I-jl>/w Ines liw11n,p w
i.'II I
(+ I 8 wli ) 4 r 9 If 1 9 <<Ii a
~>
I WW>I j
)r ii 0 ii ',1('I'i ll<<'I l
I'I Ir 4>
<<> lf) 1<'41 (Il'll Il I 'I,nk If
.> II'(i.
Wii+
I If I'
I,IJ(fn I)
II II% li W
i,l,fI (In Ii+ WC
<<I n
~
5i
INDIANA L MICHIGAN ELECTRIC COMPANY P
O.
BOX 18 POWLING GREEN STATION NEW YORK, N. Y. 10004 April 7, 1982 AEP:NRC:0585B Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NUREG-0737, Item II.D.1 PWR RELIEF & SAFETY VALVE TEST PROGRAM Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 BECEfygOII AF'Rxemep~
8 ne
Dear Mr. Denton:
In accordance with the initial recommendations of NUREG-0578, Section 2.1.2, as later clarified by NUREG 0737, Item II.D.1 and the NRC letter of September 29, 1981, each Pressurized Water Reactor (PWR)
Utility on or before April 1, 1982 was to submit a preliminary evaluation supported by test results which demonstrates the capability of relief and safety valves to operate under expected operating and accident conditions.
This letter is Indiana
& Michigan Electric Company's response and is applicable to the Donald C. Cook Nuclear Power Plant, Units No.
1 and No. 2.
& Michigan Electric Company is a participant utility in the Generic PWR Safety and Relief Valve Test Program implemented by the Electric Power Research Institute (EPRI) at the request of participating PWR Utilities in response to the USNRC recommendations for safety and relief valve testing.
The primary objective of the Test Program was to provide full scale test data confirming the functionability of primary system power operated relief valves and safety valves for expected operating and accident conditions.
A second objective of the program was to obtain sufficient piping thermal hydraulic load data to permit confirmation of models which may be utilized for plant unique analysis of safety and relief valve discharge piping systems.
Relief valve tests were completed in August, 1981 and safety valve tests were completed in
- December, 1981.
The reports prepared by EPRI documenting the Test Program results are as follows:
"Valve Selection/Justification Re ort" This report documents that the valves selected for testing represent all participating PWR plant safety and relief valves.
8204130278 820407 PDR ADOCK 05000315 P
PDR.,
i
,V J
Il 1q 4
/,
K. Harold R. Denton
- NRC:0585B
~
~
"Test Condition Justification Re ort" and the "Westin house Plant Conditions Justification Re ort" These reports document the basis and justification of the valve test conditions for all participating PWR plants.
"Safet and Relief Valve Test Re ort" This report provides evidence demonstrating the functionability of the valves selected for testing under selected test conditions for all participating PWR plants.
"A lication of RELAP 5/MOD 1 for Calculation of Safet and Relief Valve Dischar e Pi in H drod amic Loads" This report presents an analytical model benchmarked against test data that may be used for plant unique analysis of safety and relief valve discharge piping systems.
All of the above documents have been received by Indiana
& Michigan Electric Company.
They are being transmitted to you by Mr. David Hoffman of Consumers Power Company on behalf of the participating PWR Utilities as part of our response to the preliminary submittal requirement.
The Donald C. Cook Nuclear Plant has Masoneilan Model i/38-20721 power operated relief valves and Crosby Model 8HB-BP-86-6M6 safety valves.
These valves are identical to those tested in the EPRI valve test program.
Indiana 6 Michigan Electric Company has performed a
preliminary review of the test results and has concluded that the valves tested represent the safety and relief valve designs and that the conditions tested envelope the range of expected operating and accident conditions for the Donald C. Cook Nuclear Plant.
Also, the above mentioned reports will be used to perform the final plant specific evaluations.
The September 29, 1981 NRC letter requested that plant specific final evaluations be submitted by July 1, 1982.
In order to meet that date, plant specific evaluations have been initiated.
Depending on the initial findings it may be necessary to continue the evaluation beyond July 1, 1982. If a longer evaluation period is required you will be notified on or before July 1, 1982.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, R. F. Hering Vice President
r t
'4 1
1
Mr. Harold R. Denton AEP:NRC:0585B cc:
John E. Dolan Columbus R.
W. Jurgensen W. G. Smith, Jr.
Bridgman R.
C. Callen G. Charnoff Joe Williams, Jr.
NRC Resident Inspector at Cook Plant Bridgman
~ tg
~