ML17319B239
| ML17319B239 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/26/1982 |
| From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17319B237 | List: |
| References | |
| PROC-820226, NUDOCS 8203180519 | |
| Download: ML17319B239 (8) | |
Text
WDOeA 8 wisely ELECTRIC COMPAIIIY DONALD C. COOK NUCLEAR PLANT instruction or Procedure Temporary Sheet This temporary sheet applies to OFF-SITE RADIOLOGICAL MONITORING'nstruction or Procedure No.
TEMPORARY SHEET NO.
TP-1 The following change
( X
)
new requirement
(
)
shall be instituted effective (Date)
Change step 3.7.2 to read:
Place a particulate filter and a silver zeolite cartridge in the air sampler and collect a sample of 5 to 10 cubic foot volume at'the
'location where the mRem/hr reading was the highest (found during the traverse).
Step 3.7.4 - Change "charcoal" to "silver zeolite".
REASON:
Change sample specification from time to total volume.
Change re-ferences to charcoal cartridges to silver zeolite This change should be made a permanent revision to the Instruction or Procedure:
tPES aNQ oNOTKNOWN,addittonal review required Expiraticn Date:
Originator:
Management
-Staff:
Senior Reactor Operator:
PORC Rant Manager Standard Dist. List No.:
Distribution:
Ftgrzvs 'Nn. vtglln =
RKVISEO r/78 Baa3~8OS<9 Ba03ii PDR ADQCK 050003l5 F
se r <<l* 'Ut! 4 pDp WO WHITE ORIGINAL CANARY OEIGINATOE COPY PINK WOBKINGCOPY
l 1
'I
'I 7I l
~i - 4' mr
, g
INNAIIIA,8 iPII'8!GPII DONALD C. GOOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to ENVIRONMENTAL MONITORING 4lt ANALYS'IS Instruction or Procedure No.
0 TEMPORARY SHEET NO.
TP-1 The following change
(
X )
new requirement
(
instituted effective (Date)
F bruar 982
)
shall be Change step 3.2.7 to read:
Collect air samples of 5 to 10 cubic feet total volume at the location of maximum dose rate (cloud centerline) at various distances (e.g., consider 1, 2, 3, 4, 5, 10, 20 miles from the site).
r sv REASON:
Change sample specification from samp'le time to total sample volume to account for different sample flow rates.
This change should be made a permanent revision to the Instruction or Procedure:
EYES oNO a NOT KNOWN, addittonal review required
'xpiration Date:
Oridonator:
Maragerrent Staff:
Senior Reactor Opeatcr:
PNSRC Plant Manager Standard Dist. List No.:
Distribution:
Form No. 4330 Rzvtsm 717a PORM No. PMI 201&4 RKV. a
%HITE ORIGINAL CANARY ORIGINATOR COPY PINK proR?tING COPY 7
I
DONALD C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to OFF-SITE DOSE ASSESSMENTS, Instruction or Procedure No.
0 The following change
(
X )
new requirement
(
)
shall be instituted effective (pate) 25 Februar, 1982 TEMPORARY SHEET NO.
TP-1 The procedure is defective and is not to be used until the review currently in progress results in the necessary revisions.
~,I s
REASON:
Current procedure is incomplete and does not agree with other methods of off-site dose assessment.
This change should be made a permanent revision to the instruction or Procedure:
clYES
@NO QNOT KNOWN, addittonal review required Expirati'cn Date:
C}riginator.
Management
.Staff:
Senior Reactor Operatcr:
PNSRC Plant iVhnager
~'EVISION DIte Z-Z -g'Z-DIte Standard Dist. List No.:
Distribution:
Form No. 4330 REVI8EDT/I8 PORlC NO. PMI 2OI&4 REV. 2
%81TE ORIGINAL CANhRY ORIGINATORCOPY
~ PINK Pro EKING COPY
PMP EPP INDEX IiNDIANA Im> MICHIGAN PO'ilER CGMPAi'tY DONALD C.
COOK NUCLm<'R PLk>')>
PLANT MANAGER PROCEDURE Index Ioen'ci f1 cat'ton Number Titie Revision No.>
And Date Ccnnents PMP.2M1 EPP.QOl Emergency Telephone Communications EPP;002 Barring of the PABX Revision 0
4-1-81 Revision 0
4-1-81 EPP.003 Follow-Up Off-Site Communications Revision 0
4-1-81 EPP.004 Protective Action Guides Revision 0
(PAGs) and Protective Actions 4-1-81 EPP.005 Personnel Evacuation EPP.006 Activation of the Reentry and Rescue Team EPP.007 Security Actions During Emergency Conditions EPP.008 Emergency Medical Plan Guidelines EPP.099 Health Physics Procedures EPP.010 Activation of Radiation Monitoring Teams EPP.011 On-Si te Radi ologi cal Monitoring EPP.012 Off-Site Radiological Monitoring EPP.013 Environmental Monitoring and Analysis Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 "-
Revision 0
4-1-81 Revision 4=1-81" Revision 0
4-1-81 Revision 0
4-1-81 TP-1,2-25-82 Exp N/A TP-1,2-25-82 Exp N/A Peg"-
Rev Oa e 4 "a6-Pg
PMP EPP INDEX INDIANA 5 MICHIG"N PQ':iER COMPANY DONALD C.
COOK NUCLm~'R PLANT PLANT MANAGER PROCEDURE indev Identification Number Titie Revis.'on No.f And Gate Comments PMP 2681 EPP.014 Off-Site Dose Assessments EPP.015 Sampling and Analysis of Materborne Releases EPP.016 Collection and Analysis of Liquid and Gaseous Samples EPP.017 Interpretation of Liquid and Gaseous Samples EPP.018 Transportation Accidents-Involving Radioactive Material EPP.019 AEP Emergency
Response
Organization Activation and Management EPP.020 Activation and Operation of the Technical Support Center (TSC)
Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
.4-1-8)
Revision 0
4-1-81 TP-1,2-25-82 Exp N/A TP-1,11-16-81 Exp N/A EPP. 021 EPP.022 EPP.023 EPP.024 Activation and Operatio'n of the Operations Staging A@ca (OSA) and Personnel Accountability Activation and Operation of the Recovery Center (RC)
(An Emergency Operations Faci 1 ity)
Activa tion and Opera tion of the Emergency Control Center (ECC)
(An Emergency Operations Facility)
Activation and Operation of the Joint Public Information Center (JPIC)
(An Emergency Operations Facility)
Revision 0.
4-1-81
'evision 0 4-1-81 Revi'sion 0
4-1-81 Revision 0
4-1-81 TP-1,11-16-81 Exp N/A 3
'e s.~
l.