Forwards IE Insp Repts 50-315/81-10 & 50-316/81-07 on 810316-17,25-27,0406-08,22 & 810504-05.No Noncompliance Noted
ML17319A929
Person / Time
Site: Cook  
Issue date: 05/28/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17319A930 List:
References
NUDOCS 8106120308
Download: ML17319A929 (4)


See also: IR 05000315/1981010

Text

(

gp(( (If( y

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II I

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOIS60137

yn 6/pcc. Ccc+rcl

MAY 8 ~

198t

!E Flg C~g

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. Joh'n E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the routine safety inspection

conducted

by Mr.

W. J.

Key

of this office on March 16-17, 25-27, April 6-8, 22,

and May 4-5,

1981,

of activities at Donald C.

Cook Nuclear Plant, Units

1 and 2, authorized

by NRC Operating Licenses

No. DPR-58 and No. DPR-74 and to the discussion

of our findings with Mr. D. V. Shaller

and others of your staff at the

conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted

of a selective

examination of procedures

and representative

records,

observations,

and

interviews with personnel.

No items of noncompliance with NRC requirements

were identified during

the course of this inspection.

In accordance

with 10

CFR 2.790 of the Commission's regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the NRC's

Public Document

Room. If this report contains

any information that you or.

your contractors

believe to be exempt from disclosure

under

10

CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within seven

(7)

days

from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter

a written application to this office to withhold such infor-

mation.

Section 2.790(b)(l) requires that any such application must be

COpY SENT BEG)ON

8106 ls 04~8

c

M

American Eletric Power

Service Corporation

MAY 2 8

1S81

accompanied

by an affidavit executed

by the owner of the information

which identifies the document or part sought to be withheld,

and which

contains

a full statement of the reasons

on the basis

which it is claimed

that the information should be withheld from public disclosure.

This

section further requires

the statement

to address with specificity the

considerations

listed in 10

CFR 2.790(b)(4).

The information sought to

be withheld shall be incorporated

as far as possible into a separate

part

of the affidavit. If we do not hear from you in this regard within the

specified periods

noted above,

a copy of this letter and the enclosed

inspection report will be placed in the Public Document

Room.

Ve will gladly discuss,

any questions

you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering

and

Technical Inspection

Enclosure:

IE Inspection

Reports

No. 50-315/81-10

and No. 50-316/81-07

cc w/encl:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission