ML17319A617
| ML17319A617 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/21/1980 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC. |
| Shared Package | |
| ML17319A618 | List: |
| References | |
| NUDOCS 8009260628 | |
| Download: ML17319A617 (3) | |
See also: IR 05000315/1980012
Text
<gS RE0I
(4
0
Cy
A.n
C
0
<r~
~O
~+*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS60137
iAUB 2
3
88m
CCXTEAL.'FlLES
Docket No. 50-315
American Electric Power Service
Corporation
ATTN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
Gentlemen:
This refers to the routine inspection
conducted
by Mr. L. J. Hueter of
this office on July 22-25,
1980, of activities at D.
C.
Cook Nuclear
Plant, Unit
1 authorized
by NRC Operating License
No. DPR-58
and to the
discussion of our findings with Mr. D. Shaller
and others of his staff
at the conclusion of the inspection.
The inspection
was an examination of activities conducted
under your
license
as they relate to radiation safety
and to compliance with the
Commission's
rules
and regulations
and with the conditions of your
license.
The inspection consisted of 'a selective
examination of pro-
cedures
and representativ'e
records,
observations,
independent
measure-
ments,
and interviews with personnel.
The inspection included
a review of your action taken in response
to (1)
IE Bulletin 80-10 concerning contamination of non-r'adioactive
system
and
resulting potential for unmonitored,
uncontrolled release
of radioactivity
to the environment~(2)
IE Circular 79-15 concerning bursting of high
pressure
hose
and malfunction of relief valve and "0"-Ring in certain
selfwontained breathing apparatus~and
(3) IE Circular 80-14 concerning
radioactive
contamination of plant demineralized
water system
and
resultant internal contamination of personnel.
The inspection also
examined actions
you have taken with respect to the
matters identified in your letter dated January
29,
1980.
We have
no
further questions
regarding these matters.
Also,
a review was conducted
of the unresolved
item identified in our letter dated January
4,
1979,
regarding water in the space
between
a liner and
a shipping disk on an
April 26,
1979,
shipment.
Based
on guidance provided by IE Headquarters
and
on procedure
changes
you have
made,
we have
no further questions
regarding this matter.
) (/) 'g
American Electric Power
Service Corporation
IAUB 2
~
8801
No items of noncompliance with NRC requirements
were identified during
the course of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part
2, Title 10,
Code of Federal Regulations',
a copy of this letter and the
enclosed
inspection report will be placed in the NRC's Public Document
Room, except
as follows. If this report contains information that you
or your contractors
believe to be proprietary,
you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application must
include
a full statement of the reasons for which the information is
considered proprietary,
and should be prepared
so that proprietary
information identified in the application is contained in an enclosure
to the application.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
A. B. Davis, Chief
Fuel Facility and
Materials Safety Branch
Enclosure:
IE Inspection
Report No. 50-315/80-12
cc w/encl:
Mr. D. V. Shaller, Plant
Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspection, RIII
Iocal
Ronald Callen, Michigan Public
Service
Commission
Hueter/jp
8/1/5/80
Fisher
RII
RII
RIIQ(g
Davis
R(II
oy'd