Forwards IE Insp Repts 50-315/81-26 & 50-316/81-29 on 811102-06.No Noncompliance Noted
ML17319B152
Person / Time
Site: Cook  
Issue date: 12/21/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17319B153 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8201260479
Download: ML17319B152 (3)


See also: IR 05000315/1981026

Text

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Electric Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Gentlemen:

This refers to

of this office

Plant, Units

1

No. DPR-74 and

others of your

the routine safety inspection

conducted

by, Mr. I,. J. Hueter

on November 2-6,

1981, of activities at D..'.

Cook Nuclear

and 2, authorized by NRC Operating. License

No. DPR-58 and

to the discussion of our findings with Mr. Shaller

and

staff at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

No,items of noncompliance with NRC requirements

were identified during the

course of this inspection.

This will also acknowledge your letter dated

November 3,

1981, regarding the

schedule for installation of the shielded frisker stations.

We will review

this matter further during

a subsequent

inspection.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document

Room. If this report contains

any information

that you (or your contractors)

believe to be exempt from disclosure

under

geo~

820i26047'P

811221 ~

PDR

ADOCK 05000315

),

9

PDR Q

j

J

4

American Electric Power Service

- 2-

Corporation,

OEC21$ 81

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by tele-

phone within ten (10) days

from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days

from the date of this letter

a written application to this office

to withhold such information. If your receipt of this letter has been

delayed

such that less

than seven

(7) days are available for your review,

please notify this office promptly so that

a new due date

may be estab-

lished.

Consistent with Section 2.790(b)(1),

any such application must

be accompanied

by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld,

and which

contains

a full statement of the reasons

which are the bases

for the

claim that the information should be withheld from public disclosure.

This section further requires

the statement

to address

with specificity

the considerations

listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above,

a copy of this letter and the enclosed

inspection report will be placed in the Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

>tyj'jar.f Cf ~>"-4,5F C,h. f'ol'gfU""fd:

C. E. Norelius, Director

Division of Engineering

and

Technical Inspection

Enclosure:

Inspection

Report No. 50-315/81-26

and No. 50-316/81-29

cc w/encl:

D. V. Shaller, Plant Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

RIII

Hueter/jp

12/14/81

RIII

Gr ger

RIII

ayes

RII

N

elius