Notice of Violation from Insp on 801117-21 & 810113
ML17319A752
Person / Time
Site: Cook  
Issue date: 01/23/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17319A751 List:
References
50-315-80-20, 50-316-80-16, NUDOCS 8103130112
Download: ML17319A752 (1)


Text

AppendixA NOTICE OF VIOLATION American Electric Power Service Corporation Docket No. 50-315 Docket No. 50-316 As a result of the inspection conducted on November 17-21,

1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980) the following violations were identified:

1.

Unit 1 Technical Specification 4.1.2.3.c states that the centrifugal charging pump operability shall be demonstrated at least once per 31 days and that pump operation shall be verified for at least 15 minutes.

Contrary to the above, centrifugal charging pump 1W was run for only five minutes during the monthly surveillance conducted on June 16, 1980.

This is a Severity Level VI violation (Supplement I).

(50-315/80-20-01) 2 ~

10 CFR 50.55a(g) states that an inservice inspection system for pumps shall be established in accordance with ASME Section XI, 1974 addition and addenda through summer of 1975.

Contrary to the above, the licensee's ISI pump operability test program did not establish reference values for pump inlet pressure as required by ASME Section XI Article IWP-3110.

This is a Severity Level VI violation (Supplement I).

(50-315/80-20-02)

(50-316/80-16-01)

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within twenty-five days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as

amended, this response shall be submitted under oath or affirmation.

January 23, 1981 Dated

. F. Heishman, Chief Reactor Operations and Nuclear Support Branch