Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Action Required
ML17319A546
Person / Time
Site: Cook  
Issue date: 07/24/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
References
NUDOCS 8008200547
Download: ML17319A546 (2)


Text

JUL 2 4 880 Docket No. 50-315 g)ocket No. 50-316 Rbnerican Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

The enclosed IE Bulletin No. 80-18 is forwarded for action.

A written response is required.

In order to assist the NRC in evaluating the value/impact of each bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the reports required by the bulletin.

Please estimate separately the manpower associ-ated with corrective actions necessary following identification of problems through the bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James G. Keppler Director

Enclosure:

IE Bulletin No. 80-18 cc w/encl: