ML17319A756

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required
ML17319A756
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/02/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 8103160481
Download: ML17319A756 (3)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Hichigan Power Company ATTN:

Hr. John E. Dolan Vice Chairman

, Engineering 2 Broadway New York, NY 10004 cc w/encl:

D. $. Shaller Plant Hanager gpR'tral Files AD/Licensing AD/Operating Reactors AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Hichigan Public Service Commission

RE00, Mp

~4 0

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS60137 March 2, 1981 Gentlemen:

The enclosed IE Circular No. 81-03 is forwarded for your information.

No written response to this circular is required.

If you have any questions related to this matter, please contact this office.

Sincerely, r

ti.'8 W2=

~ James G. Keppler Director

Enclosure:

IE Circular No. 81-03