ML17319A555
| ML17319A555 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/08/1980 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17319A556 | List: |
| References | |
| NUDOCS 8009020227 | |
| Download: ML17319A555 (2) | |
Text
CENTRAL FILES IAUG S 68oi Docket
- o. 50-3l5~
Docket MO-316 American Blectric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E, Dolan Vice Chairman Engineering 2 Broadway New York, NY 10004
~
j Gentlemen:
Thank you for your letter dated July 8, 1980, informing us of the steps you have taken to correct the noncompliance identified in our letter dated June 10, 1980.
Ve will examine your corrective action during a future inspection.
Your cooperation with us is appreciated.
Sincerely, cc; Mr. D. V. Sheller, Plant Manager A. B. Davis, Chief
=--- Fuel Facility and
.Materials Safety Branch cc w/ltr dtd 7/8/80:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission OFFICE SuRNAMEI DATE/
5k s4 Peck/cw 8/6/80 RX Xiakez g d5 Ba.
NRO Fnrm 31IIA IR TIT1(6 71'1Nai M n7nnn c matc'nwsac'rue na<c<vsc>r. nccir c ~
~ non.son.
~ sc
~3 ) )=J fj<'-," l A ">>
I'