ML17319A811
| ML17319A811 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/31/1981 |
| From: | Heishman R, Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC. |
| References | |
| NUDOCS 8104270181 | |
| Download: ML17319A811 (4) | |
See also: IR 05000315/1980020
Text
" t1arch 31,
1981
CFNtRAL FOAL@
Docket Ho..50-315
Docket No. 50-316
American Electric Power Service
Corporation
Indiana and Michigan Power Company
ATTN:
Mr. John
E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
O~
'W
~ggjp
~ 198y
Gentlemen:
This letter supplements
our letter of March 12,
1981 regarding Inspection
Report
Ho. 50-315/80-20aand
50-316/80-16
forwarded by our letter dated
January 23, 1981.
Mith regard to Item
1 of Appendix A of the subject letter we will examine
this matter during a subsequent
inspection.
With regard to your response
to Item 2 of Appendix A, we feel that
a mis-
understanding
has
been created
Qy a misstatement
contained in Item 4.c.
of the Details section of the inspection report.
Specifically, the worl
'accuracy'as
inappropriately used,
where the intended
meaning
was
'Precision!'tem 4,c should
have read as follows:
....Reference
values provide
a basis for establishing
acceptable
instrument precision not only to comply with
ASME Section XI requirements,
but to provide confidence
in test data
used to measure
pump performance
and estab-
lish pump operability.
It was not our intent to challenge your ability to comply with paragraphs
IMP 4110 'guality'r IMP 4113 'Calibration's
addressed
in your response.
Paragraph
IMP 4111 '.Range'tates,
"The full scale
range of each instrument
shall
be not greater
than four times the reference value"...
It is our
position that compliance with paragraphs
IMP 4110 and
IMP 4111 together,
assures
a nominal precision with which pump inlet pressure
is measured.
The maximum range requirement of paragraph
IMP 4111 is expressed
in terms
of the reference
value required to be established
in accordance
with
paragraph
IMP 3110.
8 >048 ~O i'(
OFF ICEtF
SURNAME/
DATEP
3/27/81'III
~ ~ ~ ~ ~ ~
~
/'
Pesc el/cs
RIII
H.)-.e"~
3la7I&(
RII
Bak
r,'I
II,,
C'n'nn'a ug Ptl~h "
a..u..6'l...
RIII
Heis
an
3
Z
NRC FORM 3I8 IIO/80I NRCM 0240
OFFICIAL RECORD COPY
- USGPO: I980-329 BI
0
I
ll
I
0
>J,l l
- 5
> I
%y/
~
4
RbI '
American Electric Power Service
Corporation
March 31,
1981
'The item of noncompliance
was issued against
the requirements
of ASME
Section XI, paragraph
IWP 3110 pursuant to 10 CFR 50.55a(g)
and remains
an item of noncompliance
in the absence of specific written relief from
these
requirements
granted
by the
NRC.
We request that you submit, within 25 days of this letter,
a written
'tatement
or explanation 'in reply for this i tem of noncompliance
including:
(1) corrective action taken
and results
achieved;
(2) corrective action to
be taken to avoid further noncompliance:
and '(3) the date
when full comp-
liance will be achieved.
Your cooperation with us is appreciated.
Sincerely,
R.
F. Heishman, Acting Director
Division of Resident
and
Project Inspecti on-.
CC:
Mr.
D.
V. Shaller,
Plant
Manager
Central
Files
Reproduction Unit NRC 20b
Resident
Inspector, RIII
Local
Ronald Callen, Michigan
Public Service
Commission
0