ML17319A983

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-316/81-17 on 810518,19 & 0623-25.No Noncompliance Noted
ML17319A983
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/14/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
Shared Package
ML17319A984 List:
References
NUDOCS 8107270112
Download: ML17319A983 (3)


See also: IR 05000316/1981017

Text

Docket No. 50-316

American El'ectric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E..Dolan

Vice Chairman

Engineering

2 .Broadway

New York, NY

10004

g '.Qu(

)

uAi

<g/]y@

4-

5

g

g'HLE COP

Gentlemen:

This refers to the routine safety .inspection

conducted by Messrs.

J.

B. Hopkins, I. N. Jackiw and E.

R.

Swanson of this office on May 18,

19 and June 23-25,

1981, of activities at D.C.

Cook Nuclear Plant, Unit 2,

authorized by NRC Operating License No. DPR-74 and to the discussion of

our findings by telephone with Mr. D. Shaller

on July 2, 1981.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

No items of noncompliance with NRC requirements

were identified during the

course of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document

Room. If this report contains

any information that

you or your contractors believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone

within seven

(7) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter

a written application to this office to

withhold such information.

Section 2.790(b)(1)

requires that any such

application must be accompanied

by an affidavit executed

by the owner of

the information which identifies the document or part sought to be withheld,

and which contains

a full statement

of the reasons

on the basis

which it

is claimed that the information should be withheld from public disclosure.

8107270112

810714

6

PDR

ADOCK 05000316,

PDR

American Electric Power

Service Corporation

~JUL

1 4>S8

This section further requires

the statement

to address

with specificity

the considerations listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall be incorporated

as far as possible into a .separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above,

a copy of this letter and the enclosed

inspection report will be placed in the Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

g KYAT~'~

C. E. Norelius, Acting Director

Division of Engineering

and

Technical Inspection

.Enclosure:

IE Inspection

Report No. 50-316/81-17

cc w/encl:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

RI I

RIII

kins/db

a kiw

II

/9/81

Hayes

7 rv 5'/

RI

Sp

ard

RIII

NotI/ius

~h~lui

j

'

'4