ML17319A971
| ML17319A971 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/17/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. |
| Shared Package | |
| ML17319A972 | List: |
| References | |
| NUDOCS 8107240474 | |
| Download: ML17319A971 (2) | |
See also: IR 05000315/1981003
Text
July 17,
1981
Docket No. 50-315
Docket No. ~0-816
American Electric Power Service
Corporation
and Michigan Power
Company
ATTN:
Mr,. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
Gentlemen:
~E FlLE COPY,
p, II/co
(
Thank you for your letter dated
June 26, 1981, informing us of the steps
you have taken to correct the noncompliance
which we brought to your
attention in Inspection Reports
No. 50-315/81-03
and No. 50-316/81-03
forwarded by our letter dated
May 19,
1981.
We will examine these matters
during
a subsequent
inspection.
With respect
to item 1,
we note that your letter does not discuss
corrective
actions taken.
Specific detail concerning item 1.b.
(RFC-DC-12-1814)
corrective action is requested in accordance
with 10 CFR 2.201.
With
regard to the remaining items
we will examine these matters
during
a
subsequent
inspection.
Your cooperation with us is appreciated.
Sincerely,
- gg~
R.
. Heishman,
Acting Director
Division of Resident,
and
Project Inspection
cc:
D. V. Shaller, Plant
Manager
DMB/Document Control Desk
(RIDS)
Resi.dent Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
//(
RIII
RIII
Swanson/db
Hayes
7/16/81
Y
8i07240474
810717
ADOCK 05000315
l 8
RIII
Knop
RIII
Heishman
III<
k