Forwards IE Insp Rept 50-316/81-27 on 811015-16.No Noncompliance Noted
ML17319B074
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/28/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B075 List:
References
NUDOCS 8111090680
Download: ML17319B074 (3)


See also: IR 05000316/1981027

Text

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

s

g(g/(@

s

6 teat~

II,

Gentlemen:

This refers to the routine safety inspection

conducted

by Mr,

W. J.

Key

of this office on October 15-16,

1981, of activities at D.

C.

Cook Nuclear

Plant, Unit 2, authorized by NRC Operating License No. DPR-74 and to the

discussion of our findings with Mr. E. L. Townley and others of your staff

at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

No items of noncompliance with NRC requirements

were identified during

the course of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document

Room. If this report contains

any information that you or

your contractors believe to be exempt from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within seven

(7)

days

from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

accompanied

by an affidavit executed

by the owner of the information which

l

8111090680

811028

PDR

ADOCK 05000316

G

PDR

Zw Ql

sgI(

( V

t

1

P

l

I'

American Electric Power Service

- 2-

Coporation

0GT

2 8

198I:.

identifies the document or part sought to be withheld,

and which contains

a full statement

of the reasons

which are the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires

the statement

to address

with specificity the considerations

listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

incorporated

as far as possible into a separate

part of the affidavit. If

we,do not hear from you in this regard within the specified periods noted

above,

a copy of this letter and the enclosed

inspection report will be

placed in the Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

3'Orfgfn~1 SJgno4 by C,E+

QQ~)jgg"'.

E. Norelius, Director

Division of Engineering

and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-316/81-27

cc w/encl:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

RI I

RIII

RIII

,..., <~<<,uk@'..

%@

10/27/81

R~II

Williams

f~'(4

RIII

rq ius

Lb/or