ML17319B128

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/81-11 & 50-316/81-14 on 810601-04 & 0813 & IE Insp Repts 50-315/81-15 & 50-316/81-21 on 810701-31
ML17319B128
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/31/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B129 List:
References
NUDOCS 8201180491
Download: ML17319B128 (3)


See also: IR 05000315/1981011

Text

OEC S~ )6

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the routine safety inspections

conducted

by Messrs.

E. R,

Swanson

and N. E. DuBry of this office on July 1-31,

1981,

and

J.

A. Grobe of this office during the period June

1 through August 13,

1981, of the activities at Donald C.

Cook Nuclear Plant, Units

1 and 2,

authorized

by NRC Operating I,icenses

No. DPR-58

and No. DPR-74 and to

the discussion of our findings with Mr. D. Shaller at the conclusion of

the inspections.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room unless

you notify this office,

by telephone,

within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the re-

quirements of 2.790(b)(1).

The enclosed

two reports provide the basis for escalated

enforcement action

which is forthcoming and has been forwarded to you under

a seperate letter

by our Headquarters

staff.

This letter will set forth certain matters of

concern

and the items of noncompliance

found during these inspections.

Your response

to the items should be made directly to our Headquarters,

Office of Inspection

and Enforcement.

DESIGNATED ORIGIN&

Certified. 2g

820ff8049f 8ii23i

PDR

ADOCK 0500031S~

6

~

-

PDRL

/<</~l~

P

0

0

0

V

L

'I

tl "

c

~

I

a ll

t

(

kE

II'E

N

i

t4

I

II

5 a,

ee

e

American Electric Power Service

- 2-

Corporation

The responses

directed by this letter are not subject to the clearance

procedures

of the Office of Management

and Budget as required by the

Paperwork Reduction Act of 1980,

Pl 96-511.

We will gladly discuss

any questions

you have concerning the inspections.

Sincerely,

Original signed

by James

G. Keppler

Enclosures:

1.

Inspection Reports

No.

50-315/81-11

and No.

50-316/81-14

2 ~

Inspection Reports

No.

50-315/81-18

and No.

50"316/81-21

cc w/encls:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

James

G. Keppler

Regional Administrator

RIII

be/jp

Heyee

+eeking 12/29/81

RIII

RIII

RIII

RIII

G

R FLU

i

iams

Nore ius

Spessar

Warnick

Davis

e'<<iy/

np/

RIII

K plr