ML17319A545
| ML17319A545 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. |
| References | |
| NUDOCS 8008200469 | |
| Download: ML17319A545 (2) | |
Text
Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:
Mr. John E. Dolan Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:
Enclosed is IE Bulletin No. 80-19 which requires action by you with respect to your nuclear power facility..
In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the reports required by the Bulletin.
Please estimate separately the manpower associated with correc-tive actions necessary following identification of problems through the Bulletin.
Should you have any questions regarding the Bulletin or actions required by,you, please contact this office.
Sincerely, James G. Keppler Director
Enclosure:
IE Bulletin No. 80-19 cc w/encl:
Mr. D. V. Shaller, Plant Manager Central Files
- Director, NRR/DPM
- Director, NRR/DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission RIII RIII Heis an/jp eppler 7/suso 8 Ogaa p + qg ~
I Q