ML17319B039

From kanterella
Jump to navigation Jump to search
Forwards IE Enforcement Conference Repts 50-315/81-20 & 50-316/81-23 on 810804.No Noncompliance Noted
ML17319B039
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/03/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B040 List:
References
NUDOCS 8109150129
Download: ML17319B039 (3)


See also: IR 05000315/1981020

Text

Docket No.

50-315'ocket

No. 50-316

Aaerican Electric Pover Service

Corporatioa

Indiana

aad Michigan. Power Coepany

ATTN:

Mr. John E. Dolan

Vice Chairaaa

Engiaeeriag

2 Broadway

Nev York, NT-

10004

IE HQ FILE COPY

48fg j

04 ig4a4 eaL~~

+++4%

Gent leaen:

'

This refers to thc Eaforceaent

Confereace

held oa August 4,

1981, at the

Nuclear Regulatory Coeafssioa

Regioa ?II office ia Glca Ellya, Illinois,

betveea

me and aeebers

of my st~ff aad you and acabers

of your staff for

the purpose of discussing

recent events involvtag thc operatioa of the

D. C. Cook Nuclear Plaat vhich arc of concern to the

NRC.

The enclosed

copy of our- report of this Enforceaent

Conference identifies

areas

discussed

during the aeetiag.

No itcas of noncoapliaacc vith NRC rcquireceats

werc identified during the

course of this meeting.

During this Enforccsecat

Conference

you agreed to develop

a coeprcheasive

plan

for upgrading your aanageaent

controls in connection vith the D.

C.

Cook

facility.

Ve left it that you would get back to us with a date vhen an

overall plan of action vould be available

so that ve could schedule

another

aeeting to revicv the plan in detail,

Subsequent

to the aeetiag,

Mr. Hunter

telephoned

ae to inform me that you had hired

a consultaat

to assist

in the

dcvelopoent of'our upgrading plan, that interviews of a ausLber of persoas

throughout your organisation vere planned,

and that

a fira schedule

for

dcvelopsM.'nt

and iapleaentation

of thc overall plan could aot be established

until the iatervievs vere coaplctcd.

While ve support this action, it is

requested

that you provide us vith aa approxiaatc

time fraae

when you will

be able to eeet vith us to discuss

your longer range actions.

Additionally,

p!case sumarizc briefly the short tena corrective actioas

taken to aiaiaizc

the types of events that

fondled the bases

for this.Eaforccjscnt

Conference.

Ia accordance vith 10 CFR 2.790 of the Coaeission's

rcgulatioas,

a copy of

this Icttcr and the cac}osc d inspection report will be placed in the NRC's

Public Docuaeat

Rooe.

If this report contains

aay inforaation that you or

your contractors believe to be exearpt

from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within seven

(7)

8109150129

810903

POR

ADQCK 05000315

0

PDA

gyo

Asieriran Electric

Power Service

Corporstioa

2

SEP

~

'days

froa

t.he date of this letter of your intention to file a request

for

withholding; and (b) subait within tveaty-five (25) days froa the date of

this letter

a written applicatioa to this office to vithhold such infor-

isstion.

Section 2.790(b)(1) requires that any such application must

be

accoepaaied

by an affidavit executed

by the owner of the infornatson which

ideatifics the docaaeat

or part sought to be vithheld,

and which contains

a full'tatcoent of the reasoas

vhich are the bases

for thc claiis that thc

inforaatioa should be vithheld free public disclosure.

This section further

requires .the stateaeat,

to address vith specificity the coasideratioas

listed

in 10 CFR 2.790(b)(4).

The inforaatioa",sought

to be vithhcld shall

be

incorporated

as far~as possible. into~a separate. part of the affidavit. lf

ve do aot hear free:yoa in this .rcgardivithin the specified periods

noted

above,

a copy of this letter'and: the enclosed

inspection report vill be

placed: ia the Public Docnacnt. Roea.

~

Ve- vil) gladly-discuss

any questionssyoa

have concerning this report.

4 t

~

Sincerely,

Orlgfnat @fined

Sy'aacs

6

Keppler

James

G

Kepplcr

Director

Enclosure:

IE Inspection

Report".Ho.

50 315/81

20

aad

No.

50 316/Sl"23

cc v/cacl:

D. V. Shaller, Plant

Nanager

DtS/Doeuaeat

Control Desk

(RED8)

Resident

Inspector., RIII

Ronald Callea,

Michigan

Public Service: Coeaission

R?11

I

p,rY (-

Swans n/jp

8/27/8l

"jig/'iI

6/Q)1

RIII (

RII I

5(4

gCI

'~

Knop

Spessard

Rill

Davis

a/

i

Rill

Kc

lc r

.>lb'