Forwards IE Insp Rept 50-316/80-10 on 800623-27.No Noncompliance Noted
ML17319A614
Person / Time
Site: Cook 
Issue date: 08/07/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319A615 List:
References
NUDOCS 8009260304
Download: ML17319A614 (2)


See also: IR 05000316/1980010

Text

gAS REOII

~o

Cy

A,0

i

0

O~

++*+~

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAD

GLEN ELLYN.ILLINOIS60137

~AUG

v Sgl

CENTRAL FlLES

In Reply Refer To:

RII:LEF

50-316

American Electric Power Service

Corporation

Indiana and Michigan Power Company

ATTN: =Mr. John E. Dolan, Vice Chairman

Engineering and Construction

2 Broadway

New York, NY

10004

Gentlemen:

This refers

to the

inspection

conducted

by L. E. Foster

of the

Performance

Appraisal Branch on June 23-27,

1980, of activities authorized by NRC Operating

License

No. DPR-74 for the D.

C.

Cook Nuclear Plant Unit 2, and to the discussion

of our findings held with D. V. Shaller and others at the conclusion of the inspec-

tion.

This inspection

was

one of a series of appraisal

inspections

being conducted

by

the

NRC Performance

Appraisal

Branch concerning

the control of safety-related "

components.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code of Federal

Reg'ulations,

a

copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written 'application within 20 days

to this office to withhold such information from public disclosure.

Any such

application

must include

a full statement.

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should

be prepared

so

that propri'etary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

.64'0926 03O "/

American Electric Power

Service Corporation

-2-

%us

7 gaol

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No 50-316/80-10

cc w/encl:

D. V. Shaller, Plant Manager

bcc w/encl:

Central Files

Reproduction Unit NRC 20b

PDR

Iocal

PDR

NSIC

TIC

R. Callen, Michigan Public

Service

Commission

H. D. Thornburg,

IE:HQ

J. Taylor, IE:HQ

W. J. Dircks,

AEOD

PAB Staff

R. F. Heishman,'Chief

Reactor Operations

and Nuclear

Support Branch

RIII

LEFoster:aw

Of/q /80

S

fer

GP/$ /80

e

shman

0 /

/80