Submits Supplemental Info to Re Insp Repts 50-315/80-20 & 50-316/80-16.Requests Written Statement in Reply to Item of Noncompliance Noted,Corrective Actions Taken & Results Achieved within 25 Days of Ltr
ML17319A811
Person / Time
Site: Cook  
Issue date: 03/31/1981
From: Heishman R, Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 8104270181
Download: ML17319A811 (4)


See also: IR 05000315/1980020

Text

" t1arch 31,

1981

CFNtRAL FOAL@

Docket Ho..50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana and Michigan Power Company

ATTN:

Mr. John

E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

O~

'W

~ggjp

~ 198y

Gentlemen:

This letter supplements

our letter of March 12,

1981 regarding Inspection

Report

Ho. 50-315/80-20aand

50-316/80-16

forwarded by our letter dated

January 23, 1981.

Mith regard to Item

1 of Appendix A of the subject letter we will examine

this matter during a subsequent

inspection.

With regard to your response

to Item 2 of Appendix A, we feel that

a mis-

understanding

has

been created

Qy a misstatement

contained in Item 4.c.

of the Details section of the inspection report.

Specifically, the worl

'accuracy'as

inappropriately used,

where the intended

meaning

was

'Precision!'tem 4,c should

have read as follows:

....Reference

values provide

a basis for establishing

acceptable

instrument precision not only to comply with

ASME Section XI requirements,

but to provide confidence

in test data

used to measure

pump performance

and estab-

lish pump operability.

It was not our intent to challenge your ability to comply with paragraphs

IMP 4110 'guality'r IMP 4113 'Calibration's

addressed

in your response.

Paragraph

IMP 4111 '.Range'tates,

"The full scale

range of each instrument

shall

be not greater

than four times the reference value"...

It is our

position that compliance with paragraphs

IMP 4110 and

IMP 4111 together,

assures

a nominal precision with which pump inlet pressure

is measured.

The maximum range requirement of paragraph

IMP 4111 is expressed

in terms

of the reference

value required to be established

in accordance

with

paragraph

IMP 3110.

8 >048 ~O i'(

OFF ICEtF

SURNAME/

DATEP

3/27/81'III

~ ~ ~ ~ ~ ~

~

/'

Pesc el/cs

RIII

H.)-.e"~

3la7I&(

RII

Bak

r,'I

II,,

C'n'nn'a ug Ptl~h "

a..u..6'l...

RIII

Heis

an

3

Z

NRC FORM 3I8 IIO/80I NRCM 0240

OFFICIAL RECORD COPY

  • USGPO: I980-329 BI

0

I

ll

I

0

>J,l l

  • 5

> I

%y/

~

4

RbI '

American Electric Power Service

Corporation

March 31,

1981

'The item of noncompliance

was issued against

the requirements

of ASME

Section XI, paragraph

IWP 3110 pursuant to 10 CFR 50.55a(g)

and remains

an item of noncompliance

in the absence of specific written relief from

these

requirements

granted

by the

NRC.

We request that you submit, within 25 days of this letter,

a written

'tatement

or explanation 'in reply for this i tem of noncompliance

including:

(1) corrective action taken

and results

achieved;

(2) corrective action to

be taken to avoid further noncompliance:

and '(3) the date

when full comp-

liance will be achieved.

Your cooperation with us is appreciated.

Sincerely,

R.

F. Heishman, Acting Director

Division of Resident

and

Project Inspecti on-.

CC:

Mr.

D.

V. Shaller,

Plant

Manager

Central

Files

Reproduction Unit NRC 20b

AEOD

Resident

Inspector, RIII

PDR

Local

PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service

Commission

0